[Senate Report 107-68]
[From the U.S. Government Publishing Office]



                                                       Calendar No. 169
107th Congress                                                   Report
                                 SENATE
 1st Session                                                     107-68

======================================================================



 
             MILITARY CONSTRUCTION APPROPRIATION BILL, 2002
                                _______
                                

               September 25, 2001.--Ordered to be printed

                                _______
                                

         Mrs. Feinstein, from the Committee on Appropriations, 
                        submitted the following

                              R E P O R T

                         [To accompany S. 1460]

    The Committee on Appropriations reports the bill (S. 1460) 
making appropriations for military construction, family 
housing, and base realignment and closure for the Department of 
Defense for the fiscal year ending September 30, 2002, and for 
other purposes, reports favorably thereon and recommends that 
the bill do pass.

Total of bill as reported to Senate..................... $10,500,000,000
Amount of 2002 budget estimate..........................   9,971,312,000
Amount of 2001 appropriations...........................   8,936,498,000
The bill as reported to the Senate:
    Over the budget estimate, 2002......................     528,688,000
    Over appropriations for fiscal year 2001............   1,563,502,000


                            C O N T E N T S

                              ----------                              
                                                                   Page
Background:
    Purpose of the bill..........................................     3
    Comparative statement........................................     3
    Compliance with section 308 of the Budget Control Act........     9
Committee recommendation.........................................     9
Items of special interest........................................    10
Military construction, Army......................................    16
Military construction, Navy......................................    17
Military construction, Air Force.................................    18
Military construction, Defense-wide..............................    19
Military construction, Reserve components........................    24
NATO Security Investment Program.................................    27
Family housing overview..........................................    27
Family housing, Army.............................................    27
Family housing, Navy and Marine Corps............................    28
Family housing, Air Force........................................    30
Family housing, Defense-wide.....................................    31
Family housing improvement fund..................................    31
Homeowners assistance fund, Defense..............................    31
Base realignment and closure account, part IV....................    32
General provisions...............................................    35
Compliance with paragraph 7, rule XVI of the Standing Rules of 
  the Senate.....................................................    36
Compliance with paragraph 12, rule XXVI of the Standing Rules of 
  the Senate.....................................................    36
Project listing by location......................................    37

                               BACKGROUND

                          Purpose of the Bill

    The Military Construction appropriation bill provides 
necessary funding for the planning, design, construction, 
alteration, and improvement of military facilities worldwide, 
both for Active and Reserve Forces. It also finances the 
construction, alteration, improvement, operation, and 
maintenance of military family housing, including payments 
against past housing mortgage indebtedness. Certain types of 
community impact assistance may be provided, as well as 
assistance to members of the military who face loss on the sale 
of private residences due to installation realignments and 
closures. The bill is also the source for the U.S. share of the 
NATO Security Investment Program. In addition, the bill 
provides funding to implement base closures and realignments 
authorized by law.

                         Comparative Statement

    The Committee recommends appropriations totaling 
$10,500,000,000 for fiscal year 2002 military construction, 
family housing, and base closure. The following table displays 
the Committee recommendation in comparison with the current 
fiscal year, and the President's fiscal year 2002 request.

                                              COMPARATIVE STATEMENT OF NEW BUDGET (OBLIGATIONAL) AUTHORITY
                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                   Increase (+) or decrease (-) compared
                                                                                                   Committee                      with--
                        Item                             2001 enacted       Budget estimate     recommendation   ---------------------------------------
                                                                                                                     2001 enacted       Budget estimate
--------------------------------------------------------------------------------------------------------------------------------------------------------
Military construction, Army.........................            907,878           1,760,541           1,668,957            +761,079             -91,584
    Foreign currency fluctuation adjustment.........               -635   ..................  ..................               +635   ..................
    Rescission......................................  ..................  ..................            -26,400             -26,400             -26,400
    Miscellaneous appropriations (Public Law 106-                26,941   ..................  ..................            -26,941   ..................
     554)...........................................
    Supplemental appropriations (Public Law 107-20).              9,144   ..................  ..................             -9,144   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................            943,328           1,760,541           1,642,557            +699,229            -117,984

Military construction, Navy.........................            929,113           1,071,408           1,148,633            +219,520             +77,225
    Foreign currency fluctuation adjustment.........             -2,889   ..................            -19,588             -16,699             -19,588
    Rescission......................................  ..................  ..................  ..................  ..................  ..................
    Supplemental appropriations (Public Law 107-20).              3,187   ..................  ..................             -3,187   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................            929,411           1,071,408           1,129,045            +199,634             +57,637

Military construction, Air Force....................            868,294           1,068,250           1,148,269            +279,975             +80,019
    Rescission......................................  ..................  ..................             -4,000              -4,000              -4,000
    Miscellaneous appropriations (Public Law 106-                11,974   ..................  ..................            -11,974   ..................
     554)...........................................
    Supplemental appropriations (Public Law 107-20).              5,065   ..................  ..................             -5,065   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................            885,333           1,068,250           1,144,269            +258,936             +76,019

Military construction, Defense-wide.................            819,954             694,558             881,058             +61,104            +186,500
    Foreign currency fluctuation adjustment.........             -7,115   ..................  ..................             +7,115   ..................
    Rescissions.....................................  ..................  ..................            -69,280             -69,280             -69,280
    Supplemental appropriations (Public Law 107-20).            -14,376   ..................  ..................            +14,376   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................            798,463             694,558             811,778             +13,315            +117,220
                                                     ---------------------------------------------------------------------------------------------------
      Total, Active components......................          3,556,535           4,594,757           4,727,649          +1,171,114            +132,892

Military construction, Army National Guard..........            281,097             267,389             378,549             +97,452            +111,160
    Miscellaneous appropriations (Public Law 106-                 4,490   ..................  ..................             -4,490   ..................
     554)...........................................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................            285,587             267,389             378,549             +92,962            +111,160

Military construction, Air National Guard...........            203,381             149,072             222,767             +19,386             +73,695
    Supplemental appropriations (Public Law 107-20).              6,700   ..................  ..................             -6,700   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................            210,081             149,072             222,767             +12,686             +73,695

Military construction, Army Reserve.................            108,499             111,404             111,404              +2,905   ..................
Military construction, Naval Reserve................             64,331              33,641              33,641             -30,690   ..................
    Rescission......................................             -2,400   ..................               -925              +1,475                -925
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................             61,931              33,641              32,716             -29,215                -925

Military construction, Air Force Reserve............             36,510              53,732              53,732             +17,222   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Reserve components.....................            702,608             615,238             799,168             +96,560            +183,930
                                                     ===================================================================================================
      Total, Military construction..................          4,259,143           5,209,995           5,526,817          +1,267,674            +316,822
          Appropriations............................         (4,261,543)         (5,209,995)         (5,627,422)        (+1,365,879)          (+417,427)
          Rescissions...............................            (-2,400)  ..................          (-100,605)           (-98,205)          (-100,605)
                                                     ===================================================================================================
NATO Security Investment Program....................            171,622             162,600             162,600              -9,022   ..................
                                                     ===================================================================================================
Family housing, Army:
    New construction................................            165,459              59,200              80,400             -85,059             +21,200
    Construction improvements.......................             63,450             220,750             220,750            +157,300   ..................
    Planning and design.............................              6,528              11,592              11,592              +5,064   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Subtotal, construction........................            235,437             291,542             312,742             +77,305             +21,200

    Operation and maintenance.......................            969,566           1,108,991           1,108,991            +139,425   ..................
    Foreign currency fluctuation adjustment.........            -19,911   ..................  ..................            +19,911   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Subtotal, operation and maintenance...........            949,655           1,108,991           1,108,991            +159,336   ..................

    Supplemental appropriations (Public Law 107-20).             26,480   ..................  ..................            -26,480   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Family housing, Army...................          1,211,572           1,400,533           1,421,733            +210,161             +21,200

Family housing, Navy and Marine Corps:
    New construction................................            204,669             114,847             123,047             -81,622              +8,200
    Construction improvements.......................            192,652             183,054             183,054              -9,598   ..................
    Planning and design.............................             19,914               6,499               6,499             -13,415   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Subtotal, construction........................            417,235             304,400             312,600            -104,635              +8,200

    Operation and maintenance.......................            880,696             918,095             918,095             +37,399   ..................
    Foreign currency fluctuation adjustment.........             -1,071   ..................  ..................             +1,071   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Subtotal, operation and maintenance...........            879,625             918,095             918,095             +38,470   ..................

    Supplemental appropriations (Public Law 107-20).             20,300   ..................  ..................            -20,300   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Family housing, Navy and Marine Corps..          1,317,160           1,222,495           1,230,695             -86,465              +8,200

Family housing, Air Force:
    New construction................................             71,857             140,800             150,800             +78,943             +10,000
    Construction improvements.......................            173,663             352,879             375,345            +201,682             +22,466
    Planning and design.............................             12,732              24,558              24,558             +11,826   ..................
    Foreign currency fluctuation adjustment.........             -6,839   ..................  ..................             +6,839   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Subtotal, construction........................            251,413             518,237             550,703            +299,290             +32,466

    Operation and maintenance.......................            824,453             869,121             869,121             +44,668   ..................
    Foreign currency fluctuation adjustment.........             -5,392   ..................  ..................             +5,392   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Subtotal, operation and maintenance...........            819,061             869,121             869,121             +50,060   ..................

    Supplemental appropriations (Public Law 107-20).             13,625   ..................  ..................            -13,625   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Family housing, Air Force..............          1,084,099           1,387,358           1,419,824            +335,725             +32,466

Family housing, Defense-wide:
    Construction improvements.......................  ..................                250                 250                +250   ..................
    Operation and maintenance.......................             44,787              43,762              43,762              -1,025   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Family housing, Defense-wide...........             44,787              44,012              44,012                -775   ..................

Department of Defense Family Housing Improvement      ..................              2,000               2,000              +2,000   ..................
 Fund...............................................
Homeowners assistance fund, Defense.................  ..................             10,119              10,119             +10,119   ..................
    (By transfer)...................................  ..................  ..................  ..................  ..................  ..................
                                                     ===================================================================================================
      Total, Family housing.........................          3,657,618           4,066,517           4,128,383            +470,765             +61,866
          New construction..........................           (441,985)           (314,847)           (354,247)           (-87,738)           (+39,400)
          Construction improvements.................           (429,765)           (756,933)           (779,399)          (+349,634)           (+22,466)
          Foreign currency fluctuation adjustment...            (-6,839)  ..................  ..................            (+6,839)  ..................
          Planning and design.......................            (39,174)            (42,649)            (42,649)            (+3,475)  ..................
          General reduction.........................  ..................  ..................  ..................  ..................  ..................
          Operation and maintenance.................         (2,779,907)         (2,939,969)         (2,939,969)          (+160,062)  ..................
          Foreign currency fluctuation adjustment...           (-26,374)  ..................  ..................           (+26,374)  ..................
          Family Housing Improvement Fund...........  ..................             (2,000)             (2,000)            (+2,000)  ..................
          Homeowners Assistance Fund................  ..................            (10,119)            (10,119)           (+10,119)  ..................
          (By transfer).............................  ..................  ..................  ..................  ..................  ..................
                                                     ===================================================================================================
Base realignment and closure accounts:
    Part IV.........................................          1,022,115             532,200             682,200            -339,915            +150,000
    Supplemental appropriations (Public Law 107-20).              9,000   ..................  ..................             -9,000   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total.........................................          1,031,115             532,200             682,200            -348,915            +150,000

                 GENERAL PROVISIONS

General provision (sec. 129)........................           -100,000   ..................  ..................           +100,000   ..................
Foreign currency account (sec. 132).................            -83,000   ..................  ..................            +83,000   ..................
                                                     ===================================================================================================
      Grand total:
          New budget (obligational) authority.......          8,936,498           9,971,312          10,500,000          +1,563,502            +528,688
              Appropriations........................         (8,938,898)         (9,971,312)        (10,600,605)        (+1,661,707)          (+629,293)
              Rescissions...........................            (-2,400)  ..................          (-100,605)           (-98,205)          (-100,605)
              (By transfer).........................  ..................  ..................  ..................  ..................  ..................
                                                     ===================================================================================================
         SUMMARY OF APPROPRIATIONS ACCOUNTS

Military Construction, Army.........................            943,328           1,760,541           1,642,557            +699,229            -117,984
Military Construction, Navy.........................            929,411           1,071,408           1,129,045            +199,634             +57,637
Military Construction, Air Force....................            885,333           1,068,250           1,144,269            +258,936             +76,019
Military Construction, Defense-wide.................            798,463             694,558             811,778             +13,315            +117,220
                                                     ---------------------------------------------------------------------------------------------------
      Total, Active components......................          3,556,535           4,594,757           4,727,649          +1,171,114            +132,892

Military Construction, Army National Guard..........            285,587             267,389             378,549             +92,962            +111,160
Military Construction, Air National Guard...........            210,081             149,072             222,767             +12,686             +73,695
Military Construction, Army Reserve.................            108,499             111,404             111,404              +2,905   ..................
Military Construction, Naval Reserve................             61,931              33,641              32,716             -29,215                -925
Military Construction, Air Force Reserve............             36,510              53,732              53,732             +17,222   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Reserve components.....................            702,608             615,238             799,168             +96,560            +183,930
                                                     ===================================================================================================
      Total, Military Construction..................          4,259,143           5,209,995           5,526,817          +1,267,674            +316,822
                                                     ===================================================================================================
North Atlantic Treaty Organization Security                     171,622             162,600             162,600              -9,022   ..................
 Investment Program.................................
                                                     ===================================================================================================
Family Housing, Army:
    Construction....................................            235,437             291,542             312,742             +77,305             +21,200
    Operation and Maintenance.......................            976,135           1,108,991           1,108,991            +132,856   ..................
Family Housing, Navy and Marine Corps:
    Construction....................................            417,235             304,400             312,600            -104,635              +8,200
    Operation and Maintenance.......................            899,925             918,095             918,095             +18,170   ..................
Family Housing, Air Force:
    Construction....................................            251,413             518,237             550,703            +299,290             +32,466
    Operation and Maintenance.......................            832,686             869,121             869,121             +36,435   ..................
Family Housing, Defense-wide:
    Construction....................................  ..................                250                 250                +250   ..................
    Operation and Maintenance.......................             44,787              43,762              43,762              -1,025   ..................
Department of Defense Family Housing Improvement      ..................              2,000               2,000              +2,000   ..................
 Fund...............................................
Homeowners Assistance Fund, Defense.................  ..................             10,119              10,119             +10,119   ..................
                                                     ---------------------------------------------------------------------------------------------------
      Total, Family Housing.........................          3,657,618           4,066,517           4,128,383            +470,765             +61,866
                                                     ===================================================================================================
Base Realignment and Closure Account................          1,031,115             532,200             682,200            -348,915            +150,000
General Provisions..................................           -183,000   ..................  ..................           +183,000   ..................
                                                     ===================================================================================================
      Grand Total...................................          8,936,498           9,971,312          10,500,000          +1,563,502            +528,688
--------------------------------------------------------------------------------------------------------------------------------------------------------

         Compliance With Section 308 of the Budget Control Act

    Section 308(a) of the Budget and Impoundment Control Act of 
1974 (Public Law 93-344) requires that the Committee include in 
its report a comparison of its recommendations with levels 
contained in the first concurrent resolution. Appropriate data 
are reflected below:

                                            BUDGETARY IMPACT OF BILL
  PREPARED IN CONSULTATION WITH THE CONGRESSIONAL BUDGET OFFICE PURSUANT TO SEC. 308(a), PUBLIC LAW 93-344, AS
                                                     AMENDED
                                            [In millions of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                  Budget authority               Outlays
                                                             ---------------------------------------------------
                                                               Committee    Amount  of   Committee    Amount  of
                                                               allocation      bill      allocation      bill
----------------------------------------------------------------------------------------------------------------
Comparison of amounts in the bill with Committee allocations
 to its subcommittees of amounts in the First Concurrent
 Resolution for 2002: Subcommittee on Military Construction:
    General purpose, defense................................       10,500       10,500           NA           NA
    General purpose, non-defense............................  ...........  ...........           NA           NA
    General purpose, total..................................       10,500       10,500        9,284    \1\ 9,253
Projections of outlays associated with the recommendation:
    2002....................................................  ...........  ...........  ...........    \2\ 2,741
    2003....................................................  ...........  ...........  ...........        4,026
    2004....................................................  ...........  ...........  ...........        2,310
    2005....................................................  ...........  ...........  ...........          794
    2006 and future years...................................  ...........  ...........  ...........          598
Financial assistance to State and local governments for 2002           NA  ...........           NA  ...........
----------------------------------------------------------------------------------------------------------------
\1\ Includes outlays from prior-year budget authority.
\2\ Excludes outlays from prior-year budget authority.

NA: Not applicable.

                        Committee Recommendation

    The Committee recommends new fiscal year 2002 
appropriations of $10,500,000,000. This is $528,688,000 over 
the budget request, and $1,563,502,000 over the appropriations 
for fiscal year 2001. The basis for this recommendation is 
contained in the following ``Items of special interest,'' and 
under the discussions pertaining to each individual 
appropriation. Complete project detail is provided in the 
tables at the end of the report.

                       ITEMS OF SPECIAL INTEREST

                   COMPLIANCE WITH 302(b) ALLOCATION

    The Appropriations Committee conformed fully to the budget 
resolution for defense spending in its 302(b) allocation. This 
allocation divided the budget authority and outlays among the 
subcommittees with jurisdiction over discretionary spending. In 
this recommended bill, the Appropriations Committee has 
remained within the tight constraints of its 302(b) allocation 
for military construction.

                                hearings

    The Subcommittee on Military Construction held hearings on 
the fiscal year 2002 budget request during July and August 
2001. The subcommittee heard testimony from representatives of 
the military services and defense agencies concerning fiscal 
year 2002 budget priorities and base realignment and closure 
issues.

                  summary of committee recommendations

    The budget request for fiscal year 2002 reflects an 
increase of $1,034,814,000 from the amount enacted in fiscal 
year 2001.
    The Committee recommends an additional $528,688,000 above 
the fiscal year 2002 budget request. The total recommended 
appropriation for fiscal year 2002 is $10,500,000,000, an 
increase of $1,563,502,000 from fiscal year 2001 funding.

                   general and flag officer quarters

    The Committee is concerned about the escalating costs of 
improving and maintaining general and flag officer quarters. 
The Committee recognizes that many of these quarters are 
historic and as such, require maintenance, preservation, 
rehabilitation, and restoration beyond the normal Department of 
Defense standards. These preservation activities contribute 
significantly to the annual cost of maintaining these quarters.
    The Committee urges the Department to look for innovative 
ways to reduce these expenses while ensuring that projects are 
consistent with DOD standards and not excessive. While the 
Department of Defense should preserve these quarters as a 
historical legacy, the military services should also explore 
more cost effective ways of rehabilitating and restoring 
historic family housing, such as the use of synthetic building 
materials where appropriate.
    The Committee has again included section 125 which requires 
that the Military Construction Appropriations bill be the sole 
source of all operation and maintenance for all flag and 
general officer quarters. Based on the escalating costs of 
routine repair and maintenance activities, the Committee 
recommends that the annual limitation of expenditures for 
repairs on these quarters be raised from $25,000 to $35,000 per 
year.

                     overseas military construction

    The Committee notes the significant increase in military 
construction funding allocated for overseas bases in the fiscal 
year 2002 budget request. In all, the proposed fiscal year 2002 
overseas spending is 14.4 percent of overall specified project 
spending versus only 9.9 percent of total spending in fiscal 
year 2001. The Committee remains concerned about the adequacy 
of facilities, particularly housing, community, and 
environmental systems, at U.S. installations overseas. However, 
the Committee is also concerned that some senior U.S. 
commanders, in their efforts to improve inadequate facilities, 
may be advocating major construction and environmental programs 
that may lead to large funding commitments ahead of policy 
decisions by the Secretary of Defense.
    The Committee is aware that the Department of Defense is in 
the midst of a comprehensive review of our overseas 
installations to ensure that our presence is consistent with 
the Quadrennial Defense Review (QDR) and our long-term basing 
strategy. The Committee directs the Department to submit a 
report on the Department's overseas basing master plan to the 
congressional committees not later than April 1, 2002. The 
master plan must identify those enduring installations required 
to support our national military objectives as well as provide 
a roadmap for future stationing decisions. This report must 
take into account the issue of military training and the 
potential for restrictions on proposed training areas, 
including encroachment and environmental constraints and 
concerns. The Committee's goal is to ensure that scarce 
resources are appropriately allocated in support of our 
national security objectives and consistent with the Department 
of Defense's long range policies and plans.

                  CONFORMANCE WITH AUTHORIZATION BILL

    The Committee strongly supports the authorization-
appropriation process. However, the Committee has reported the 
appropriation bill prior to completion of the authorization 
process. Therefore, the Committee has provided construction 
funds for specific projects which were included in the Senate-
reported version of the National Defense Authorization Act for 
fiscal year 2002 and projects subject to authorization.

                          Contingency funding

    The Committee commends the Department and the military 
services for including contingency funding in the fiscal year 
2002 budget request for military construction and family 
housing projects. Adequate contingency funding is essential for 
the efficient and cost-effective execution of the overall 
construction program throughout the Department of Defense. The 
Committee strongly urges the Department to include responsible 
contingency funding in the fiscal year 2003 budget submission.

                      REPROGRAMMING RULES/CRITERIA

    The following rules apply for all military construction and 
family housing reprogrammings. A project or account (including 
the sub-elements of an account) which has been specifically 
reduced by the Congress in acting on the appropriation request 
is considered to be a congressional interest item. A prior 
approval reprogramming is required for any increase to an item 
that has specifically reduced by the Congress. Accordingly, no 
below threshold reprogrammings to an item specifically reduced 
by the Congress are permitted.
    The reprogramming criteria that apply to military 
construction projects (25 percent of the funded amount or 
$2,000,000, whichever is less) continue to apply to new housing 
construction projects and to improvements over $2,000,000. To 
provide the individual services the flexibility to proceed with 
construction contracts without disruption or delay, the costs 
associated with environmental hazard remediation such as 
asbestos removal, radon abatement, lead-based paint removal or 
abatement, and any other legislated environmental hazard 
remediation may be excluded, provided that such remediation 
requirements could not be reasonably anticipated at the time of 
budget submission. This exclusion applies to projects 
authorized in the budget year, and also projects authorized in 
prior years for which construction contracts have not been 
completed.
    Furthermore, in instances where a prior approval 
reprogramming request for a project or account has been 
approved by the Committee, the amount approved becomes the new 
base for any future increase or decrease via below threshold 
reprogrammings (provided that the project or account is not a 
congressional interest item).

                           transfer authority

    The budget request proposed a general provision which would 
allow the transfer of up to $67,000,000 between any accounts in 
the bill, and this could be accomplished at the determination 
of the Secretary of Defense and upon the approval of OMB. 
Congress would be given an ``after the fact'' notification. The 
Committee believes that the existing reprogramming procedures 
are sufficient in solving urgent, high priority funding 
problems within available resources and denies this request.

                      base realignment and closure

    The Committee has included $682,200,000 for the ``Base 
realignment and closure'' account, an increase of $150,000,000 
over the budget request. This additional funding is needed to 
address urgent, unfunded environmental remediation requirements 
at bases that have been closed or realigned.

                         barracks construction

    The fiscal year 2002 budget request includes $1,218,435,000 
to construct or modernize 60 barracks projects.
    The Committee recommends $1,246,373,000 for barracks 
construction projects in fiscal year 2002, an increase of 
$27,938,000 over the budget request. This additional funding is 
provided to help reduce the unaccompanied housing deficit and 
modernize existing barracks.

                     BARRACKS CONSTRUCTION PROJECTS
------------------------------------------------------------------------
                   Location                       Request    Recommended
------------------------------------------------------------------------
Army:
    Alaska: Fort Richardson Barracks Complex    $45,000,000  $45,000,000
     (144 spaces).............................
    Colorado: Fort Carson Barracks Complex       25,000,000   25,000,000
     (336 spaces).............................
    Hawaii:
        Schofield Barracks Barracks Complex      23,000,000   23,000,000
         (400 spaces).........................
        Wheeler Trng Range Barracks Complex      50,000,000   50,000,000
         (192 spaces).........................
    Kentucky: Fort Campbell Barracks Complex     47,000,000   47,000,000
     (104 spaces).............................
    Michigan: Augusta/Battle Creek TASS         ...........   13,318,000
     Barracks (336 spaces)....................
    Missouri: Fort Leonard Wood Basic Training   27,000,000   27,000,000
     Complex (1,200 spaces)...................
    New Jersey: Fort Monmouth Barracks Complex   20,000,000   20,000,000
     (250 spaces).............................
    North Carolina:
        Fort Bragg Basic Training Complex (352   49,000,000   49,000,000
         spaces)..............................
        Fort Bragg Basic Training Complex (228   27,000,000   27,000,000
         spaces)..............................
        Fort Bragg Basic Training Complex (330   17,500,000   17,500,000
         spaces)..............................
    South Carolina: Fort Jackson Basic           26,000,000   26,000,000
     Training Complex (1,200 spaces)..........
    Texas: Fort Hood Barracks Complex (480       41,000,000   41,000,000
     spaces)..................................
    Washington: Fort Lewis Barracks Complex      48,000,000   48,000,000
     (300 spaces).............................
    Germany:
        Bamberg Barracks Complex (282 spaces).   20,000,000   20,000,000
        Darmstadt Barracks Complex (82 spaces)    6,800,000    6,800,000
        Darmstadt Barracks Complex (82 spaces)    6,700,000    6,700,000
        Heidelberg Barracks Complex (89           6,800,000    6,800,000
         spaces)..............................
        Heidelberg Barracks Complex (132          8,500,000    8,500,000
         spaces)..............................
        Hanau Barracks Complex (105 spaces)...    7,200,000    7,200,000
    Korea:
        Camp Hovey Barracks Complex (400         33,000,000   33,000,000
         spaces)..............................
        Camp Humphreys Barracks Complex (232     14,500,000   14,500,000
         spaces)..............................
        Camp Stanley Barracks Complex (464       28,000,000   28,000,000
         spaces)..............................
                                               -------------------------
          Subtotal, Army......................  577,000,000  590,318,000
                                               =========================
Navy & Marine Corps:
    California:
        Camp Pendleton Bachelor Enlisted         21,200,000   21,200,000
         Quarters (400 spaces)................
        Camp Pendleton Bachelor Enlisted         21,600,000   21,600,000
         Quarters (400 spaces)................
        El Centro Bachelor Enlisted Quarters     23,520,000   23,520,000
         (320 spaces).........................
        NAS Lemoore Bachelor Enlisted Quarters   10,010,000   10,010,000
         (104 spaces).........................
        NC San Diego Bachelor Enlisted           47,240,000   47,240,000
         Quarters (516 spaces)................
        Twentynine Palms Bachelor Enlisted       29,675,000   29,675,000
         Quarters (384 spaces)................
    Washington, DC: Anacostia Bachelor            9,810,000    9,810,000
     Enlisted Quarters (120 spaces)...........
    Florida: Mayport Bachelor Enlisted           16,420,000   16,420,000
     Quarters (260 spaces)....................
    Hawaii:
        Kaneohe Bay Bachelor Enlisted Quarters   24,920,000   24,920,000
         (300 spaces).........................
        NS Pearl Harbor Bachelor Enlisted        17,300,000   17,300,000
         Quarters (112 spaces)................
        NS Pearl Harbor Bachelor Enlisted        23,300,000   23,300,000
         Quarters (312 spaces)................
    Illinois:
        Great Lakes Recruit Barracks (1,056      41,130,000   41,130,000
         spaces)..............................
        Great Lakes Recruit Barracks (1,056      41,130,000   41,130,000
         spaces)..............................
    Maine:
        Kittery-Portsmouth Bachelor Enlisted    ...........   14,620,000
         Quarters (172 spaces)................
        Brunswick Transient Student Quarters     22,630,000   22,630,000
         (500 spaces).........................
    Mississippi: Gulfport Bachelor Enlisted      14,300,000   14,300,000
     Quarters (180 spaces)....................
    Missouri: Kansas City Bachelor Enlisted       9,010,000    9,010,000
     Quarters (196 spaces)....................
    North Carolina:
        Camp Lejeune Bachelor Enlisted           16,530,000   16,530,000
         Quarters (400 spaces)................
        Camp Lejeune Bachelor Enlisted           13,550,000   13,550,000
         Quarters (320 spaces)................
    Virginia:
        NS Norfolk BEQ Modernization (380        14,730,000   14,730,000
         spaces)..............................
        Quantico Bachelor Enlisted Quarters       9,390,000    9,390,000
         (200 spaces).........................
    Greece: Larissa Bachelor Enlisted Quarters   12,240,000   12,240,000
     (152 spaces).............................
    Guam: Guam BEQ Modernization (64 spaces)..    9,300,000    9,300,000
                                               -------------------------
      Subtotal, Navy & Marine Corps...........  448,935,000  463,555,000
                                               =========================
Air Force:
    Alabama:
        Maxwell AFB Officer Training School      11,800,000   11,800,000
         Dormitory (120 spaces)...............
        Maxwell AFB Squadron Officer School      13,600,000   13,600,000
         Dormitory (162 spaces)...............
    Alaska: Elmendorf AFB Domitory (180          20,000,000   20,000,000
     spaces)..................................
    Arizona: Davis-Monthan AFB Domitory (120      8,700,000    8,700,000
     spaces)..................................
    Colorado: Buckley AFB Domitory (144          11,200,000   11,200,000
     spaces)..................................
    Oklahoma: Tinker AFB Domitory (144 spaces)   10,200,000   10,200,000
    Texas:
        Lackland AFB Domitory (96 spaces).....    8,600,000    8,600,000
        Sheppard AFB Student Domitory (140       16,000,000   16,000,000
         spaces)..............................
        Sheppard AFB Student Domitory (160       21,000,000   21,000,000
         spaces)..............................
    Virginia: Langley AFB Domitory (96 spaces)    8,300,000    8,300,000
    Germany: Ramstein AFB Domitory (120          11,000,000   11,000,000
     spaces)..................................
    Italy: Aviano AFB Domitory (102 spaces)...    8,200,000    8,200,000
    Korea:
        Osan AFB Domitory (156 spaces)........   14,400,000   14,400,000
        Osan AFB Domitory (156 spaces)........   15,800,000   15,800,000
        Osan AFB Officer Domitory (69 spaces).    9,700,000    9,700,000
    Turkey: Eskisehir Domitory (32 spaces)....    4,000,000    4,000,000
                                               -------------------------
      Subtotal, Air Force.....................  192,500,000  192,500,000
------------------------------------------------------------------------

            Real Property Maintenance Reporting Requirement

    The Committee recommends a continuation of the following 
general rules for repairing a facility under Operations and 
Maintenance account funding:
    Components of the facility may be repaired by replacement, 
and such replacement can be up to current standards or code.
    Interior arrangements and restorations may be included as 
repair, but additions, new facilities, and functional 
conversions must be performed as military construction 
projects.
    Such projects may be done concurrent with repair projects, 
as long as the final conjunctively funded project is a complete 
and usable facility.
    The appropriate Service Secretary shall submit a 21-day 
notification prior to carrying out any repair project with an 
estimated cost in excess of $7,500,000.
    The Department is directed to continue to provide the real 
property maintenance backlog at all installations for which 
there is a requested construction project in future budget 
requests. This information is to be provided on Form 1390. In 
addition, for all troop housing requests, the Form 1391 is to 
continue to show all real property maintenance conducted in the 
past 2 years and all future requirements for unaccompanied 
housing at that installation.

                       Child Development Centers

    The fiscal year 2002 budget request includes $25,460,000 
for 4 child development center projects. The Committee 
recommends $33,610,000 for a total of 6 projects.
    The following child development center projects are 
provided for fiscal year 2002:

------------------------------------------------------------------------
                   Location                       Request    Recommended
------------------------------------------------------------------------
Army:
    Illinois: Rock Island Arsenal.............  ...........   $3,500,000
    Kansas: Fort Riley........................   $6,800,000    6,800,000
    Maryland: Fort Meade......................    5,800,000    5,800,000
    Germany: Wiesbaden Air Base...............    6,800,000    6,800,000
Navy:
    South Carolina: Beaufort Naval Base.......    6,060,000    6,060,000
Air Force:
    Montana: Malmstrom AFB....................  ...........    4,650,000
                                               -------------------------
      Total...................................   25,460,000   33,610,000
------------------------------------------------------------------------


                      Military Construction, Army

Appropriations, 2001....................................    $943,328,000
Budget estimate, 2002...................................   1,760,541,000
Committee recommendation (including rescission).........   1,642,557,000

    The Committee recommends $1,642,557,000 for the Army for 
fiscal year 2002. This is a decrease of $117,984,000 from the 
budget request for fiscal year 2002. This also reflects the 
realignment of the Chemical Demilitarization Program 
responsibility from the Army. (See State tables at the end of 
the report for complete program recommendations.)
    The Committee fully expects contracts for the following 
projects to be awarded, as early in fiscal year 2002 as 
practical:
    Installation Desalinization System, Fort Bliss, TX.--Of the 
$153,084,000 provided for planning and design within the 
``Army'' account, the Committee directs that not less than 
$1,800,000 be made available for the design of this water 
treatment system.
    Replace Instructional Facility, Bell Hall, Fort 
Leavenworth, KS.--Of the $153,084,000 provided for planning and 
design within the ``Army'' account, the Committee directs that 
$2,500,000 be made available for the design of this 
instructional facility.
    Division Command and Control Facility, Fort Campbell, KY.--
Of the $153,084,000 provided for planning and design within the 
``Army'' account, the Committee directs that $1,500,000 be made 
available for the design of this command and control facility.
    U.S. Army Heritage and Education Center, Carlisle Barracks, 
PA.--Of the $153,084,000 provided for planning and design 
within the ``Army'' account, the Committee directs that 
$500,000 be made available for the planning and design of the 
center for restoration and archival of Army documents and 
audio/visual media.
    U.S. Army Museum Support Center, Martinsburg, WV.--Of the 
$153,084,000 provided for planning and design within the 
``Army'' account, the Committee directs that $100,000 be made 
available to conduct a study on the feasibility and cost to 
renovate the Martinsburg Roundhouse Center, to accommodate the 
U.S. Army indoor storage facility for macro military artifacts 
project.
    Physical Fitness Center Addition, Fort Wainwright, AK.--Of 
the $21,130,000 provided for unspecified minor construction 
within the ``Army'' account, the Committee directs that not 
less than $600,000 be made available for the construction of 
this physical fitness center addition.
    Aircraft Armament Engineering Center, Yuma, AZ.--Of the 
$21,130,000 provided for unspecified minor construction within 
the ``Army'' account, the Committee directs that not less than 
$1,480,000 be made available for the construction of this 
engineering center.
    Launch Complex Quality Assurance Facility, White Sands 
Missile Range, NM.--Of the $21,130,000 provided for unspecified 
minor construction within the ``Army'' account, the Committee 
directs that not less than $1,050,000 be made available for the 
construction of this quality assurance facility.
    Anechoic Chamber, White Sands Missile Range, NM.--The 
Committee recognizes the immediate requirement of the Army 
Research Laboratory (Survivability, Lethality and Analysis 
Division, SLAD) at White Sands Missile Range to replace the 
anechoic chamber destroyed by fire in December 2000. The loss 
of this facility will significantly impede critical research 
and development in Army Information Operations. The Committee 
strongly recommends that the Army expedite replacement of the 
anechoic chamber at White Sands Missile Range.
    Consolidated Logistics Maintenance Complex, Fort Sill, 
OK.--Of the $153,084,000 provided for planning and design 
within the ``Army'' account, the Committee directs that 
$1,300,000 be made available for the design of this logistics 
maintenance complex.

                      Military Construction, Navy

Appropriations, 2001....................................    $929,411,000
Budget estimate, 2002...................................   1,071,408,000
Committee recommendation (including rescission).........   1,129,045,000

    The Committee recommends $1,129,045,000 for Navy and Marine 
Corps military construction for fiscal year 2002. This amount 
is an increase of $57,637,000 from the fiscal year 2002 budget 
request. (See State tables at the end of the report for 
complete program recommendations.)
    The Committee fully expects contracts for the following 
projects to be awarded, as early in fiscal year 2002 as 
practical:
    Chapel, Kaneohe Bay Marine Corps Base, HI.--Of the 
$37,332,000 provided for planning and design within the 
``Navy'' account, the Committee directs that not less than 
$510,000 be made available for the design of this chapel.
    Renovate Joint Interoperability Test Command, Indian Head, 
Naval Surface Warfare Center, MD.--Of the $37,332,000 provided 
for planning and design within the ``Navy'' account, the 
Committee directs that not less than $300,000 be made available 
for the design of this facility.
    Aircraft Prototype Facility, Patuxent River, MD.--Of the 
$37,332,000 provided for planning and design within the 
``Navy'' account, the Committee directs that not less than 
$1,450,000 be made available for the design of this prototype 
facility.
    National Security Research Center, Newport Naval War 
College, RI.--Of the $37,332,000 provided for planning and 
design within the ``Navy'' account, the Committee directs that 
not less than $1,790,000 be made available for the design of 
this research center.
    Electronic Integration and Support Facility, Charleston 
Naval Weapons Station, SC.--Of the $37,332,000 provided for 
planning and design within the ``Navy'' account, the Committee 
directs that not less than $650,000 be made available for the 
design of this support facility.
    Turner Field House, U.S. Naval Academy, MD.--Of the 
$37,332,000 provided for planning and design within the 
``Navy'' account, the Committee directs that $2,700,000 be made 
available for the design of this facility.
    Fitness Center, Albany, Marine Corps Logistics Base, GA.--
Of the $13,321,000 provided for unspecified minor construction 
within the ``Navy'' account, the Committee directs that not 
less than $900,000 be made available for the construction of 
this fitness center.
    Infrastructure System Upgrade, Corpus Christi Naval Air 
Station, TX.--Of the $13,321,000 provided for unspecified minor 
construction within the ``Navy'' account, the Committee directs 
that not less than $786,000 be made available for the 
construction of these electrical, air conditioning and water 
facilities upgrades.
    Repair Taxiway, Field Waldron, TX.--Of the $13,321,000 
provided for unspecified minor construction within the ``Navy'' 
account, the Committee directs that not less than $520,000 be 
made available for the construction repair of this taxiway.
    Repair Runway and Perimeter Fence, Cabaniss, TX.--Of the 
$13,321,000 provided for unspecified minor construction within 
the ``Navy'' account, the Committee directs that not less than 
$369,000 be made available for the construction repair of this 
runway and fence.
    Compartmented Intelligence Facility, Joint Readiness Base, 
Fort Worth, TX.--Of the $13,321,000 provided for unspecified 
minor construction within the ``Navy'' account, the Committee 
directs that not less than $200,000 be made available for the 
construction of this facility.

                    Military Construction, Air Force

Appropriations, 2001....................................    $885,333,000
Budget estimate, 2002...................................   1,068,250,000
Committee recommendation (including rescission).........   1,144,269,000

    The Committee recommends $1,144,269,000 for the Air Force 
in fiscal year 2002. This is an increase of $76,019,000 to the 
fiscal year 2002 budget request. (See State tables at the end 
of the report for complete program recommendations.)
    The Committee fully expects contracts for the following 
projects to be awarded, as early in fiscal year 2002 as 
practical:
    Convert Facilities to Avionics Shop, Elmendorf Air Force 
Base, AK.--Of the $83,420,000 provided for planning and design 
within the ``Air Force'' account, the Committee directs that 
not less than $540,000 be made available for the design of this 
conversion.
    Blair Lake Vehicle Maintenance Facility, Eielson Air Force 
Base, AK.--Of the $83,420,000 provided for planning and design 
within the ``Air Force'' account, the Committee directs that 
not less than $300,000 be made available for the design of this 
vehicle maintenance facility.
    Corrosion Paint/De-Paint Facility, Robins Air Force Base, 
GA.--Of the $83,420,000 provided for planning and design within 
the ``Air Force'' account, the Committee directs that not less 
than $1,250,000 be made available for the design of this 
corrosion facility.
    Fire/Crash Rescue Station, Seymour Johnson Air Force Base, 
NC.--Of the $83,420,000 provided for planning and design within 
the ``Air Force'' account, the Committee directs that not less 
than $490,000 be made available for the design of this fire/
crash rescue station.
    Ramp Extension, Minot AFB, ND.--Of the $83,420,000 provided 
for planning and design within the ``Air Force'' account, the 
Committee directs that $1,710,000 be made available for the 
planning and design of this ramp extension. The shortage of 
parking space on the main parking apron at Minot AFB degrades 
the readiness of the 5th Bomb Wing to meet mission requirements 
and is a significant force protection deficiency. The Committee 
urges the Air Force to complete all remaining design work as 
quickly as possible and to fully fund this project in the 
President's fiscal year 2003 budget.
    Biomedical Training Facility--Brooks AFB, TX.--Of the 
$12,250,000 provided for unspecified minor construction in the 
``Air Force'' account, the Committee directs that $1,000,000 be 
made available for the construction of this facility.
    Masirah Island Airfield, Oman.--The Committee 
recommendation includes $8,000,000 in the ``Air Force'' major 
construction account to complete planning and design and 
construction of the Masirah Island Airfield project in Oman. 
The Committee recommendation rescinds $4,000,000 from 
previously appropriated Air Force funds, and $4,000,000 from 
previously appropriated Defense-Wide funds and reappropriates 
those funds in this Act to complete the Masirah Island project, 
which was originally authorized and funded in Public Law 107-
20.

                  Military Construction, Defense-wide

Appropriations, 2001....................................    $798,463,000
Budget estimate, 2002...................................     694,558,000
Committee recommendation (including rescissions)........     811,778,000

    The Committee recommends $811,778,000 for projects 
considered within the ``Defense-wide'' account. The amount 
recommended is an increase of $117,220,000 from the fiscal year 
2002 budget request. This increase reflects the realignment of 
the Chemical Demilitarization Program responsibility to this 
appropriation. (See State tables at the end of the report for 
complete program recommendations.)

                        Pentagon Reconstruction

    The Committee fully supports the Department of Defense 
efforts to rebuild the Pentagon from the recent terrorist 
attacks on September 11, 2001. The Committee is committed to 
working with the Department to ensure the necessary resources 
are available for reconstructing the Pentagon and improving the 
anti-terrorism and force protection measures of the facility. 
The Congress recently provided $40,000,000,000 of emergency 
spending authority to the administration, of which a portion 
will be directed towards the Pentagon reconstruction. The 
Committee believes that the funding to rebuild the destroyed 
wedge of the Pentagon should be funded through traditional 
military construction appropriations, specifically ``Military 
Construction, Defense-wide''. The Committee directs the 
Department to report to the congressional defense committees on 
the overall status of the reconstruction plan, acquisition 
strategy, project time line, and cost estimates no later than 
November 1, 2001.

                       chemical demilitarization

    The budget request identified a requirement of $172,500,000 
for the construction of the following chemical weapon 
demilitarization facilities in fiscal year 2002. The Committee 
recommends a total of $172,500,000 for this program as 
requested by the President.

------------------------------------------------------------------------
          State/installation/project              Request    Recommended
------------------------------------------------------------------------
Arkansas: Pine Bluff Arsenal, Ammunition        $26,000,000  $26,000,000
 Demilitarization Facility, Ph 6..............
Colorado: Pueblo Depot, Ammunition               11,000,000   11,000,000
 Demilitarization Facility, Ph 3..............
Indiana: Newport Army Ammunition Plant,          66,000,000   66,000,000
 Ammunition Demilitarization Facility, Ph 4...
Kentucky: Bluegrass Army Depot, Ammunition        3,000,000    3,000,000
 Demilitarization Facility, Ph 2..............
Maryland: Aberdeen Proving Ground, Ammunition    66,500,000   66,500,000
 Demilitarization Facility, Ph  4.............
                                               -------------------------
      Total...................................  172,500,000  172,500,000
------------------------------------------------------------------------

    The budget request proposes that these amounts should be 
appropriated under the ``Military Construction, Army'' account. 
As in prior years, the Committee recommends that these amounts 
be appropriated under the ``Military Construction, Defense-
wide'' account, in order to facilitate the tracking of expenses 
for the Chemical Demilitarization Program, and to avoid 
distorting the size of the Army's military construction 
program.
    The Committee believes that the focus on this program must 
remain at the Office of the Secretary of the Defense rather 
than at the service level and directs the Department to submit 
the fiscal year 2003 budget accordingly.
    The following chart displays the scope of the military 
construction investment in the overall chemical 
demilitarization program:

                          CHEMICAL DEMILITARIZATION PROGRAM MILITARY CONSTRUCTION COSTS
                                            [In millions of dollars]
----------------------------------------------------------------------------------------------------------------
                                           2000                       Fiscal year--
                                           and   ------------------------------------------------------   Total
                                          prior     2001     2002     2003     2004     2005     2006
----------------------------------------------------------------------------------------------------------------
Tooele.................................    198.0  .......  .......  .......  .......  .......  .......     198.0
Anniston...............................    181.2  .......  .......  .......  .......  .......  .......     181.2
Umatilla Depot.........................     11.2  .......  .......  .......  .......  .......  .......      11.2
Umatilla Facility......................    182.2      9.4  .......  .......  .......  .......  .......     191.6
Pine Fixed Facility....................  .......  .......  .......      2.0      7.7      0.8  .......      10.5
Pine Bluff Depot.......................     10.0  .......  .......  .......  .......  .......  .......      10.0
Pine Bluff Facility....................    107.8     43.6     25.0  .......  .......  .......  .......     176.4
Pueblo Depot...........................      6.3  .......  .......  .......  .......  .......  .......       6.3
Pueblo Facility........................  .......     10.7     13.0     35.3     71.0     28.8  .......     158.8
Blue Grass Depot.......................      2.0      8.5  .......  .......  .......  .......  .......      10.5
Blue Grass Facility....................  .......  .......      3.0     10.0  .......     36.0     62.0     111.0
Aberdeen CTDF..........................     16.1  .......  .......  .......  .......  .......  .......      16.1
Aberdeen Depot.........................      1.9  .......  .......  .......  .......  .......  .......       1.9
Aberdeen Facility......................     80.0     45.7     66.5     30.4  .......  .......  .......     221.7
Newport Depot..........................      2.0  .......  .......  .......  .......  .......  .......       2.0
Newport Facility.......................     47.4     34.4     65.0     13.2  .......  .......  .......     160.0
MAPS Facility..........................  .......      3.1  .......  .......  .......  .......  .......       3.1
Planning and Design....................    114.5  .......      1.0  .......  .......  .......  .......     115.5
                                        ------------------------------------------------------------------------
      Total............................    960.6    155.4    172.5     90.9     78.7     65.6     62.0   1,585.8
----------------------------------------------------------------------------------------------------------------

                      Medical construction program

    The fiscal year 2002 budget request included $225,126,000 
for 22 projects plus planning and design and unspecified minor 
construction to provide hospital and medical facilities, 
including treatment, training, and medical research and 
development facilities. The Committee recommends a total of 
$229,126,000 for Department of Defense medical projects.
    The following hospital and medical projects are recommended 
for fiscal year 2002:

------------------------------------------------------------------------
         Location/project title               Request       Recommended
------------------------------------------------------------------------
Alaska: Ft. Wainwright, Hospital             $18,500,000     $18,500,000
 Replacement............................
California:
    Camp Pendleton, Fleet Hospital             3,150,000       3,150,000
     Support Facilities.................
    Camp Pendleton, Medical/Dental             4,300,000       4,300,000
     Clinic Replacement, Horno,.........
    Camp Pendleton, Medical/Dental             3,800,000       3,800,000
     Clinic Replacement, Las Flores.....
    Camp Pendleton, Medical/Dental             4,050,000       4,050,000
     Clinic Replacement, Las Pulgas.....
    Twentynine Palms, LDRP Conversion...       1,600,000       1,600,000
Colorado: Shriever Air Force Base,             4,000,000       4,000,000
 Medical/Dental Clinic..................
Florida:
    Hurlburt Field, Clinic Addition/           8,800,000       8,800,000
     Alteration.........................
    Mayport Naval Station, Medical/           24,000,000      24,000,000
     Dental Clinic Replacement..........
Georgia:
    Albany Marine Corps Logistics Base,        5,800,000       5,800,000
     Medical/Dental Clinic Replacement..
    Fort Stewart, Consolidated Troop          11,000,000      11,000,000
     Medical Clinic.....................
Maryland:
    Andrews Air Force Base, Medical            7,300,000       7,300,000
     Clinic Addition/Alteration.........
    Andrews Air Force Base, Branch             2,950,000       2,950,000
     Medical/Dental Clinic Replace-
     ment...............................
New Mexico: Holloman Air Force Base,           5,700,000       5,700,000
 Medical Clinic Alteration..............
Texas:
    Dyess Air Force Base, Medical              3,300,000       3,300,000
     Treatment Facility Alteration......
    Fort Hood, Hospital Addition/             12,200,000      12,200,000
     Alteration.........................
Virginia: Norfolk, Branch Medical Clinic      21,000,000      21,000,000
 Addition/Alteration....................
Washington: Whidbey Island Naval Air           6,600,000       6,600,000
 Station, Water Survival Facility.......
Wyoming: F.E. Warren Air Force Base,           2,700,000       2,700,000
 Medical Clinic Alteration..............
Portugal: Lajes Field, Dental Clinic           3,750,000       3,750,000
 Replacement............................
Germany: Thule Air Force Base, Composite      28,000,000      28,000,000
 Medical Facility Replacement...........
Greenland: Heidelberg, Hospital Addition/     10,800,000      10,800,000
 Clinic Alteration......................
                                         -------------------------------
      Total.............................     193,300,000     193,300,000
------------------------------------------------------------------------

    Ambulatory Clinic, Goose Creek, SC.--Of the $30,300,000 
provided for planning and design within the ``Defense-wide 
Tricare Management Activity'' account, the Committee directs 
that not less than $4,000,000 be made available for the design 
of this clinic.
    Armed Forces Institute of Pathology (AFIP).--The Committee 
is aware of the long standing need for expanded and improved 
facilities for the Armed Forces Institute of Pathology (AFIP) 
as reported to Congress in the AFIP Facility Improvement Plan 
in accordance with direction in the fiscal year 2000 National 
Defense Authorization Act. However, the Committee is concerned 
over the projected cost estimates to renovate and expand the 
existing facility at Walter Reed Army Medical Center. 
Therefore, the Committee directs the Department of Defense to 
undertake an assessment of alternate locations in lower cost 
regions within the Mid-Atlantic area. In conducting its 
assessment, the Department is instructed to take into account 
regional facilities that could provide research, medical, DNA 
analysis, forensic, and biometric support to the Institute.

                            defense agencies

    Measurement and Signature Intelligence (MASINT) Test, 
Evaluation, and Acquisition Support Center (MASINT/TEA), 
Huntsville, AL.--Of the $16,516,000 provided for planning and 
design within the ``Defense-wide Defense Intelligence Agency'' 
account, the Committee directs that not less than $4,000,000 be 
made available for the completion of concept development, cost 
estimation, and design of this support center.
    Measurement and Signature Intelligence (MASINT) Tasking, 
Processing, Exploitation, and Dissemination (MASINT/TPED) 
Center, Martinsburg, WV.--Of the $16,516,000 provided for 
planning and design within the ``Defense-wide Defense 
Intelligence Agency'' account, the Committee directs that not 
less than $6,000,000 be made available for the completion of 
concept development, cost estimation, and design of this 
tasking, processing, exploitation, and dissemination center.

                        contingency construction

    The Committee has provided $10,000,000 for the Secretary of 
Defense ``Contingency construction'' account in accordance with 
the budget request. This account provides funds which may be 
used by the Secretary of Defense for unforeseen facility 
requirements. The Committee believes that the funding provided 
to the account is adequate to meet the needs of the Department.

                              rescissions

    National Missile Defense.--Division A of Public Law 106-246 
provided funding for ``National Missile Defense, Initial 
Deployment Facilities, Phase 1.'' The administration has 
determined that currently planned National Missile Defense 
construction programs should be funded through the Defense 
Appropriations research, test, development, and evaluation 
account instead of through the Military Construction 
Appropriations bill. Consequently, the $55,030,000 balance 
remaining in the National Missile Defense Military Construction 
account is no longer required for the project for which it was 
appropriated. The Committee therefore rescinds $55,030,000 from 
the ``Military Construction, Defense-wide'' account.
    Aruba-Forward Operating Locations.--Division B of Public 
Law 106-246 provided funding for a Forward Operating Location 
at Aruba. This project is no longer required. Therefore, the 
Committee rescinds $10,250,000 from the ``Military 
Construction, Defense-wide'' account.

              energy conservation and improvement project

    The Committee recommends the full budget request of 
$35,600,000 for the Energy Conservation and Improvement Project 
(ECIP). Last winter's energy shortages, coupled with heightened 
national security concerns over the vulnerability of the 
existing power delivery system, transmission lines, and fuel 
supply sources, have underscored the need for the Department to 
increase its reliance on renewable energy resources, 
particularly solar, wind, and geothermal, at military 
installations and Department of Defense family housing 
complexes. It is the opinion of the Committee that renewable 
energy resources can help to improve energy reliability, 
independence, and security through diversification and 
distributed development, and in so doing, complement 
conventional energy resources.
    To accomplish this goal, the Committee directs the 
Department to designate an executive agent among the services 
with field-level renewable energy purchasing experience, to 
assess the regional potential of renewal energy generation, 
transmission, and distribution by industry on or near 
Department of Defense installations in the United States. 
Because of the Air Force's scope and level of experience, the 
Committee recommends that the Air Force be designated the 
executive agent.
    The assessment is expected to encompass installations in 
each of the services and should include an analysis of the 
overall cost, benefit, and risk of various renewable energy 
proposals. The Department is also directed to provide a plan 
for encouraging the participation of private industry in the 
development and provision of renewable energy, and address the 
Department's market, regulatory, legal, cost and other possible 
impediments to an increased reliance on renewable resources. A 
thorough assessment is expected to take a minimum of 12 to 15 
months to complete, at an estimated cost of $10,000,000. Given 
the critical importance of this assessment, the Committee 
directs that of the $35,600,000 in the Energy Conservation 
Improvement Project fund, $10,000,000 be allocated to this 
assessment. The Department is directed to provide the 
congressional defense committees with an interim report on the 
scope and method of the assessment no later than April 30, 
2002, and a final report no later than April 30, 2003.

                          Joint Use Facilities

    Joint Use Facilities--Joint Future Years' Defense Plan 
(FYDP).--The Committee recognizes the efficiencies gained by 
the construction of joint use--multi-service facilities. 
However, past initiatives to begin development of such projects 
have produced limited results. It is the belief of the 
Committee that the military services, including the reserve 
components, should be encouraged to develop joint use 
facilities without the penalty of having the cost of the entire 
facility added to the FYDP of only one component.
    Given that it is within the authority of the Secretary of 
Defense, through the Office of the Comptroller, to develop a 
separate future year defense plans account for the application 
of such joint use projects, the Committee directs the Secretary 
of Defense, through the Office of the Comptroller, to develop 
such an account, within the existing funding constraints, that 
would encourage the application for, and construction of, 
joint-use, multi-service projects throughout the services 
including the reserve components. The Committee further 
encourages the Department to submit a budget in fiscal year 
2003 with the inclusion of a Joint Future Years' Defense Plan 
(FYDP).
    The Committee directs the Secretary of Defense to report to 
the congressional defense committees on the Department's plan 
to develop a Joint Future Years' Defense Plan no later than 
February 15, 2002.

               Military Construction, Reserve Components

Appropriations, 2001....................................    $702,608,000
Budget estimate, 2002...................................     615,238,000
Committee recommendation................................     799,168,000

    The Committee recommends $799,168,000 for military 
construction projects for the Guard and Reserve components. 
This amount is $183,930,000 above the fiscal year 2002 budget 
request. This increase reflects the Committee's continued 
strong support for the Guard and Reserve.
    The Committee's recommended action on each Reserve 
component project is reflected in the State list at the end of 
this report.
    The Committee recommends approval of military construction, 
Reserve component as outlined in the following table:

                            RESERVE COMPONENT
------------------------------------------------------------------------
                Component                     Request       Recommended
------------------------------------------------------------------------
Army National Guard.....................    $267,389,000    $378,549,000
Air National Guard......................     149,072,000     222,767,000
Army Reserve............................     111,404,000     111,404,000
Naval Reserve (including rescission)....      33,641,000      32,716,000
Air Force Reserve.......................      53,732,000      53,732,000
                                         -------------------------------
      Total.............................     615,238,000     799,168,000
------------------------------------------------------------------------


    Weapons of Mass Destruction--Civil Support Teams.--The 
Committee notes the continued progress by the Department in 
establishing the Weapons of Mass Destruction--Civil Support 
Teams (WMD/CST), and in the administrative and organizational 
restructuring.
    However, the National Guard has continued requirements for 
additional, adequate facilities from which to train, and to 
coordinate with other Federal and State agencies, and to store 
decontamination and reconnaissance equipment. Any outstanding 
requirements in this area must be fully integrated into the 
overall resourcing strategy for responding to events addressing 
weapons of mass destruction and civil support. The Committee 
has provided the Army National Guard an additional $9,000,000, 
in unspecified minor construction funding to directly support 
the completion of facilities for the next seven WMD/CST 
locations. The Committee directs the Chief of the National 
Guard Bureau to report to the congressional defense committees 
on the distribution of these funds no later than 60 days 
following the designation of the remaining locations of the 27 
initial sites.
    The Committee has added funding for specific Reserve 
component planning and design initiatives. The Committee 
recommendation also provides additional funding over the budget 
request for minor construction activities for the Reserve 
components.
    The Committee fully expects contracts for the following 
projects to be awarded, as early in fiscal year 2002 as 
practical:
    Readiness Center, Warren, AR.--Of the $34,378,000 provided 
for planning and design within the ``Army National Guard'' 
account, the Committee directs that $30,000 be made available 
for the planning and design of this readiness center.
    Reconstruct Leadership Academy, Camp Rowland, CT.--Of the 
$34,378,000 provided for planning and design within the ``Army 
National Guard'' account, the Committee directs that not less 
than $520,000 be made available for the design to reconstruct 
this leadership academy.
    Maintenance Shop, Camp Blanding, FL.--Of the $34,378,000 
provided for planning and design within the ``Army National 
Guard'' account, the Committee directs that not less than 
$1,400,000 be made available for the design of this maintenance 
shop.
    Consolidated Maintenance Facility, Esler/Pineville, LA.--Of 
the $34,378,000 provided for planning and design with the 
``Army National Guard'' account, the Committee directs that not 
less than $1,700,000 be made available for the design of this 
maintenance facility.
    Readiness Center, Kosciusko, MS.--Of the $34,378,000 
provided for planning and design within the ``Army National 
Guard'' account, the Committee directs that $300,000 be made 
available for the design of this readiness center.
    Integrated Special Operations Training Facility, Camp 
Dawson, WV.--Of the $34,378,000 provided for planning and 
design within the ``Army National Guard'' account, the 
Committee directs that $2,000,000 be made available for the 
planning and design of this operations and training facility.
    Aviation Classification Repair (AVCRAD), Springfield, MO.--
Of the $34,378,000 provided for planning and design within the 
``Army National Guard'' account, the Committee directs that not 
less than $1,620,000 be made available for the design of this 
aviation repair facility.
    Unit Training Equipment Site (UTES), Fort Indiantown Gap, 
PA.--Of the $34,378,000 provided for planning and design within 
the ``Army National Guard'' account, the Committee directs that 
not less than $1,500,000 be made available for the design of 
this equipment site.
    Readiness Center, Watertown, SD.--Of the $34,378,000 
provided for planning and design within the ``Army National 
Guard'' account, the Committee directs that not less than 
$514,000 be made available for the design of this readiness 
center.
    Joint Army National Guard/Air National Guard Readiness 
Center, Martinsburg, WV.--Of the $34,378,000 provided for 
planning and design within the ``Army National Guard'' account, 
the Committee directs that not less than $1,000,000 be made 
available for the design of this readiness center.
    Security Forces Facility, Eielson Air Force Base, AK.--Of 
the $7,342,000 provided for planning and design within the 
``Air National Guard'' account, the Committee directs that not 
less than $1,000,000 be made available for the design of this 
security forces facility.
    Airfield Facilities Upgrade, Des Moines, IA.--Of the 
$7,342,000 provided for planning and design within the ``Air 
National Guard'' account, the Committee directs that not less 
than $370,000 be made available for the design of this airfield 
upgrade.
    Airfield Facilities Upgrade, Martinsburg Air National Guard 
Base, WV.--Of the $7,342,000 provided for planning and design 
within the ``Air National Guard'' account, the Committee 
directs that not less than $2,000,000 be made available for the 
design of this airfield upgrade.
    Scout Armories, AK.--Of the $22,381,000 provided for 
unspecified minor construction within the ``Army National 
Guard'' account, the Committee directs that not less than 
$1,487,000 be made available for the construction of these 
scout armories in Kipnuk, Newtok, and Kake, Alaska.
    Entry Way/Guard Facility, Fort Harrison, MT.--Of the 
$22,381,000 provided for unspecified minor construction within 
the ``Army National Guard'' account, the Committee directs that 
$727,000 be made available for the construction of this entry 
way/guard facility.
    Storage Building, Camp Grafton, ND.--Of the $22,381,000 
provided for unspecified minor construction within the ``Army 
National Guard'' account, the Committee directs that not less 
than $1,499,000 be made available for the construction of a 
storage building.
    Joint Use Training Facility, Rickenbacker Army National 
Guard Base, OH.--Of the $22,381,000 provided for unspecified 
minor construction within the ``Army National Guard'' account, 
the Committee directs that not less than $1,274,000 be made 
available for the construction of this training facility.
    C-26 Hangar, Rickenbacker Army National Guard Base, OH.--Of 
the $22,381,000 provided for unspecified minor construction 
within the ``Army National Guard'' account, the Committee 
directs that not less than $1,365,000 be made available for the 
construction of this hangar.
    Courseware Development Support Facility, Camp Murray, WA.--
Of the $22,381,000 provided for unspecified minor construction 
within the ``Army National Guard'' account, the Committee 
directs that not less than $1,375,000 be made available for the 
construction of this support facility.
    Airfield Facilities Upgrade, Camp Dawson, WV.--Of the 
$22,381,000 provided for unspecified minor construction within 
the ``Army National Guard'' account, the Committee directs that 
not less than $1,000,000 be made available for the construction 
of these airfield upgrades.
    Munitions Storage Facility, McConnell Air Force Base, KS.--
Of the $8,425,000 provided for unspecified minor construction 
within the ``Air National Guard'' account, the Committee 
directs that not less than $1,500,000 be made available for the 
construction of this munitions storage facility.
    Alter Command Post/Logistics Base, Selfridge Air National 
Guard Base, MI.--Of the $8,425,000 provided for unspecified 
minor construction within the ``Air National Guard'' account, 
the Committee directs that not less than $425,000 be made 
available for this command post addition.
    Engineering Storage Facility, Malmstrom Air Force Base, 
MT.--Of the $8,425,000 provided for unspecified minor 
construction within the ``Air National Guard'' account, the 
Committee directs that not less than $1,500,000 be made 
available for this storage facility.

     North Atlantic Treaty Organization Security Investment Program

Appropriations, 2001....................................    $171,622,000
Budget estimate, 2002...................................     162,600,000
Committee recommendation................................     162,600,000

    The Committee has provided $162,600,000 for the North 
Atlantic Treaty Organization [NATO] Security Investment Program 
for fiscal year 2002, fully funding the budget request.
    The Committee continues the requirement that no funds will 
be used for projects (including planning and design) related to 
the enlargement of NATO and the Partnership for Peace program, 
unless Congress is notified 21 days in advance of the 
obligation of funds. In addition, the Committee's intent is 
that section 122 of the General Provisions shall apply to this 
program.
    The Department of Defense is directed to identify 
separately the level of effort anticipated for NATO enlargement 
and for Partnership for Peace for that fiscal year in future 
budget justifications.

                        Family Housing Overview

    The Committee has provided $4,128,383,000 for family 
housing construction, operations and maintenance, and the 
Department's family housing improvement fund. This amount is 
$61,866,000 above the fiscal year 2002 budget request and 
$470,765,000 above the amount appropriated in fiscal year 2001.

                          Family Housing, Army

Appropriations, 2001....................................  $1,211,572,000
Budget estimate, 2002...................................   1,400,533,000
Committee recommendation................................   1,421,733,000

    The Committee recommends a total of $1,421,733,000 for 
family housing, Army, in fiscal year 2002. This is $21,200,000 
over the fiscal year 2002 budget request.

                              construction

    The Committee recommends $80,400,000 for new construction 
instead of $59,200,000 as requested, as shown below:

------------------------------------------------------------------------
            Location/project                 Requested      Recommended
------------------------------------------------------------------------
Alaska: Fort Wainwright (32 Units)           $12,000,000     $12,000,000
 Southern Lights........................
Arizona: Fort Huachuca (72 Units)             10,800,000      10,800,000
 Pershing Plaza West....................
Kansas: Fort Leavenworth (80 Units).....      10,000,000      20,000,000
Texas:
    Fort Bliss (76 Units)...............      13,600,000      13,600,000
    Fort Sam Houston (80 Units).........  ..............      11,200,000
Korea: Camp Humphreys (54 Units)........      12,800,000      12,800,000
                                         -------------------------------
      Total.............................      59,200,000      80,400,000
------------------------------------------------------------------------

                       Construction Improvements

    The following projects are to be accomplished within the 
amounts provided for construction improvements:

------------------------------------------------------------------------
            Location/project                 Requested      Recommended
------------------------------------------------------------------------
Alabama: Ft. Rucker (28 units)..........      $2,400,000      $2,400,000
Washington, DC: Walter Reed Army Medical         100,000         100,000
 Center (221 units).....................
Georgia: Ft. Stewart/Hunter AAF (2,927        37,800,000      37,800,000
 units) Privatization...................
Kentucky: Ft. Campbell (4,540 units)          52,800,000      52,800,000
 Privatization..........................
Maryland:
    Aberdeen Proving Ground (10 units)..       1,050,000       1,050,000
    Ft. Detrick (155 units)                    1,200,000       1,200,000
     Privatization......................
New Jersey: Picatinny Arsenal (116               500,000         500,000
 units) Privatization...................
New York:
    Ft. Hamilton (436 units)                   2,200,000       2,200,000
     Privatization......................
    West Point (51 units) New Brick.....       9,400,000       9,400,000
North Carolina: Ft. Bragg (4,744 units)       50,000,000      50,000,000
 Privatization..........................
Germany:
    Ansbach (128 units) Bleidorn........      14,400,000      14,400,000
    Baumholder (188 units)..............       5,300,000       5,300,000
    Darmstadt (180 units)...............       6,600,000       6,600,000
    Stuttgart (30 units) Boeblingen.....       3,600,000       3,600,000
    Stuttgart (45 units) Steuben &             5,200,000       5,200,000
     Weicht Village.....................
    Wiesbaden (432 units)...............      12,600,000      12,600,000
Italy: Vicenza (156 units)..............      11,600,000      11,600,000
Korea: Yongsan (17 units)...............       4,000,000       4,000,000
                                         -------------------------------
      Total.............................     220,750,000     220,750,000
------------------------------------------------------------------------

                 Family Housing, Navy and Marine Corps

Appropriations, 2001....................................  $1,317,160,000
Budget estimate, 2002...................................   1,222,495,000
Committee recommendation................................   1,230,695,000

    The Committee recommends $1,230,695,000 for family housing, 
Navy and Marine Corps, in fiscal year 2002. This amount is 
$8,200,000 over the fiscal year 2002 budget request.

                              construction

    The Committee recommends $123,047,000 for new construction 
instead of $114,847,000 as requested, as shown below:

------------------------------------------------------------------------
            Location/project                 Requested      Recommended
------------------------------------------------------------------------
Arizona: MCAS Yuma (51 Units)...........      $9,017,000      $9,017,000
California: Twentynine Palms (74 Units)       16,250,000      16,250,000
 Marine Palms Housing area..............
Hawaii:
    MCB Kaneohe Bay (172 Units) Housing       46,996,000      55,196,000
     areas 63 & 64......................
    CNB Pearl Harbor (70 Units) Hale          16,827,000      16,827,000
     Moku...............................
Mississippi: NAS Pascagoula (160 Units).      23,354,000      23,354,000
Italy: NAS Sigonella (10 Units).........       2,403,000       2,403,000
                                         -------------------------------
      Total.............................     114,847,000     123,047,000
------------------------------------------------------------------------

                       CONSTRUCTION IMPROVEMENTS

    The following projects are to be accomplished within the 
amounts provided for construction improvements:

------------------------------------------------------------------------
            Location/project                 Requested      Recommended
------------------------------------------------------------------------
California:
    COMNAVBASE San Diego (160 units)....     $16,055,000     $16,055,000
    Camp Pendleton (40 units) San Onofre       3,700,000       3,700,000
    Camp Pendleton (3,200 units MCB           14,737,000      14,737,000
     Pendleton, 111 units MWTC
     Brideport, 284 MCB Pendleton)
     Privatized.........................
Washington, DC:
    Marine Barracks 8th & I (Quarters 2)         945,000         945,000
    Marine Barracks 8th & I (Quarters 4)         949,000         949,000
    Marine Barracks 8th & I (Quarters 6)       1,788,000       1,788,000
Florida:
    NAS Pensacola (36 units) Cabannis          2,557,000       2,557,000
     Crescent...........................
    NAS Pensacola (14 units) Light House       1,267,000       1,267,000
     Terrace............................
    NAS Whiting Field (115 units)              9,873,000       9,873,000
     Whiting Pines......................
Maryland:
    USNA Anapolis (42 units) North             3,955,000       3,955,000
     Severn Village.....................
    NAS Patuxent River (28 units)              1,609,000       1,609,000
     Chaffee Court......................
Mississippi: NAS Meridian (118 units)...       8,696,000       8,696,000
North Carolina:
    Marine Corps Base Camp Lejeune (80         4,569,000       4,569,000
     units) Watkins Village.............
    Marine Corps Base Camp Lejeune (30         3,172,000       3,172,000
     units) Paradise Point..............
    Marine Corps Base Camp Lejeune (1             70,000          70,000
     unit) Quarters 2000................
Tennessee: NSA Mid South, Memphis (773        12,370,000      12,370,000
 units Privatized)......................
Virginia:
    COMNAVREG Norfolk (12 units) Pecan           582,000         582,000
     Crescent...........................
    COMNAVREG Norfolk (25 units) Fairway       1,600,000       1,600,000
     Crescent...........................
    ACSC Wallops Island (28 units)             2,917,000       2,917,000
     Blades Circle......................
Iceland:
    NAS Keflavik (95 units) SP housing        26,074,000      26,074,000
     area...............................
    NAS Keflavik (65 units) Lower             12,681,000      12,681,000
     Commissary housing area............
Japan:
    CFA Sasebo: Hario Village (44 units)         608,000         608,000
     Dragon Vale (8 Units)..............
    CNFJ Yokosuka (96 units)............       9,475,000       9,475,000
    CNFJ Yokosuka (96 units)............      10,398,000      10,398,000
    CNFJ Yokosuka (78 units)............       7,029,000       7,029,000
    MCAS Iwakuni (44 units) Midrise 656.       1,293,000       1,293,000
Marianas Island: CNFM Guam (44 units)          7,620,000       7,620,000
 New Apra Heights.......................
United Kingdom:
    NAVACTS London (70 units) Daws Hill.       7,530,000       7,530,000
    NAVACTS London (80 units) West             8,935,000       8,935,000
     Ruislip............................
                                         -------------------------------
      Total.............................     183,054,000     183,054,000
------------------------------------------------------------------------

                       Family Housing, Air Force

Appropriations, 2001....................................  $1,084,099,000
Budget estimate, 2002...................................   1,387,358,000
Committee recommendation................................   1,419,824,000

    The Committee recommends $1,419,824,000 for family housing, 
Air Force, in fiscal year 2002, which is $32,466,000 over the 
budget request.

                              construction

    The Committee recommends $150,800,000 for new construction, 
instead of $140,800,000 as requested, as shown below:

------------------------------------------------------------------------
            Location/project                 Requested      Recommended
------------------------------------------------------------------------
Arizona: Luke AFB (120 Units)...........     $15,712,000     $15,712,000
California: Travis AFB (118 Units)......      18,150,000      18,150,000
Colorado: Buckley AFB (55 Units)........      11,400,000      11,400,000
Delaware: Dover AFB (120 Units).........      18,145,000      18,145,000
Washington, DC: Bolling AFB (136 Units)       16,926,000      16,926,000
 Ph 7...................................
Hawaii: Hickam AFB (102 Units) Ph 1.....      25,037,000      25,037,000
Idaho: Mountain Home AFB (56 Units) Ph 4  ..............      10,000,000
Louisiana: Barksdale AFB (56 Units) Ph 1       7,300,000       7,300,000
South Dakota: Ellsworth AFB (78 Units)        13,700,000      13,700,000
 Ph 1...................................
Virginia: Langley AFB (4 Units).........       1,200,000       1,200,000
Portugal: Lajes AFB Azores (64 Units) Ph      13,230,000      13,230,000
 2......................................
                                         -------------------------------
      Total.............................     140,800,000     150,800,000
------------------------------------------------------------------------

                       construction improvements

    The following projects are to be accomplished within the 
amounts provided for construction improvements:

------------------------------------------------------------------------
            Location/project                 Requested      Recommended
------------------------------------------------------------------------
Alaska: Elmendorf AFB (624 units)            $12,300,000     $12,300,000
 Privatization..........................
Arizona: Luke AFB--Improve Electrical          1,084,000       1,084,000
 System.................................
California:
    Beale AFB (1,444 units)                   14,500,000      14,500,000
     Privatization......................
    Travis AFB (49 units)...............       3,276,000       3,276,000
Colorado: USAF Academy--Improve Gas              297,000         297,000
 Valve Facility.........................
Delaware: Dover AFB--Improve Family              400,000         400,000
 Housing Management Office..............
Washington, DC: Bolling AFB (2 units)...         690,000         690,000
Florida: Eglin Aux Field 9 (330 Units)    ..............  ..............
 Privatization..........................
Hawaii:
    Hickam AFB (1,356 units)                  15,420,000      15,420,000
     Privatization......................
    Hickam AFB--Improve Infrastructure..       2,167,000       2,167,000
Illinois: Scott AFB--Improve Housing             550,000         550,000
 Office.................................
Louisiana: Barksdale AFB--Improve Water        1,500,000       1,500,000
 Distribution System....................
Maryland:
    Andrews AFB (202 units).............      16,789,000      16,789,000
    Andrews AFB (115 units)                    7,779,000       7,779,000
     Privatization......................
    Andrews AFB--Improve Housing Office.         600,000         600,000
Massachusetts: Hanscom AFB--Improve            1,100,000       1,100,000
 Utilities Systems......................
Missouri:
    Whiteman AFB (176 units)............  ..............      17,966,000
    Whiteman AFB--Improve Sewer System..         500,000         500,000
Nevada: Nellis AFB (1,313 units)               1,466,000       1,466,000
 Privatization..........................
New Jersey: McGuire AFB (1,882 units)         27,127,000      27,127,000
 Privatization..........................
North Dakota: Grand Forks AFB (181            17,810,000      17,810,000
 units).................................
South Carolina:
    Charleston AFB (178 units)..........      13,495,000      13,495,000
    Charleston AFB (50 units) Hunley      ..............       4,500,000
     Park, Ph 2.........................
Texas: Lackland AFB (564 units)               20,733,000      20,733,000
 Privatization..........................
Virginia:
    Langley AFB (66 units) Improve            15,746,000      15,746,000
     Historic Family Housing............
    Langley AFB (1,268 units)                 16,700,000      16,700,000
     Privatization......................
Wyoming: F.E. Warren AFB--Improve                470,000         470,000
 Sanitary Sewer Mains...................
Germany:
    Ramstein AB (407 units).............      46,668,000      46,668,000
    Ramstein AB--Improve Common                1,012,000       1,012,000
     Neighborhood Areas.................
    Spangdahlem AFB (138 units).........      15,632,000      15,632,000
Guam: Andersen AFB (112 units) Ph 10....      17,534,000      17,534,000
Japan:
    Kadena AB (108 units) Ph 2..........      13,582,000      13,582,000
    Yokota AFB (281 units) Ph 1.........      16,240,000      16,240,000
United Kingdom:.........................
    RAF Croughton (158 units)...........      16,100,000      16,100,000
    RAF Lackenheath (156 units).........      15,208,000      15,208,000
    RAF Mildenhall (31 units)...........       5,808,000       5,808,000
    RAF Molesworth (119 units)..........      12,596,000      12,596,000
                                         -------------------------------
      Total.............................     352,879,000     375,345,000
------------------------------------------------------------------------

                      Family Housing, Defense-wide

Appropriations, 2001....................................     $44,787,000
Budget estimate, 2002...................................      44,012,000
Committee recommendation................................      44,012,000

    The Committee recommends $44,012,000 for family housing, 
Defense-wide, in fiscal year 2002. This amount is equal to the 
budget request. Specific details are included in the tables at 
the end of the report.

                    Family Housing Improvement Fund

Appropriations, 2001....................................................
Budget estimate, 2002...................................      $2,000,000
Committee recommendation................................       2,000,000

    The Committee recommends $2,000,000 for the Family Housing 
Improvement Fund. This amount is equal to the budget request.

                  Homeowners Assistance Fund, Defense

Appropriations, 2001....................................................
Budget estimate, 2002...................................     $10,119,000
Committee recommendation................................      10,119,000

    The Committee recommends $10,119,000 for the Homeowners 
Assistance Fund, which is equal to the amount of the budget 
request.
    The Homeowners Assistance Fund is a non-expiring revolving 
fund which finances a program for providing assistance to 
homeowners by reducing their losses incident to the disposal of 
their homes when military installations at or near where they 
are serving or employed are ordered to be closed or the scope 
of operations is reduced. The Fund was established in 
recognition of the fact that base closure and reduction actions 
can have serious economic effects on local communities. The 
Fund receives funding from several sources: appropriations, 
borrowing authority, reimbursable authority, prior fiscal year 
unobligated balances, revenue from sale of acquired properties, 
and recovery of prior year obligations.

                      Base Realignment and Closure


                                Overview

    The Congress has appropriated, to date, a net total of 
$21,393,333,000 for the Base Realignment and Closure program 
for fiscal years 1990 through 2001. In the bill for fiscal year 
2002, the Committee is recommending total funding of 
$682,200,000 under one account.
    The Committee, in appropriating such funds, has provided 
the Department with the flexibility to allocate funds by 
Service, by function and by base. The Committee, in recognizing 
the complexities of realigning and closing bases and providing 
for environmental restoration, has provided such flexibility to 
allow the Office of the Secretary of Defense to monitor the 
program execution of the Services and to redistribute 
unobligated balances as appropriate to avoid delays and to 
effect timely execution of realignment and closures along with 
environmental restoration.
    The following table displays the total amount appropriated 
for each round of base closure including amounts recommended 
for fiscal year 2002:

                                          BASE REALIGNMENT AND CLOSURE
                           [Total funding, fiscal year 1990 through fiscal year 2002]
----------------------------------------------------------------------------------------------------------------
                                       Fiscal year 1990                      Fiscal year 2002
                                        through fiscal    Fiscal year 2001      Committee            Total
                                          year 2000           enacted          recommended
----------------------------------------------------------------------------------------------------------------
Part I..............................     $2,684,577,000            ( \1\ )            ( \1\ )     $2,684,577,000
Part II.............................      4,915,636,000            ( \1\ )            ( \1\ )      4,915,636,000
Part III............................      7,269,267,000            ( \1\ )            ( \1\ )      7,269,267,000
Part IV.............................      5,492,738,000     $1,031,115,000       $682,200,000      7,206,053,000
                                     ---------------------------------------------------------------------------
      Total.........................     20,362,218,000      1,031,115,000        682,200,000     22,075,533,000
----------------------------------------------------------------------------------------------------------------
\1\ Not applicable.

    Since the start of the current process for Base Realignment 
and Closure, Military Construction Appropriations Acts have 
appropriated a net total of $21,393,333,000 for the entire 
program for fiscal years 1990 through 2001. The total amount 
appropriated combined with the budget requested for fiscal year 
2002 Base Realignment and Closure is a total of 
$22,075,533,000.

             Base Realignment and Closure Account, Part IV

Appropriations, 2001....................................  $1,031,115,000
Budget estimate, 2002...................................     532,200,000
Committee recommendation................................     682,200,000

    The Committee recommends $682,200,000 for the base 
realignment and closure account, part IV. This is an increase 
of $150,000,000 over the amount requested for fiscal year 2002, 
and $348,915,000 under the amount appropriated in fiscal year 
2001.
    The Committee is deeply concerned about the adequacy of 
funding for, and pace of, environmental cleanup at BRAC 
installations. Of particular concern are the substantial 
shortfalls in the Navy and Air Force fiscal 2002 budget 
submissions for ``must pay'' BRAC environmental cleanup costs. 
Both services identified to this Committee environmental 
requirements that must be funded in fiscal year 2002 that were 
not included in the revised budget submission. The Navy has 
reported a shortfall of $167,627,000 for urgent environmental 
remediation projects, including health and safety threats and 
legal commitments, at 16 installations. The Air Force shortfall 
is $55,000,000 for clean up projects at 7 installations.
    The administration's fiscal year 2002 budget request is 
$532,200,000. The request is $498,915,000 below the amount 
appropriated for fiscal year 2001, and $150,000,000 below the 
Committee recommendation of $682,200,000. The Committee 
believes that the budget request is wholly inadequate to meet 
the current environmental cleanup requirements at BRAC 
installations. To help make up the services' urgent shortfall 
in funding, the Committee recommends that the unobligated 
balance of $55,030,000 remaining in the fiscal year 2001 
Defense-wide account, ``National Missile Defense Initial 
Deployment Facilities Phase 1,'' be rescinded and that the 
funds be reallocated to the base realignment and closure 
account, part IV, specifically to offset the Navy and Air Force 
BRAC environmental shortfalls. The Committee recommends this 
offset as a result of the Department's decision to shift the 
proposed national missile defense construction program from 
military construction into research, test, development, and 
evaluation.
    The Committee also recommends that $19,588,000 be rescinded 
from previously appropriated Navy planning and design funds, 
and that $925,000 be rescinded from previously appropriated 
Naval Reserve planning and design funds and reallocated to the 
BRAC account so that the Navy will have an additional source of 
funds to meet its BRAC oblications.
    In all, to help the communities affected by the services' 
environmental remediation shortfalls, the Committee recommends 
an increase of $150,000,000 over the budget request for the 
base realignment and closure account, part IV, and strongly 
urges the Department to accelerate to the maximum extent 
possible the environmental cleanup of BRAC installations. 
Consistent with the requirements identified by the Navy and the 
Air Force, the Committee also expects the Department to 
properly fund this account to fully meet its requirements and 
honor its commitments in future budget requests. The Committee 
expects the Department to give priority consideration to the 
projects that the Navy and Air Force have identified as urgent 
unfunded requirements, and to execute these projects as 
expeditiously as possible in fiscal year 2002.
    The Committee also directs the Department to provide a 
report by March 1, 2002, detailing the ongoing BRAC 
environmental remediation projects of each of the services and 
relevant Defense Agencies. The report should include the 
following elements: (1) the total funds allocated to each 
project through fiscal year 2002, (2) the budget request for 
fiscal year 2003, (3) details of the mandatory spending 
requirements for fiscal year 2003 based on legal and regulatory 
commitments, (4) the projected cost to complete each project, 
and (5) the projected completion date.

                      Hunters Point Naval Shipyard

    Of particular concern to the Committee is the level of 
progress being made on BRAC environmental remediation at the 
former Hunters Point Naval Shipyard in California.
    The Committee directs the Secretary of Defense to provide 
the congressional defense committees, within 90 days of the 
enactment of this Act, with a master plan for the cleanup of 
Hunters Point Naval Shipyard. This plan should include a 
detailed cleanup schedule plus cost estimates for each parcel 
as well as for the entire project. Following submission of the 
initial report, the Secretary is directed to provide semi-
annual progress reports to the defense congressional 
committees.
    The Committee expects the Navy to fully fund the cleanup of 
the shipyard in a timely manner, and to execute as 
expeditiously as possible the total fiscal year 2002 program, 
at no less than the budgeted level of $50,608,000. This 
includes allocating sufficient resources to complete the 
cleanup of Parcel B, to continue the cleanup of Parcels C and 
D, and to initiate site characterization of Parcels E and F in 
fiscal year 2002. The Committee also expects the Navy to 
adequately fund the cleanup of Parcels C and D and the site 
characterization of Parcels E and F as expeditiously as 
possible in accordance with the master plan.

        Environmental Remediation, Mc Clellan Air Force Base, CA

    The closure of McClellan Air Force Base was completed on 
July 13, 2001. Productive re-use of the base is now underway, 
and nearly 2,000 of the 25,000 jobs lost to the Sacramento 
Region with the base closure have been recreated. An estimated 
$490,000,000 in BRAC environmental remediation funds will be 
required to complete the base clean up program. Of particular 
concern to the Committee is the urgent requirement to clean up 
the plutonium contamination at the installation. In addition to 
the $35,754,000 included in the President's fiscal year 2002 
budget for environmental clean up at McClellan AFB, the Air 
Force has identified to the Committee a shortfall of 
$22,600,000 for fiscal year 2002 clean up activities at 
McClellan. The Committee expects the Air Force to fully fund 
the environmental remediation program at McClellan in 2002 and 
beyond.

                           GENERAL PROVISIONS

    The following lists general provisions proposed by the 
Committee. The Committee recommends inclusion of several 
proposals which have been incorporated in previous 
appropriations acts, provisions requested by the Defense 
Department, and new provisions. The Committee recommendations 
are as follows:
    Sec. 101. Restricts payments under a cost-plus-a-fixed-fee 
contract for work, except in cases of contracts for 
environmental restoration at base closure sites.
    Sec. 102. Permits use of funds for hire of passenger motor 
vehicles.
    Sec. 103. Permits use of funds for defense access roads.
    Sec. 104. Prohibits construction of new bases inside the 
continental United States for which specific appropriations 
have not been made.
    Sec. 105. Limits the use of funds for purchase of land or 
land easements.
    Sec. 106. Prohibits the use of funds to acquire land, 
prepare a site, or install utilities for any family housing 
except housing for which funds have been made available.
    Sec. 107. Limits the use of minor construction funds to 
transfer or relocate activities among installations.
    Sec. 108. Prohibits the procurement of steel unless 
American producers, fabricators, and manufacturers have been 
allowed to compete.
    Sec. 109. Prohibits payments of real property taxes in 
foreign nations.
    Sec. 110. Prohibits construction of new bases overseas 
without prior notification.
    Sec. 111. Establishes a threshold for American preference 
of $500,000 relating to architect and engineering services.
    Sec. 112. Establishes preference for American contractors 
for military construction in the United States territories and 
possessions in the Pacific, and on Kwajalein Atoll, or in the 
Arabian Gulf.
    Sec. 113. Requires notification of military exercises 
involving construction in excess of $100,000.
    Sec. 114. Limits obligations during the last 2 months of 
the year.
    Sec. 115. Permits funds appropriated in prior years to be 
available for construction authorized during the current 
session of Congress.
    Sec. 116. Permits the use of expired or lapsed funds to pay 
the cost of supervision for any project being completed with 
lapsed funds.
    Sec. 117. Permits obligation of funds from more than 1 
fiscal year to execute a construction project, provided that 
the total obligation for such project is consistent with the 
total amount appropriated for the project.
    Sec. 118. Allows expired funds to be transferred to the 
``Foreign currency fluctuations, construction, defense'' 
account.
    Sec. 119. Directs the Department to report annually on 
actions taken to encourage other nations to assume a greater 
share of the common defense budget.
    Sec. 120. Allows transfer of proceeds from earlier base 
realignment and closure accounts to the continuing base 
realignment and closure accounts.
    Sec. 121. Permits the transfer of funds from Family Housing 
Construction accounts to the DOD Family Housing Improvement 
Fund.
    Sec. 122. Restricts the use of funds for the Partnership 
for Peace Program.
    Sec. 123. Requires the Secretary of Defense to notify the 
congressional defense committees of all family housing 
privatization solicitations and agreements which contain any 
clause providing consideration for base realignment and 
closure, force reductions and extended deployments.
    Sec. 124. Provides transfer authority to the Homeowners 
Assistance Program.
    Sec. 125. Requires that all Military Construction 
Appropriations Acts be the sole funding source of all operation 
and maintenance for family housing, including flag and general 
officer quarters, and limits the repair on flag and general 
officer quarters to $35,000 per year without prior notification 
to the defense committees.
    Sec. 126. Provides for completion of the Masirah Island 
Airfield project in Oman.
    Sec. 127. Directs the Secretary of Defense to submit to the 
congressional defense committees a Master Plan for the 
environmental remediation of Hunters Point Naval Shipyard, 
California.

  COMPLIANCE WITH PARAGRAPH 7, RULE XVI, OF THE STANDING RULES OF THE 
                                 SENATE

    Paragraph 7 of rule XVI requires that Committee reports on 
general appropriations bills identify each Committee amendment 
to the House bill ``which proposes an item of appropriation 
which is not made to carry out the provisions of an existing 
law, a treaty stipulation, or an act or resolution previously 
passed by the Senate during that session.''

 COMPLIANCE WITH PARAGRAPH 12, RULE XXVI OF THE STANDING RULES OF THE 
                                 SENATE

    Paragraph 12 of rule XXVI requires that Committee reports 
on a bill or joint resolution repealing or amending any statute 
or part of any statute include ``(a) the text of the statute or 
part thereof which is proposed to be repealed; and (b) a 
comparative print of that part of the bill or joint resolution 
making the amendment and of the statute or part thereof 
proposed to be amended, showing by stricken-through type and 
italics, parallel columns, or other appropriate typographical 
devices the omissions and insertions which would be made by the 
bill or joint resolution if enacted in the form recommended by 
the committee.''
    The Committee bill as recommended contains no such 
provisions.

            MILITARY CONSTRUCTION PROJECT LISTING BY LOCATION
                        [In thousands of dollars]
------------------------------------------------------------------------
                                                Committee    Change from
   Installation and project        Budget       recommen-      budget
                                   request       dation       estimate
------------------------------------------------------------------------

            ALABAMA

ARMY:
    ANNISTON ARMY DEPOT:
        COMPONENT MAINTENANCE         2,300         2,300   ............
         FACILITY.............
        REBUILD SHOP AND              2,850         2,850   ............
         FACILITY.............
    FORT RUCKER: COMMANCHE           11,400        11,400   ............
     SIMULATOR TRAINING
     FACILITY.................
    REDSTONE ARSENAL: DINING          7,200         7,200   ............
     FACILITY.................
AIR FORCE:
    MAXWELL AFB:
        SQUADRON OFFICER              9,000         9,000   ............
         SCHOOL ACADEMIC
         FACILITY.............
        OFFICER TRAINING             11,800        11,800   ............
         SCHOOL DORMITORY.....
        SQUADRON OFFICER             13,600        13,600   ............
         SCHOOL DORMITORY.....
ARMY NATIONAL GUARD:
    HUNTSVILLE: UNIT TRAINING         7,498         7,498   ............
     EQUIPMENT SITE...........
    MOBILE: ADD/ALTER                 5,333         5,333   ............
     READINESS CENTER.........
AIR NATIONAL GUARD: DOTHAN:     ............       11,000       +11,000
 COMBAT COMMUNICATIONS
 SQUADRON.....................
AIR FORCE RESERVE:
    MAXWELL AFB:
        FUEL CELL MAINTENANCE         7,300         7,300   ............
         HANGAR...............
        AIRCRAFT MAINTENANCE          9,900         9,900   ............
         HANGAR...............
                               -----------------------------------------
          TOTAL, ALABAMA......       88,181        99,181       +11,000

            ALASKA

ARMY:
    FORT RICHARDSON: BARRACKS        45,000        45,000   ............
     COMPLEX (PHASE I)........
    FORT WAINWRIGHT:
        ASSEMBLY BUILDING.....        4,200         4,200   ............
        POWER PLANT COOLING          23,000        23,000   ............
         TOWER................
    FORT RICHARDSON: MOUT       ............       18,000       +18,000
     TRAINING FACILITY........
AIR FORCE:
    EARECKSON AFB: UPGRADE            4,600         4,600   ............
     WASTEWATER SYSTEM........
    ELMENDORF AFB:
        ADD/ALTER AIRCRAFT           12,200        12,200   ............
         FUEL SYSTEM
         MAINTENANCE HANGAR...
        DORMITORY.............       20,000        20,000   ............
DEFENSE-WIDE:
    EIELSON AFB: REPLACE BULK         8,800         8,800   ............
     FUEL STORAGE TANKS.......
    FORT WAINWRIGHT: HOSPITAL        18,500        18,500   ............
     REPLACEMENT (PHASE III)..
ARMY NATIONAL GUARD: JUNEAU:    ............        7,568        +7,568
 READINESS CENTER.............
AIR NATIONAL GUARD: ELMENDORF         5,000         5,000   ............
 AFB: UPGRADE COMBAT
 COMMUNICATIONS FACILITIES....
                               -----------------------------------------
      TOTAL, ALASKA...........      141,300       166,868       +25,568

            ARIZONA

ARMY: FORT HUACHUCA: EFFLUENT         6,100         6,100   ............
 REUSE SYSTEM.................
NAVY:
    YUMA MARINE CORPS AIR
     STATION:
        AIR TRAFFIC CONTROL           6,750         6,750   ............
         TOWER................
        LAND ACQUISITION              8,660         8,660   ............
         (PHASE II)...........
        STATION ORDNANCE AREA.        7,160         7,160   ............
AIR FORCE:
    DAVIS-MONTHAN AFB:
        DORMITORY.............        8,700         8,700   ............
        REPLACE AIRCRAFT              8,600         8,600   ............
         RECLAMATION/PARTS
         PROCESS COMPLEX......
ARMY NATIONAL GUARD: MARANA:         14,358        14,358   ............
 AVIATION MAINTENANCE HANGAR..
ARMY RESERVE: MESA: RESERVE          10,900        10,900   ............
 CENTER/ORGANIZATIONAL
 MAINTENANCE SHOP.............
                               -----------------------------------------
      TOTAL, ARIZONA..........       71,228        71,228   ............

           ARKANSAS

ARMY: PINE BLUFF ARSENAL:            26,000   ............      -26,000
 AMMUNITION DEMILITARIZATION
 FACILITY (PHASE VI)..........
AIR FORCE:
    LITTLE ROCK AFB:
        C-130J FLIGHT                10,600        10,600   ............
         SIMULATOR FACILITY...
        FIRE STATION..........  ............        7,500        +7,500
DEFENSE-WIDE: PINE BLUFF        ............       26,000       +26,000
 ARSENAL: AMMUNITION
 DEMILITARIZATION FACILITY
 (PHASE VI)...................
                               -----------------------------------------
      TOTAL, ARKANSAS.........       36,600        44,100        +7,500

          CALIFORNIA

NAVY:
    CAMP PENDLETON MARINE
     CORPS BASE:
        AIRCRAFT HANGAR               4,470         4,470   ............
         IMPROVEMENTS.........
        BACHELOR ENLISTED            21,200        21,200   ............
         QUARTERS.............
        BACHELOR ENLISTED            21,600        21,600   ............
         QUARTERS.............
        BOAT MAINTENANCE             11,980        11,980   ............
         FACILITY.............
        HELO OUTLYING LANDING         3,910         3,910   ............
         FIELD (PHASE II).....
        INDOOR PHYSICAL              13,460        13,460   ............
         FITNESS FACILITY.....
        IRON/MANGANESE PLANT..       11,180        11,180   ............
        REGIMENTAL ARTILLERY         13,160        13,160   ............
         MAINTENANCE COMPLEX..
    CORONADO NAVAL AMPHIBIOUS         8,610         8,610   ............
     BASE: EXPEDITIONARY
     WARFARE TRAINING FACILITY
    EL CENTRO NAVAL AIR              23,520        23,520   ............
     FACILITY: TRANSIENT
     BACHELOR ENLISTED
     QUARTERS.................
    LEMOORE NAVAL AIR STATION:       10,010        10,010   ............
     BACHELOR ENLISTED
     QUARTERS.................
    PORT HUENEME NAVAL
     CONSTRUCTION BATTALION
     CENTER:
        VEHICLE MAINTENANCE           3,780         3,780   ............
         SCHOOL...............
        PORT IMPROVEMENTS.....       12,400        12,400   ............
    SAN DIEGO NAVAL STATION:
        BACHELOR ENLISTED            47,240        47,240   ............
         QUARTERS.............
        REPLACE PIERS 10/11          17,500        17,500   ............
         (PHASE II)...........
    SAN NICHOLAS ISLAND:             13,730        13,730   ............
     SUPPLY PIER..............
    TWENTYNINE PALMS:
        ACADEMIC INSTRUCTION          9,860         9,860   ............
         BUILDING.............
        AMMUNITION STORAGE            9,540         9,540   ............
         FACILITIES...........
        BACHELOR ENLISTED            29,675        29,675   ............
         QUARTERS.............
        ENLISTED DINING              11,930        11,930   ............
         FACILITY.............
        RESERVE SUPPORT               8,760         8,760   ............
         FACILITIES...........
        VEHICLE WASH STATION..        5,360         5,360   ............
AIR FORCE:
    EDWARDS AFB:
        ADD/ALTER TERMINAL            4,600         4,600   ............
         AREA CONTROL FACILITY
        CONSOLIDATED SUPPORT         11,700        11,700   ............
         FACILITY.............
    LOS ANGELES AFB:                 23,000        23,000   ............
     CONSOLIDATED BASE SUPPORT
     COMPLEX..................
    TRAVIS AFB:
        REPLACE SUPPORT               6,800         6,800   ............
         FACILITY.............
        C-5 SQUADRON            ............        9,600        +9,600
         OPERATIONS FACILITY..
    VANDENBERG AFB: MISSILE          11,800        11,800   ............
     TRANSPORT BRIDGE.........
DEFENSE-WIDE:
    CAMP PENDLETON MARINE
     CORPS BASE:
        FLEET HOSPITAL SUPPORT        3,150         3,150   ............
         FACILITIES...........
        REPLACE MEDICAL/DENTAL        4,300         4,300   ............
         CLINIC (HORNO).......
        REPLACE MEDICAL/DENTAL        3,800         3,800   ............
         CLINIC (LAS FLORES)..
        REPLACE MEDICAL/DENTAL        4,050         4,050   ............
         CLINIC (LAS PULGAS)..
    TRACY DEFENSE DISTRIBUTION       30,000        30,000   ............
     DEPOT: REPLACE GENERAL
     PURPOSE WAREHOUSE........
    CORONADO NAVAL AMPHIBIOUS        13,650        13,650   ............
     BASE: SEAL TEAM FIVE
     OPERATIONS FACILITY......
    TWENTYNINE PALMS: HOSPITAL        1,600         1,600   ............
     LDRP CONVERSION..........
ARMY NATIONAL GUARD:
    FORT IRWIN: MANEUVER AREA        21,953        21,953   ............
     TRAINING EQUIPMENT SITE
     (PHASE I)................
    LANCASTER: READINESS              4,530         4,530   ............
     CENTER...................
    AZUSA: READINESS CENTER...  ............       14,011       +14,011
NAVY RESERVE: PORT HUENEME            1,000         1,000   ............
 NAVAL RESERVE CENTER: VEHICLE
 MAINTENANCE FACILITY.........
                               -----------------------------------------
      TOTAL, CALIFORNIA.......      458,808       482,419       +23,611

           COLORADO

ARMY:
    FORT CARSON: BARRACKS            25,000        25,000   ............
     COMPLEX (NELSON BLVD)
     (PHASE I)................
    PUEBLO DEPOT: AMMUNITION         11,000   ............      -11,000
     DEMILITARIZATION FACILITY
     (PHASE  III).............
AIR FORCE:
    BUCKLEY AFB:
        DORMITORY.............       11,200        11,200   ............
        FITNESS CENTER........       12,000        12,000   ............
        CONTROL TOWER.........  ............        5,800        +5,800
    SCHRIEVER AFB: SBIRS             19,000        19,000   ............
     MISSION CONTROL STATION
     BACKUP...................
    U.S. AIR FORCE ACADEMY:
        ADD/ALTER ATHLETIC           11,400        11,400   ............
         FACILITIES (PHASE II)
        INSTALL AIR                   1,300         1,300   ............
         CONDITIONING
         (ENLISTED DORMITORY).
        REPLACE CONTROL TOWER.        6,400         6,400   ............
        UPGRADE POTABLE WATER         6,400         6,400   ............
         SYSTEM (CADET AREA)..
DEFENSE-WIDE:
    PUEBLO DEPOT: AMMUNITION    ............       11,000       +11,000
     DEMILITARIZATION FACILITY
     (PHASE  III).............
    SCHRIEVER AFB: MEDICAL/           4,000         4,000   ............
     DENTAL CLINIC............
ARMY RESERVE: FORT CARSON:            9,394         9,394   ............
 ARMED FORCES RESERVE CENTER/
 NEW RESERVE CENTER...........
                               -----------------------------------------
      TOTAL, COLORADO.........      117,094       122,894        +5,800

          CONNECTICUT

AIR NATIONAL GUARD: ORANGE           12,000        12,000   ............
 ANGS: REPLACE AIR CONTROL
 SQUADRON COMPLEX.............

     DISTRICT OF COLUMBIA

ARMY: FORT MCNAIR: PHYSICAL          11,600        11,600   ............
 FITNESS TRAINING CENTER......
NAVY: ANACOSTIA: BACHELOR             9,810         9,810   ............
 ENLISTED QUARTERS REPLACEMENT
AIR FORCE: BOLLING AFB: ADD/          2,900         2,900   ............
 ALTER CHAPEL CENTER..........
                               -----------------------------------------
      TOTAL, DISTRICT OF             24,310        24,310   ............
       COLUMBIA...............

           DELAWARE

AIR FORCE: DOVER AFB: FIRE      ............        7,300        +7,300
 STAION.......................

            FLORIDA

NAVY:
    KEY WEST NAVAL AIR               11,400        11,400   ............
     STATION: AIR TRAFFIC
     CONTROL TOWER/OPERATIONS
     BUILDING.................
    MAYPORT NAVAL STATION:           16,420        16,420   ............
     BACHELOR ENLISTED
     QUARTERS.................
    PENSACOLA NAVAL AIR         ............        3,700        +3,700
     STATION: CONSOLIDATED
     FIRE STATION.............
    WHITING FIELD NAVAL AIR           2,140         2,140   ............
     STATION: AIRFIELD
     APPROACH LIGHTING........
AIR FORCE:
    CAPE CANAVERAL AIR                7,800         7,800   ............
     STATION: REPLACE
     FIRECRASH RESCUE STATION.
    EGLIN AFB: COMMAND AND           11,400        11,400   ............
     CONTROL TEST OPERATIONS
     CENTER...................
    HURLBURT FIELD:
        CONSOLIDATED                  4,000         4,000   ............
         COMMUNICATION
         FACILITY.............
        DINING FACILITY/              6,400         6,400   ............
         FITNESS CENTER.......
    MACDILL AFB: MISSION             10,000   ............      -10,000
     PLANNING CENTER (PHASE I)
    TYNDALL AFB:
        F-22 FUELS SYSTEM             3,050         3,050   ............
         MAINTANENCE HANGAR...
        F-22 SQUAD OPERATIONS/       12,000        12,000   ............
         AIRCRAFT MAINT UNIT
         HANGAR...............
DEFENSE-WIDE:
    HURLBURT FIELD:
        ADD/ALTER MEDICAL/            8,800         8,800   ............
         DENTAL CLINIC........
        CV-22 TRAINING DEVICE        10,200        10,200   ............
         SUPPORT FACILITY.....
        READINESS SUPPLY              3,200         3,200   ............
         PACKAGE FACILITY.....
    MACDILL AFB:
        PUBLIC ACCESS BUILDING        2,500         2,500   ............
        RENOVATE COMMAND AND          9,500         9,500   ............
         CONTROL FACILITY.....
    MAYPORT NAVAL STATION:           24,000        24,000   ............
     REPLACE MEDICAL/DENTAL
     CLINIC...................
AIR NATIONAL GUARD: CAMP              6,900         6,900   ............
 BLANDING: REPLACE WEATHER
 TRAINING COMPLEX.............
NAVY RESERVE:
    JACKSONVILLE NAVAL AIR
     STATION:
        HANGAR RENOVATIONS....        3,744         3,744   ............
        MARINE CORPS RESERVE    ............  ............  ............
         TRAINING CENTER......
        READINESS SUPPORT SITE        2,500         2,500   ............
         FACILITIES...........
                               -----------------------------------------
          TOTAL, FLORIDA......      155,954       149,654        -6,300

            GEORGIA

ARMY:
    FORT BENNING:
        PASSENGER PROCESSING         17,000        17,000   ............
         FACILITY.............
        RUNWAY EXTENSION......        6,900         6,900   ............
    FORT GILLEM:
        CRIMINAL INVESTIGATION       29,000        29,000   ............
         FORENSIC LABORATORY..
        EXPLOSIVE ORDANCE             5,600         5,600   ............
         DETACHMENT OPERATIONS
         BUILDING.............
    FORT GORDON:
        INFORMATION SYSTEMS          11,000        11,000   ............
         FACILITY.............
        VEHICLE MAINTENANCE          23,000        23,000   ............
         FACILITY.............
    FORT STEWART:
        EDUCATION CENTER......       16,000        16,000   ............
        SOLDIER SERVICE CENTER       10,200        10,200   ............
        VEHICLE MAINTENANCE          13,600        13,600   ............
         FACILITY.............
AIR FORCE:
    MOODY AFB: FITNESS CENTER.  ............        8,600        +8,600
    ROBINS AFB:
        FIRE TRAINING FACILITY        3,800         3,800   ............
        LARGE ITEM AIRCRAFT           3,050         3,050   ............
         SUPPORT EQUIPMENT
         PAINT FAC............
        REPLACE KC-135                7,800         7,800   ............
         SQUADRON OPERATIONS..
DEFENSE-WIDE:
    ALBANY MARINE CORPS               5,800         5,800   ............
     LOGISTICS BASE: REPLACE
     MEDICAL/DENTAL CLINIC....
    FORT BENNING: TACTICAL            5,100         5,100   ............
     EQUIPMENT COMPLEX........
    FORT STEWART: CONSOLIDATED       11,000        11,000   ............
     TROOP MEDICAL CLINIC.....
AIR NATIONAL GUARD: ROBINS            6,100         6,100   ............
 AFB: REPLACE OPERATIONS AND
 TRAINING COMPLEX.............
AIR FORCE RESERVE: ROBINS AFB:        2,000         2,000   ............
 AIR FORCE RESERVE
 HEADQUARTERS (PHASE II)......
                               -----------------------------------------
      TOTAL, GEORGIA..........      176,950       185,550        +8,600

            HAWAII

ARMY:
    PEARL HARBOR: SHIPPING           11,800        11,800   ............
     OPERATIONS BUILDING......
    POHAKULOA TRAINING AREA:
        COMMAND AND RANGE             5,100         5,100   ............
         CONTROL BUILDING.....
        LAND ACQUISITION        ............        1,500        +1,500
         PARKER RANCH.........
    KAHUKU WINDMILL SITE: LAND  ............          900          +900
     ACQUISITION..............
    SCHOFIELD BARRACKS:              23,000        23,000   ............
     BARRACKS COMPLEX (WILSON
     STREET) (PHASE I-C)......
    WHEELER ARMY AIRFIELD:           50,000        50,000   ............
     BARRACKS COMPLEX
     (AVIATION) (PHASE VI-A)..
NAVY:
    CAMP SMITH: CINCPAC              37,580        37,580   ............
     HEADQUARTERS (PHASE III).
    KANEOHE BAY MARINE CORPS         24,920        24,920   ............
     BASE: BACHELOR ENLISTED
     QUAR-  TERS..............
    LUALUALEI NAVAL MAGAZINE:         6,000         6,000   ............
     SHORE POWER AT WHARVES...
    PEARL HARBOR NAVAL
     COMPLEX:
        BACHELOR ENLISTED            17,300        17,300   ............
         QUARTERS.............
        BACHELOR ENLISTED            23,300        23,300   ............
         QUARTERS.............
        DRYDOCK SUPPORT               7,900         7,900   ............
         FACILITY.............
        ELECTRICAL                   12,100        12,100   ............
         DISTRIBUTION SYSTEM
         IMPROVEMENTS.........
        SEWER FORCE MAIN......       16,900        16,900   ............
        FORD ISLAND WATER LINE  ............       14,100       +14,100
         REPLACEMENT..........
DEFENSE-WIDE: HICKAM AFB:            29,200        29,200   ............
 REPLACE HYDRANT FUEL SYSTEM..
                               -----------------------------------------
      TOTAL, HAWAII...........      265,100       281,600       +16,500

             IDAHO

AIR FORCE: MOUNTAIN HOME AFB:        14,600        14,600   ............
 REPLACE AIRCRAFT PARKING
 APRON........................
ARMY NATIONAL GUARD: GOWEN            8,117         8,117   ............
 FIELD: READINESS CENTER......
                               -----------------------------------------
      TOTAL, IDAHO............       22,717        22,717   ............

           ILLINOIS

ARMY: ROCK ISLAND ARSENAL:      ............        3,500        +3,500
 CHILD DEVELOPMENT CENTER.....
NAVY:
    GREAT LAKES NAVAL TRAINING
     CENTER:
        RECRUIT BARRACKS......       41,130        41,130   ............
        RECRUIT BARRACKS......       41,130        41,130   ............
NAVY RESERVE: GREAT LAKES:            4,426         4,426   ............
 RESERVE CENTER RENOVATION....
                               -----------------------------------------
      TOTAL, ILLINOIS.........       86,686        90,186        +3,500

            INDIANA

ARMY: NEWPORT ARMY AMMUNITION        66,000   ............      -66,000
 PLANT: AMMUNITION
 DEMILITARIZATION FACILITY
 (PHASE IV)...................
NAVY: CRANE NAVAL SURFACE             5,820         5,820   ............
 WARFARE CENTER: SPECIAL
 WARFARE MUNITIONS ENGINEERING
 FACILITY.....................
DEFENSE-WIDE: NEWPORT ARMY      ............       66,000       +66,000
 AMMUNITION PLANT: AMMUNITION
 DEMILITARIZATION FACILITY
 (PHASE IV)...................
ARMY NATIONAL GUARD: CAMP       ............        4,947        +4,947
 ATTERBURY: BATTLE SIMULATION
 CENTER.......................
AIR FORCE RESERVE: GRISSOM           13,200        13,200   ............
 ARB: SERVICES COMPLEX (PHASE
 III).........................
                               -----------------------------------------
      TOTAL, INDIANA..........       85,020        89,967        +4,947

             IOWA

ARMY NATIONAL GUARD:                  2,713         2,713   ............
 ESTHERVILLE: READINESS CENTER
AIR NATIONAL GUARD:
    SIOUX GATEWAY AIRPORT:
        KC-135 PARKING APRON/        14,400        14,400   ............
         HYDRANT REFUELING
         SYSTEM...............
        KC-135 FUEL CELL/             8,300         8,300   ............
         CORROSION CONTROL
         HANGAR...............
        KC-135 EXTEND AND             4,300         4,300   ............
         UPGRADE TAXIWAY......
                               -----------------------------------------
      TOTAL, IOWA.............       29,713        29,713   ............

            KANSAS

ARMY:
    FORT RILEY:
        CHILD DEVELOPMENT             6,800         6,800   ............
         CENTER...............
        MODIFIED RECORD FIRE          4,100         4,100   ............
         RANGE................
ARMY NATIONAL GUARD: FORT               645           645   ............
 RILEY: ORGANIZATIONAL
 MAINTENANCE  SHOP............
                               -----------------------------------------
      TOTAL, KANSAS...........       11,545        11,545   ............

           KENTUCKY

ARMY:
    BLUE GRASS ARMY DEPOT:            3,000   ............       -3,000
     AMMUNITION
     DEMILITARIZATION FACILITY
     (PHASE II)...............
    FORT CAMPBELL:
        BARRACKS COMPLEX             47,000        47,000   ............
         (MARKET GARDEN ROAD)
         (PHASE III)..........
        DEPLOYMENT STAGING            3,300         3,300   ............
         COMPLEX..............
        DEPLOYMENT STAGING            3,300         3,300   ............
         COMPLEX/AIR..........
        DEPLOYMENT STAGING            3,300         3,300   ............
         COMPLEX/RAIL.........
        ELECTRICAL SUBSTATION.       10,000        10,000   ............
        EXPAND KEYHOLE               10,600        10,600   ............
         HARDSTAND AREA.......
        PASSENGER PROCESSING         11,400        11,400   ............
         FACILITY.............
    FORT KNOX: RANGE MULTI-     ............       12,000       +12,000
     PURPOSE DIGITAL TANK
     (PHASE IV) WILCOX RANGE..
DEFENSE-WIDE: BLUEGRASS ARMY    ............        3,000        +3,000
 DEPOT: AMMUNITION
 DEMILITARIZATION FACILITY
 (PHASE II)...................
ARMY RESERVE: FORT KNOX:             14,846        14,846   ............
 RESERVE CENTER...............
                               -----------------------------------------
      TOTAL, KENTUCKY.........      106,746       118,746       +12,000

           LOUISIANA

ARMY:
    FORT POLK:
        EDUCATION CENTER......       10,800        10,800   ............
        READINESS AND                10,400        10,400   ............
         OPERATIONS FACILITY..
AIR FORCE: BARKSDALE AFB:       ............        5,000        +5,000
 CONTROL TOWER................
ARMY NATIONAL GUARD:
    CAMP BEAUREGARD: READINESS        5,392         5,392   ............
     CENTER...................
    CARVILLE: READINESS CENTER        5,677         5,677   ............
AIR NATIONAL GUARD: NEW         ............        5,500        +5,500
 ORLEANS: VEHICLE MAINTENANCE
 SUPPORT EQUIPMENT FACILITY...
NAVY RESERVE: LAFAYETTE:              5,200         5,200   ............
 MARINE RESERVE TRAINING
 CENTER.......................
    NEW ORLEANS NAVAL AIR
     STATION:
        EQUIPMENT SHOP AND            2,270         2,270   ............
         HOLDING SHELTER......
        JOINT RESERVE CENTER    ............  ............  ............
         (PHASE II)...........
        REFUELER MAINTENANCE            650           650   ............
         FACILITY.............
        REPLACE BRIDGES.......        1,300         1,300   ............
                               -----------------------------------------
          TOTAL, LOUISIANA....       41,689        52,189       +10,500

             MAINE

NAVY:
    BRUNSWICK NAVAL AIR
     STATION:
        AIRCRAFT MAINTENANCE         41,665        41,665   ............
         HANGAR...............
        BACHELOR ENLISTED            22,630        22,630   ............
         QUARTERS.............
        P-3 SUPPORT FACILITY..        3,100         3,100   ............
    KITTTERY-PORTSMOUTH NAVAL   ............       14,620       +14,620
     STATION: BACHELOR HOUSING
ARMY NATIONAL GUARD: BANGOR:         11,618        11,618   ............
 ARMY AVIATION SUPPORT
 FACILITY (PHASE I)...........
                               -----------------------------------------
      TOTAL, MAINE............       79,013        93,633       +14,620

           MARYLAND

ARMY:
    ABERDEEN PROVING GROUND:
        AMMUNITION                   66,500   ............      -66,500
         DEMILITARIZATION
         FACILITY (PHASE IV)..
        AMMUNITION                    5,300         5,300   ............
         SURVEILLANCE FACILITY
        CLIMATIC TEST FACILITY        9,000         9,000   ............
    EDGEWOOD: CHEMISTRY              44,000        44,000   ............
     LABORATORY...............
    FORT MEADE:
        CHILD DEVELOPMENT             5,800         5,800   ............
         CENTER...............
        OPERATIONS FACILITY     ............        5,400        +5,400
         (55TH SIGNAL COMPANY)
NAVY:
    INDIAN HEAD NAVAL                 1,250         1,250   ............
     EXPLOSIVE ORDANCE CENTER:
     JOINT EOD EQUIPMENT
     MAGNETIC EVALUATION
     FACILITY.................
    PATUXENT RIVER NAVAL AIR
     WARFARE CENTER:
        ADVANCED SYSTEMS             10,770        10,770   ............
         INTEGRATION FACILITY
         (PHASE VI)...........
        RANGES OPERATIONS             2,260         2,260   ............
         SUPPORT FACILITY.....
AIR FORCE:
    ANDREWS AFB:
        CONSOLIDATE SQUADRON         10,070        10,070   ............
         OPERATIONS FACILITY..
        REPAIR EAST RUNWAY....        7,600         7,600   ............
        UPGRADE FIRE TRAINING         1,750         1,750   ............
         FACILITY.............
DEFENSE-WIDE:
    ABERDEEN PROVING GROUND:
        AMMUNITION              ............       66,500       +66,500
         DEMILITARIZATION
         FACILITY (PHASE IV)..
        OPERATIONAL TRAINING          3,200         3,200   ............
         FACILITY.............
    ANDREWS AFB:
        ADD/ALTER MEDICAL             7,300         7,300   ............
         CLINIC...............
        BRANCH MEDICAL/DENTAL         2,950         2,950   ............
         CLINIC RELOCATION....
ARMY NATIONAL GUARD:                  2,314         2,314   ............
 SALISBURY: ORGANIZATIONAL
 MAINTENANCE  SHOP............
                               -----------------------------------------
      TOTAL, MARYLAND.........      180,064       185,464        +5,400

         MASSACHUSETTS

AIR FORCE: HANSCOM AFB:               9,400         9,400   ............
 RENOVATE ACQUISITION MGMT
 FACILITY (PHASE III).........
ARMY NATIONAL GUARD:                  8,347         8,347   ............
 FRAMINGHAM: ORGANIZATIONAL
 MAINTENANCE SHOP.............
                               -----------------------------------------
      TOTAL, MASSACHUSETTS....       17,747        17,747   ............

           MICHIGAN

ARMY NATIONAL GUARD:
    LANSING: COMBINED SUPPORT         5,809         5,809   ............
     MAINTENANCE SHOP (PHASE
     II)......................
    AUGUSTA/BATTLE CREEK: TASS  ............       13,318       +13,318
     BARRACKS.................
AIR NATIONAL GUARD:
    SELFRIDGE ANGB: RUNWAY            2,000         2,000   ............
     CLEAR ZONE LAND
     ACQUISITION..............
    BATTLE CREEK: MUNITIONS     ............        9,500        +9,500
     AND MAINTENANCE STORAGE
     COMPLEX..................
NAVY RESERVE: SELFRIDGE ANGB:         1,490         1,490   ............
 VEHICLE MAINTENANCE FACILITY.
                               -----------------------------------------
      TOTAL, MICHIGAN.........        9,299        32,117       +22,818

           MINNESOTA

AIR NATIONAL GUARD: DULUTH      ............       10,000       +10,000
 INTERNATIONAL AIRPORT:
 COMPOSITE AIRCRAFT
 MAINTENANCE COMPLEX (PHASE I)
NAVY RESERVE: DULUTH: RESERVE         2,980         2,980   ............
 CENTER ADDITION..............
                               -----------------------------------------
      TOTAL, MINNESOTA........        2,980        12,980       +10,000

          MISSISSIPPI

NAVY:
    GULFPORT NAVAL
     CONSTRUCTION BATTALION
     CENTER:
        BACHELOR ENLISTED            14,300        14,300   ............
         QUARTERS.............
        MOBILIZATION                  7,360         7,360   ............
         OPERATIONS FACILITY..
    PASCAGOULA: FLEET           ............        4,680        +4,680
     OPERATIONS BUILDING......
    MERDIAN NAVAL AIR STATION:  ............        3,370        +3,370
     T-45 SUPPORT FACILITY....
AIR FORCE:
    REPLACE TECHNICAL TRAINING       28,600        28,600   ............
     FACILITY (PHASE II-A)....
    COLUMBUS AFB: RADAR         ............        5,000        +5,000
     APPROACH CONTROL CENTER..
ARMY NATIONAL GUARD:
    CAMP SHELBY: MILITARY            11,444        11,444   ............
     EDUCATION CENTER (PHASE
     II)......................
    GULFPORT: READINESS CENTER        9,145         9,145   ............
AIR NATIONAL GUARD:
    JACKSON IAP:
        C-17 FACILITY                16,500        16,500   ............
         CONVERSION...........
        UPGRADE CORROSION             5,700         5,700   ............
         CONTROL FACILITY.....
AIR FORCE RESERVE: KEESLER           12,000        12,000   ............
 AFB: C-130J MAINTENANCE
 HANGAR.......................
                               -----------------------------------------
      TOTAL, MISSISSIPPI......      105,049       118,099       +13,050

           MISSOURI

ARMY:
    FORT LEONARD WOOD:
        BASIC COMBAT TRAINING        27,000        27,000   ............
         COMPLEX (PHASE II)...
        NIGHT FIRE RANGE......        4,300         4,300   ............
        RECORD FIRE RANGE.....        3,550         3,550   ............
NAVY: KANSAS CITY MARINE CORPS        9,010         9,010   ............
 SUPPORT ACTIVITY: BACHELOR
 ENLISTED QUARTERS............
                               -----------------------------------------
      TOTAL, MISSOURI.........       43,860        43,860   ............

            MONTANA

AIR FORCE: MALMSTROM AFB:       ............        4,650        +4,650
 CHILD DEVELOPMENT CENTER.....
ARMY NATIONAL GUARD:                    822           822   ............
 KALISPELL: READINESS CENTER..
                               -----------------------------------------
      TOTAL, MONTANA..........          822         5,472        +4,650

           NEBRASKA

AIR FORCE: OFFUTT AFB: FIRE/    ............       10,400       +10,400
 CRASH RESCUE STATION.........
                               -----------------------------------------
      TOTAL, NEBRASKA.........  ............       10,400       +10,400

            NEVADA

NAVY: FALLON NAS: WATER         ............        6,150        +6,150
 TREATMENT FACILITY...........
AIR FORCE:
    NELLIS AFB:
        DYNAMIC BATTLE CONTROL       12,600        12,600   ............
         CENTER...............
        LAND ACQUISITION......  ............       19,000       +19,000
AIR NATIONAL GUARD: RENO-TAHOE        8,500         8,500   ............
 IAP: REPLACE BASE SUPPLY
 WAREHOUSE COMPLEX............
                               -----------------------------------------
      TOTAL, NEVADA...........       21,100        46,250       +25,150

         NEW HAMPSHIRE

ARMY NATIONAL GUARD:
    CONCORD:
        ARMY AVIATION SUPPORT        27,185        27,185   ............
         FACILITY.............
        READINESS CENTER......        1,868         1,868   ............
AIR NATIONAL GUARD: PEASE AFB:        2,200         2,200   ............
 KC-135R SIMULATOR TRAINING
 FACIL-  ITY..................
ARMY RESERVE: ROCHESTER:              9,122         9,122   ............
 RESERVE CENTER/ORGANIZATIONAL
 MAINTENANCE SHOP.............
                               -----------------------------------------
      TOTAL, NEW HAMPSHIRE....       40,375        40,375   ............

          NEW JERSEY

ARMY: FORT MONMOUTH: BARRACKS.       20,000        20,000   ............
NAVY: EARLE NAS: EXPLOSIVE      ............        4,370        +4,370
 TRUCK HOLDING YARDS (3)......
AIR FORCE:
    C-17 ADD/ALTER FUEL CELL..        1,050         1,050   ............
    C-17 COMMUNICATIONS               1,400         1,400   ............
     SUPPORT..................
    C-17 FLIGHT SIMULATOR             4,900         4,900   ............
     FACILITY.................
    C-17 MAINTENANCE HANGAR...       27,700        27,700   ............
    C-17 THREE BAY HANGAR.....        1,500         1,500   ............
DEFENSE-WIDE: MCGUIRE AFB:            4,400         4,400   ............
 BULK FUEL STORAGE TANK.......
AIR NATIONAL GUARD:
    ATLANTIC CITY IAP:                6,300         6,300   ............
     COMMUNICATIONS/SECURITY
     FORCES COMPLEX...........
    MCGUIRE AFB: REPLACE JOINT        4,900         4,900   ............
     MEDICAL TRAINING FACILITY
ARMY RESERVE: FORT DIX:              12,000        12,000   ............
 BARRACKS MODERNIZATION.......
                               -----------------------------------------
      TOTAL, NEW JERSEY.......       84,150        88,520        +4,370

          NEW MEXICO

ARMY: WHITE SANDS MISSILE       ............        7,600        +7,600
 RANGE: PROFESSIONAL
 DEVELOPMENT CENTER...........
AIR FORCE:
    CANNON AFB: REPLACE FIRE/         9,400         9,400   ............
     CRASH RESCUE STATION.....
    KIRTLAND AFB: TELESCOPE/         15,500        15,500   ............
     ATMOSPHERE COMPENSATION
     LABORATORY...............
DEFENSE-WIDE: HOLLOMAN AFB:           5,700         5,700   ............
 MEDICAL CLINIC ALTERATION....
                               -----------------------------------------
      TOTAL, NEW MEXICO.......       30,600        38,200        +7,600

           NEW YORK

ARMY:
    FORT DRUM:
        BATTLE SIMULATION             9,000         9,000   ............
         CENTER (PHASE II)....
        FIELD OPERATIONS              2,150         2,150   ............
         FACILITY.............
        HAZARDOUS MATERIALS           4,700         4,700   ............
         STORAGE FACILITY.....
        TACTICAL EQUIPMENT           31,000        31,000   ............
         SHOPS................
    U.S. MILITARY ACADEMY:           37,900        37,900   ............
     CADET PHYSICAL
     DEVELOPMENT CENTER (PHASE
     II)......................
ARMY NATIONAL GUARD: FORT            17,000        17,000   ............
 DRUM: MANEUVER AREA TRAINING
 EQUIPMENT SITE (PHASE I).....
AIR NATIONAL GUARD:
    FRANCIS S. GABRESKI              19,000        19,000   ............
     AIRPORT: COMPOSITE
     SUPPORT COMPLEX..........
    NIAGARA FALLS               ............        2,800        +2,800
     INTERNATIONAL AIRPORT:
     FUEL CELL/CORROSION
     HANGAR ADDITION..........
                               -----------------------------------------
        TOTAL, NEW YORK.......      120,750       123,550        +2,800

        NORTH CAROLINA

ARMY:
    FORT BRAGG:
        BARRACKS COMPLEX             49,000        49,000   ............
         (BUTNER ROAD) (PHASE
         II)..................
        BARRACKS COMPLEX             27,000        27,000   ............
         (LONGSTREET ROAD)
         (PHASE II)...........
        BARRACKS COMPLEX             17,500        17,500   ............
         (TAGAYTAY ROAD)
         (PHASE II-C).........
        PARACHUTE TEAM GENERAL        7,700         7,700   ............
         PURPOSE BUILDING.....
        VEHICLE MAINTENANCE          13,600        13,600   ............
         FACILITY.............
    SUNNY POINT MILITARY OCEAN
     TERMINAL:
        DEPLOYMENT STAGING            2,000         2,000   ............
         AREA.................
        FIRE STATION..........        2,750         2,750   ............
        OPEN STORAGE AREA.....        2,050         2,050   ............
        ROAD IMPROVEMENTS AND         4,600         4,600   ............
         TRUCK PAD............
NAVY:
    CAMP LEJEUNE MARINE CORPS
     BASE:
        ACADEMIC BUILDING.....       15,860        15,860   ............
        AMMUNITION STORAGE            5,880         5,880   ............
         MAGAZINE UPGRADE
         (PHASE I)............
        BACHELOR ENLISTED            16,530        16,530   ............
         QUARTERS.............
        BACHELOR ENLISTED            13,550        13,550   ............
         QUARTERS.............
        ENGINEERING EQUIPMENT         6,960         6,960   ............
         MAINTENANCE SHOP.....
        LANDFILL CELL.........        8,290         8,290   ............
    NEW RIVER MARINE CORPS AIR
     STATION:
        PROPERTY CONTROL              1,560         1,560   ............
         FACILITY.............
        PROPERTY CONTROL              2,490         2,490   ............
         FACILITY.............
AIR FORCE: POPE AFB:                 17,800        17,800   ............
 CONSOLIDATE C-130 CORROSION
 CONTROL FACILITY.............
DEFENSE-WIDE:
    CAMP LEJEUNE MARINE CORPS         8,857         8,857   ............
     BASE: ELEMENTARY SCHOOL
     ADDITION AND RENOVATION..
    FORT BRAGG:
        IMAGERY AND ANALYSIS          3,150         3,150   ............
         FACILITY.............
        LANGUAGE SUSTAINMENT          2,100         2,100   ............
         TRAINING FACILITY....
        REPAIR TRAINING               1,812         1,812   ............
         FACILITY.............
        TEAM OPERATIONS/              5,800         5,800   ............
         INFORMATION
         AUTOMATION FACILITY..
        TRAINING FACILITY.....        5,000         5,000   ............
        TRAINING RANGE........        2,600         2,600   ............
        VEHICLE MAINTENANCE           3,600         3,600   ............
         COMPLEX..............
        WEATHER OPERATIONS            1,000         1,000   ............
         FACILITY.............
        BATTALION OPERATIONS/         8,500         8,500   ............
         VEHICLE MAINTENANCE
         FACILITY.............
    POPE AFB: BULK FUEL               3,400         3,400   ............
     STORAGE TANK.............
                               -----------------------------------------
      TOTAL, NORTH CAROLINA...      260,939       260,939   ............

         NORTH DAKOTA

AIR FORCE: GRAND FORKS AFB: KC-       7,800         7,800   ............
 135 SQUADRON OPERATIONS/
 AIRCRAFT MAINT UNIT..........
DEFENSE-WIDE:
    GRAND FORKS AFB: HYDRANT          9,110         9,110   ............
     FUEL SYSTEM..............
    MINOT AFB: HYDRANT FUEL          14,000        14,000   ............
     SYSTEM...................
AIR NATIONAL GUARD: FARGO/      ............        5,000        +5,000
 HECTOR: WEAPONS RELEASE
 SYSTEMS  SHOP................
                               -----------------------------------------
      TOTAL, NORTH DAKOTA.....       30,910        35,910        +5,000

             OHIO

AIR FORCE:
    WRIGHT-PATTERSON AFB:
        ADD/ALTER SPECIAL             3,450         3,450   ............
         OPERATIONS
         INTELLIGENCE FACILITY
        CONSOLIDATE ACQ              21,400        21,400   ............
         MANAGEMENT COMPLEX
         (PHASE IV-B).........
        SECURITY GATE,BASE      ............        3,400        +3,400
         ENTRANCE.............
    CINCINNATI: READINESS             9,780         9,780   ............
     CENTER...................
ARMY RESERVE: CLEVELAND: LAND         1,200         1,200   ............
 ACQUISITION..................
                               -----------------------------------------
      TOTAL, OHIO.............       35,830        39,230        +3,400

           OKLAHOMA

ARMY: FORT SILL: DEPLOYMENT           5,100         5,100   ............
 STAGING COMPLEX..............
AIR FORCE:
    ALTUS AFB:
        REPAIR AIRFIELD              20,200        20,200   ............
         PAVEMENTS (PHASE I)..
        DORMITORY.............       10,200        10,200   ............
        DEPOT PLATING SHOP....  ............       11,200       +11,200
    VANCE AFB: ROAD REPAIR      ............        4,809        +4,809
     (ELAM ROAD)..............
                               -----------------------------------------
      TOTAL, OKLAHOMA.........       35,500        51,509       +16,009

            OREGON

ARMY NATIONAL GUARD: EUGENE:    ............        8,300        +8,300
 JOINT ARMED FORCES RESERVE
 CENTER (PH I)................

         PENNSYLVANIA

DEFENSE-WIDE:
    NEW CUMBERLAND DEFENSE           19,900        19,900   ............
     DISTRIBUTION DEPOT:
     SPECIAL PURPOSE WAREHOUSE
    PHILADELPHIA DEFENSE              2,429         2,429   ............
     SUPPLY CENTER:
     CONSOLIDATE INDOOR
     FITNESS FACILITIES.......
AIR NATIONAL GUARD:
    PITTSBURGH IAP:
        REPLACE VEHICLE               3,200         3,200   ............
         MAINTENANCE COMPLEX..
        SQUADRON OPERATIONS     ............        7,700        +7,700
         AND SUPPORT FACILITY
         (171ST AIR REFUELING
         SQDN)................
NAVY RESERVE: WILLOW GROVE:           3,715         3,715   ............
 HANGAR FIRE PROTECTION
 UPGRADES.....................
                               -----------------------------------------
      TOTAL, PENNSYLVANIA.....       29,244        36,944        +7,700

         RHODE ISLAND

NAVY:
    NEWPORT NAVAL STATION:
        SPECIAL WARFARE              15,290        15,290   ............
         OFFICERS INSTRUCTION
         BUILDING.............
        LAB-UNMANNED UNDERSEA   ............        9,370        +9,370
         COMBAT VEHICLE.......
AIR NATIONAL GUARD: QUONSET           9,600         9,600   ............
 STATE AIRPORT: C-130J REPLACE
 COMPOSITE MAINTENANCE SHOPS..
                               -----------------------------------------
      TOTAL, RHODE ISLAND.....       24,890        34,260        +9,370

        SOUTH CAROLINA

ARMY: FORT JACKSON: BASIC            26,000        26,000   ............
 COMBAT TRAINEE COMPLEX (PHASE
 I)...........................
NAVY:
    BEAUFORT MARINE CORPS AIR
     STATION:
        AIRBORNE WEAPONS              1,960         1,960   ............
         SUPPORT EQUIPMENT
         WAREHOUSE............
        CHILD DEVELOPMENT             6,060         6,060   ............
         CENTER...............
    PARRIS ISLAND MARINE CORPS        5,430         5,430   ............
     RECRUIT DEPOT: MILITARY
     POLICE AND EMERGENCY
     SERVICES FACILITY........
AIR FORCE: SHAW AFB: EDUCATION  ............        5,800        +5,800
 CENTER.......................
DEFENSE-WIDE: BEAUFORT MARINE        12,850        12,850   ............
 CORPS AIR STATION: REPLACE
 LAUREL BAY ELEMENTARY SCHOOL.
                               -----------------------------------------
      TOTAL, SOUTH CAROLINA...       52,300        58,100        +5,800

         SOUTH DAKOTA

AIR FORCE: ELLSWORTH AFB: LIVE  ............       12,200       +12,200
 ORDNANCE LOADING AREA........
ARMY NATIONAL GUARD:
    MITCHELL: COMBINED SUPPORT       14,228        14,228   ............
     MAINTENANCE SHOP.........
    JOE FOSS FIELD/SOUIX CITY:  ............        6,500        +6,500
     RUNWAY/TAXIWAY
     IMPROVEMENT..............
                               -----------------------------------------
      TOTAL, SOUTH DAKOTA.....       14,228        32,928       +18,700

           TENNESSEE

NAVY: MILLINGTON NAVAL SUPPORT        3,900         3,900   ............
 ACTIVITY: ELEVATED WATER TANK
AIR FORCE:
    ARNOLD AFB:
        CONVERT TO HYPERSONIC        10,400        10,400   ............
         PLANT................
        UPGRADE JET ENGINE AIR       14,000        14,000   ............
         INDUCTION SYSTEM
         (PHASE IV)...........
ARMY NATIONAL GUARD:
    ALCOA: READINESS CENTER...        8,203         8,203   ............
    HENDERSON: OPERATIONAL            2,012         2,012   ............
     MAINTENANCE SHOP.........
                               -----------------------------------------
      TOTAL, TENNESSEE........       38,515        38,515   ............

             TEXAS

ARMY:
    FORT HOOD:
        BARRACKS COMPLEX......       41,000        41,000   ............
        COMMAND AND CONTROL          10,000        10,000   ............
         FACILITY (PHASE II)..
        MULTI-PURPOSE DIGITAL        13,000        13,000   ............
         TRAINING RANGE (PHASE
         II)..................
        VEHICLE MAINTENANCE          12,200        12,200   ............
         FACILITY.............
        VEHICLE MAINTENANCE          23,000        23,000   ............
         FACILITY.............
    FORT SAM HOUSTON: GENERAL         2,250         2,250   ............
     INSTRUCTION BUILDING.....
NAVY: KINGSVILLE NAS: AIRFIELD  ............        6,160        +6,160
 LIGHTING.....................
AIR FORCE:
    LACKLAND AFB:
        JOINT ADVANCED                4,200         4,200   ............
         LANGUAGE TRAINING
         CENTER...............
        DORMITORY.............        8,600         8,600   ............
    LAUGHLIN AFB: ADD/ALTER          12,000        12,000   ............
     FITNESS CENTER...........
    SHEPPARD AFB:
        REPLACE STUDENT              16,000        16,000   ............
         DORMITORY/DINING
         FACILITY.............
        STUDENT DORMITORY/           21,000        21,000   ............
         DINING FACILITY......
    DYESS AFB: C-130 SQUADRON   ............       16,800       +16,800
     OPERATIONS FACILITY......
DEFENSE-WIDE:
    DYESS AFB: MEDICAL                3,300         3,300   ............
     TREATMENT FACILITY
     ALTERATION...............
    FORT HOOD: ADD/ALTER             12,200        12,200   ............
     HOSPITAL.................
ARMY NATIONAL GUARD: AUSTIN:         25,659        25,659   ............
 ARMY AVIATION SUPPORT
 FACILITY.....................
AIR NATIONAL GUARD: CAMP                900           900   ............
 MABRY: REPLACE WEATHER FLIGHT
 COM-  PLEX...................
ARMY RESERVE: RED RIVER ARMY          1,862         1,862   ............
 DEPOT: RESERVE CENTER/
 ORGANIZATIONAL MAINTENANCE
 SHOP.........................
                               -----------------------------------------
      TOTAL, TEXAS............      207,171       230,131       +22,960

             UTAH

AIR FORCE:
    HILL AFB:
        CONSOLIDATE HYDRAULIC/       14,000        14,000   ............
         PNEUDRAULIC REPAIR
         FACILITY.............
        DEPOT MAINTENANCE       ............        8,000        +8,000
         HANGAR (PHASE I).....
                               -----------------------------------------
          TOTAL, UTAH.........       14,000        22,000        +8,000

           VIRGINIA

ARMY:
    FORT BELVOIR:
        CHAPEL................        4,950         4,950   ............
        OPERATIONS BUILDING...       31,000        31,000   ............
    FORT EUSTIS:
        FIELD OPERATIONS              1,750         1,750   ............
         FACILITY.............
        MAIN PIER.............       23,000        23,000   ............
        ACCESS ROAD...........  ............        9,900        +9,900
    FORT LEE:
        AIRBORNE TRAINING            17,500        17,500   ............
         FACILITY.............
        MILITARY ENTRANCE             6,400         6,400   ............
         PROCESSING STATION...
NAVY:
    NORFOLK NAVAL STATION:
        AIRCRAFT MAINTENANCE         11,300        11,300   ............
         HANGAR REPLACEMENT...
        AIRCRAFT MAINTENANCE         14,100        14,100   ............
         HANGAR REPLACEMENT...
        AIRFIELD PAVEMENT             6,360         6,360   ............
         UPGRADE..............
        BACHELOR ENLISTED            14,730        14,730   ............
         QUARTERS
         MODERNIZATION........
        DEPERMING PIER                2,810         2,810   ............
         REPLACEMENT..........
        PIER REPLACEMENT             28,210        28,210   ............
         (PHASE I)............
        WATERFRONT ELECTRICAL        15,620        15,620   ............
         UPGRADE..............
        WATERFRONT ELECTRICAL        12,900        12,900   ............
         UPGRADE..............
    QUANTICO MARINE CORPS
     COMBAT DEVELOPMENT
     COMMAND:
        AIRCRAFT FIRE AND             3,790         3,790   ............
         RESCUE STATION.......
        BACHELOR ENLISTED             9,390         9,390   ............
         QUARTERS.............
AIR FORCE:
    LANGLEY AFB:
        DORMITORY.............        8,300         8,300   ............
        F-22 LOW OBSERVABLE/         16,000        16,000   ............
         COMPOSITE REPAIR
         FACILITY.............
        F-22 OPERATIONS AND          19,000        19,000   ............
         MAINTENANCE FACILITY.
        F-22 UPGRADE                  4,000         4,000   ............
         FLIGHTLINE
         INFRASTRUCTURE.......
DEFENSE-WIDE:
    FORT BELVOIR: ADDITIONAL            900           900   ............
     CHILLER UNIT.............
    NORFOLK: ADD/ALTER BRANCH        21,000        21,000   ............
     MEDICAL CLINIC...........
    PENTAGON: PHYSICAL FITNESS       25,000        25,000   ............
     AND READINESS FACILITY...
ARMY NATIONAL GUARD: FORT       ............       10,700       +10,700
 PICKETT: MANEUVER AND
 EQUIPMENT TRAINING SITE......
NAVY RESERVE: WILLIAMSBURG:           2,130         2,130   ............
 HEADQUARTERS BUILDING........
                               -----------------------------------------
      TOTAL, VIRGINIA.........      300,140       320,740       +20,600

            VERMONT

AIR NATIONAL GUARD:             ............        5,600        +5,600
 BURLINGTON: VEHICLE
 MAINTENANCE COMPLEX..........

          WASHINGTON

ARMY:
    FORT LEWIS:
        AMMUNITION SUPPLY            17,000        17,000   ............
         POINT EXPANSION......
        BARRACKS COMPLEX (17TH       48,000        48,000   ............
         AND B STREET) (PHASE
         I)...................
        COMBAT VEHICLE TRAIL..        7,300         7,300   ............
        DEPLOYMENT STAGING           15,500        15,500   ............
         COMPLEX..............
        DEPLOYMENT STAGING           16,500        16,500   ............
         COMPLEX/RAIL.........
        PALLET HANDING               13,200        13,200   ............
         FACILITY.............
        VEHICLE MAINTENANCE           9,100         9,100   ............
         FACILITY.............
        VEHICLE MAINTENANCE           9,600         9,600   ............
         FACILITY.............
NAVY:
    BANGOR STRATEGIC WEAPONS          3,900         3,900   ............
     FACILITY: UTILITIES AND
     SITE IMPROVEMENTS........
    BREMERTON NAVAL STATION:         24,460        24,460   ............
     REPLACE PIER DELTA (PHASE
     II)......................
    EVERETT NAVAL STATION:            6,820         6,820   ............
     SHORE INTERMEDIATE
     MAINTENANCE FACILITY.....
    WHIDBEY ISLAND NAVAL AIR
     STATION:
        P-3 SUPPORT FACILITY..        3,470         3,470   ............
        CONTROL TOWER.........  ............        3,900        +3,900
AIR FORCE:
    FAIRCHILD AFB: REPLACE            2,800         2,800   ............
     MUNITIONS MAINTENANCE
     ADMIN FACIL-  ITY........
    MCCHORD AFB:
        ADD/ALTER MISSION            15,800        15,800   ............
         SUPPORT CENTER (PHASE
         I)...................
        C-17 EXTEND NOSE DOCKS        4,900         4,900   ............
DEFENSE-WIDE:
    FORT LEWIS:
        LANGUAGE SUSTAINMENT          1,100         1,100   ............
         TRAINING FACILITY....
        TACTICAL EQUIPMENT            5,800         5,800   ............
         COMPLEX..............
    WHIDBEY ISLAND NAVAL AIR          6,600         6,600   ............
     STATION: AIRCREW WATER
     SURVIVAL TRAINING
     FACILITY.................
ARMY RESERVE: FORT LEWIS:            21,978        21,978   ............
 RESERVE CENTER/ORGANIZATIONAL
 MAINTENANCE SHOP.............
                               -----------------------------------------
      TOTAL, WASHINGTON.......      233,828       237,728        +3,900

         WEST VIRGINIA

ARMY NATIONAL GUARD:            ............        6,433        +6,433
 WILLIAMSTOWN: READINESS
 CENTER.......................
GLEN JEAN:
    ARMED FORCES RESERVE        ............       21,389       +21,389
     CENTER/ORGANIZATION
     MAINTENANCE  SHOP........
AIR NATIONAL GUARD: YEAGER AIR  ............        4,100        +4,100
 BASE: CIVIL ENGINEER/WEAPONS
 COMPLEX......................
                               -----------------------------------------
      TOTAL, WEST VIRGINIA....  ............       31,922       +31,922

           WISCONSIN

ARMY NATIONAL GUARD: OSHKOSH:         5,274         5,274   ............
 ORGANIZATIONAL MAINTENANCE
 SHOP.........................
AIR NATIONAL GUARD: CAMP        ............        5,700        +5,700
 DOUGLAS/VOLK FIELD: CONTROL
 TOWER........................
                               -----------------------------------------
      TOTAL, WISCONSIN........        5,274        10,974        +5,700

            WYOMING

AIR FORCE: F.E. WARREN AFB:          10,200        10,200   ............
 FITNESS CENTER...............
DEFENSE-WIDE: F. E. WARREN            2,700         2,700   ............
 AFB: MEDICAL CLINIC
 ALTERATION...................
NAVY RESERVE: CHEYENNE:               1,060         1,060   ............
 RESERVE CENTER ADDITION......
                               -----------------------------------------
      TOTAL, WYOMING..........       13,960        13,960   ............

          EL SALVADOR

DEFENSE-WIDE: COMALAPA AB:           12,577        12,577   ............
 FORWARD OPERATING LOCATION...

            GERMANY

ARMY:
    BAMBERG:
        BARRACKS COMPLEX             20,000        20,000   ............
         (WARNER'S 3).........
        PHYSICAL FITNESS             16,000        16,000   ............
         TRAINING CENTER......
    BAUMHOLDER: VEHICLE               9,000         9,000   ............
     MAINTENANCE FACILITY.....
    DARMSTADT:
        BARRACKS COMPLEX              6,700         6,700   ............
         (CAMBRAI FRITSCH
         4028)................
        BARRACKS COMPLEX              6,800         6,800   ............
         (KELLEY 4163)........
    HANAU: BARRACKS COMPLEX           7,200         7,200   ............
     (PIONEER 8)..............
    HEIDELBERG:
        BARRACKS COMPLEX              6,800         6,800   ............
         (PATTON 114).........
        BARRACKS COMPLEX              8,500         8,500   ............
         (TOMPKINS 4253)......
    MANNHEIM: VEHICLE                16,000        16,000   ............
     MAINTENANCE FACILITY.....
    WEISBADEN:
        CHILD DEVELOPMENT             6,800         6,800   ............
         CENTER...............
        PHYSICAL FITNESS             19,500        19,500   ............
         TRAINING CENTER......
AIR FORCE:
    RAMSTEIN AB:
        COMBAT COMMUNICATIONS        15,000        15,000   ............
         SQUADRON COMPLEX
         (PHASE I)............
        DORMITORY.............       11,000        11,000   ............
        FREIGHT TERMINAL AND          9,400         9,400   ............
         DEFENSE COURIER
         SERVICE..............
        STRATEGIC LIFT AREA           4,600         4,600   ............
         EXPANSION............
        UPGRADE UTILITY               2,900         2,900   ............
         INFRASTRUCTURE.......
    SPANGDAHLEM AB:
        NORTHWEST                     6,200         6,200   ............
         INFRASTRUCTURE
         EXPANSION............
        REFUELER VEHICLE              2,500         2,500   ............
         MAINTENANCE FACILITY.
DEFENSE-WIDE:
    GEILENKIRCHEN: ELEMENTARY         1,733         1,733   ............
     SCHOOL MULTI PURPOSE ROOM
    HEIDELBERG:
        HOSPITAL ADDITION/           28,000        28,000   ............
         CLINIC ALTERATION....
        ELEMENTARY SCHOOL             3,312         3,312   ............
         CLASSROOM ADDITION/
         RENOVATION...........
    KAISERLAUTERN: ELEMENTARY         1,439         1,439   ............
     SCHOOL CLASSROOM ADDITION
    KITZINGEN: ELEMENTARY             1,394         1,394   ............
     SCHOOL CLASSROOM ADDITION
    LANDSTUHL: ELEMENTARY             1,444         1,444   ............
     SCHOOL/MIDDLE SCHOOL
     CLASSROOM ADDITION.......
    RAMSTEIN: HIGH SCHOOL             2,814         2,814   ............
     CLASSROOM ADDITION.......
    VOGELWEH: ELEMENTARY              1,558         1,558   ............
     SCHOOL CLASSROOM ADDITION/
     RENOVA-  TION............
    WEISBADEN: ELEMENTARY             1,378         1,378   ............
     SCHOOL CLASSROOM ADDITION
    WUERZBURG: ELEMENTARY             2,684         2,684   ............
     SCHOOL CLASSROOM/
     GYMNASIUM ADDITION.......
                               -----------------------------------------
        TOTAL, GERMANY........      220,656       220,656   ............

            GREECE

NAVY:
    LARISSA NAVAL SUPPORT            12,240        12,240   ............
     ACTIVITY: BACHELOR
     ENLISTED QUARTERS........
    SOUDA BAY NAVAL SUPPORT           3,210         3,210   ............
     ACTIVITY: SEWAGE
     TREATMENT PLANT ADDITION.
                               -----------------------------------------
        TOTAL, GREECE.........       15,450        15,450   ............

           GREENLAND

AIR FORCE: THULE AB: REPLACE         19,000   ............      -19,000
 TAXIWAYS/APRONS..............
DEFENSE-WIDE: THULE AB:              10,800        10,800   ............
 COMPOSITE MEDICAL FACILITY
 REPLACEMENT..................
                               -----------------------------------------
      TOTAL, GREENLAND........       29,800        10,800       -19,000

             GUAM

NAVY:
    GUAM NAVAL SUPPORT
     ACTIVITY:
        BACHELOR ENLISTED             9,300         9,300   ............
         QUARTERS
         MODERNIZATION........
        WATERFRONT UTILITIES         14,800        14,800   ............
         UPGRADE..............
AIR FORCE:
    ANDERSEN AFB:
        WAR RESERVE MATERIAL          4,550         4,550   ............
         STORAGE FACILITY.....
        REPLACE SECURITY              5,600         5,600   ............
         FORCES OPERATIONS
         FACILITY.............
DEFENSE-WIDE: ANDERSEN AFB:          20,000        20,000   ............
 REPLACE HYDRANT FUEL SYSTEM..
AIR NATIONAL GUARD: ANDERSON          4,300         4,300   ............
 AFB: OPERATIONS AND TRAINING
 FACILITY.....................
                               -----------------------------------------
      TOTAL, GUAM.............       58,550        58,550   ............

            ICELAND

NAVY: KEFLAVIK NAVAL AIR              2,820         2,820   ............
 STATION: SOLID WASTE DISPOSAL
 CONNECTION CHARGE............

             ITALY

NAVY: SIGONELLA NAVAL AIR             3,060         3,060   ............
 STATION: P-3 SUPPORT FACILITY
AIR FORCE:
    AVIANO AB:
        DORMITORY.............        8,200         8,200   ............
        INDOOR FIRING RANGE...        3,600         3,600   ............
DEFENSE-WIDE: AVIANO AB:              3,647         3,647   ............
 ELEMENTARY SCHOOL CLASSROOM
 ADDITION.....................
                               -----------------------------------------
      TOTAL, ITALY............       18,507        18,507   ............

             JAPAN

DEFENSE-WIDE: YOKOTA AB: BULK        13,000        13,000   ............
 FUEL STORAGE TANK............

             KOREA
ARMY:
    CAMP CARROLL:
        ELECTRICAL                    8,000         8,000   ............
         DISTRIBUTION SYSTEM..
        PHYSICAL FITNESS              8,593         8,593   ............
         TRAINING CENTER......
    CAMP CASEY: VEHICLE               8,500         8,500   ............
     MAINTENANCE FACILITY.....
    CAMP HOVEY:
        BARRACKS COMPLEX......       33,000        33,000   ............
        SANITARY SEWER SYSTEM.        2,750         2,750   ............
    CAMP HUMPHREYS: BARRACKS         14,500        14,500   ............
     COMPLEX..................
    CAMP JACKSON: GENERAL             6,100         6,100   ............
     INSTRUCTION BUILDING.....
    CAMP STANLEY: BARRACKS           28,000        28,000   ............
     COMPLEX..................
AIR FORCE:
    KUNSAN AB: ADD/ALTER             12,000        12,000   ............
     FITNESS CENTER...........
    OSAN AB:
        DORMITORY.............       14,400        14,400   ............
        DORMITORY.............       15,800        15,800   ............
        OFFICER DORMITORY.....        9,700         9,700   ............
        REPLACE BASE CIVIL           36,000   ............      -36,000
         ENGINEER COMPLEX.....
        REPLACE TRAFFIC               5,925         5,925   ............
         MANAGEMENT FACILITY..
        REPLACE VEHICLE               2,000         2,000   ............
         OPERATIONS/
         ADMINISTRATION
         FACILITY.............
        VEHICLE MAINTENANCE          17,317        17,317   ............
         FACILITY.............
DEFENSE-WIDE: CAMP CASEY:             5,500         5,500   ............
 REPLACE FUEL STORAGE FACILITY
                               -----------------------------------------
      TOTAL, KOREA............      228,085       192,085       -36,000

           KWAJALEIN

ARMY: KWAJALEIN ATOLL: COLD          11,000        11,000   ............
 STORAGE WAREHOUSE............

             OMAN

AIR FORCE: MASIRAH ISLAND:      ............        8,000        +8,000
 AIRFIELD REPAIRS (PHASE II)..

           PORTUGAL

DEFENSE-WIDE: LAJES FIELD:            3,750         3,750   ............
 DENTAL CLINIC REPLACEMENT....

        AMERICAN SAMOA

ARMY RESERVE: AMERICAN SAMOA:        19,703        19,703   ............
 RESERVE CENTER/ORGANIZATIONAL
 MAINTENANCE SHOP.............

             SPAIN

NAVY: ROTA NAVAL STATION:             2,240         2,240   ............
 AIRCRAFT FIRE AND RESCUE
 ADDITION.....................
DEFENSE-WIDE: ROTA NAVAL              3,000         3,000   ............
 STATION: MARINE LOADING ARMS.
                               -----------------------------------------
      TOTAL, SPAIN............        5,240         5,240   ............

            TURKEY

AIR FORCE: ESKISEHIR:                 4,000         4,000   ............
 DORMITORY/MISSION SUPPORT
 FACILITY.....................

        UNITED KINGDOM

AIR FORCE:
    RAF MILDENHALL:
        AVIONICS MAINTENANCE         10,800        10,800   ............
         COMPLEX (PHASE II)...
        FITNESS CENTER........       11,600        11,600   ............
    RAF LAKENHEATH: REPLACE          11,300        11,300   ............
     SUPPLY MATERIAL CONTROL
     FACILITY.................
DEFENSE-WIDE: RAF FELTWELL:          22,132        22,132   ............
 CONSTRUCT NEW MIDDLE SCHOOL..
                               -----------------------------------------
      TOTAL, UNITED KINGDOM...       55,832        55,832   ............

          WAKE ISLAND

AIR FORCE: WAKE ISLAND: REPAIR       25,000   ............      -25,000
 AIRFIELD PAVEMENT (PHASE I)..

             NATO

NATO SECURITY INVESTMENT            162,600       162,600   ............
 PROGRAM......................

     WORLDWIDE CLASSIFIED

ARMY:
    CLASSIFIED LOCATIONS:
        CLASSIFIED PROJECT....        4,000         4,000   ............
        RESCISSION CLASSIFIED   ............      -26,400       -26,400
         PROJECT..............
AIR FORCE: CLASSIFIED                 4,458         4,458   ............
 LOCATION: TACTICAL UNIT
 DETACHMENT FACILITY..........
DEFENSE-WIDE: CLASSIFIED              2,400         2,400   ............
 LOCATION: AVIATION AND
 MAINTENANCE FACILITY.........
                               -----------------------------------------
      TOTAL, WORLDWIDE               10,858       -15,542       -26,400
       CLASSIFIED.............

     WORLDWIDE UNSPECIFIED

ARMY:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        HOST NATION SUPPORT...       23,100        23,100   ............
        PLANNING AND DESIGN...      134,098       153,084       +18,986
        UNSPECIFIED MINOR            18,000        21,130        +3,130
         CONSTRUCTION.........
NAVY:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...       29,932        37,332        +7,400
        UPSPECIFIED MINOR            10,546        13,321        +2,775
         CONSTRUCTION.........
        RESCISSION............  ............      -19,588       -19,588
AIR FORCE:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...       79,130        83,420        +4,290
        UPSPECIFIED MINOR            11,250        12,250        +1,000
         CONSTRUCTION.........
        RESCISSION............  ............       -4,000        -4,000
DEFENSE-WIDE:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        ENERGY CONSERVATION          35,600        35,600   ............
         IMPROVEMENT PROGRAM..
        CONTINGENCY                  10,000        10,000   ............
         CONSTRUCTION.........
        RESCISSION............  ............      -65,280       -65,280
        RESCISSION............  ............       -4,000        -4,000
        PLANNING AND DESIGN;
            TRICARE MANAGEMENT       26,300        30,300        +4,000
             ACTIVITY.........
            SPECIAL OPERATIONS        6,861         6,861   ............
             COMMAND..........
            CHEMICAL AND                700           700   ............
             BIOLOGICAL
             DEFENSE PROGRAM..
            DEFENSE THREAT            2,400         2,400   ............
             REDUCTION AGENCY.
            DEPARTMENT OF             1,929         1,929   ............
             DEFENSE DEPENDENT
             EDUCATION........
            BALLISTIC MISSILE         6,290         6,290   ............
             DEFENSE
             ORGANIZATION.....
            DEFENSE                   6,516        16,516       +10,000
             INTELLIGENCE
             AGENCY...........
            DEFENSE LOGISTICS         3,500         3,500   ............
             AGENCY...........
            UNDISTRIBUTED.....       20,000        20,000   ............
                               -----------------------------------------
              SUBTOTAL,              74,496        88,496       +14,000
               PLANNING AND
               DESIGN.........
        UNSPECIFIED MINOR
         CONSTRUCTION:
            TRICARE MANAGEMENT        5,526         5,526   ............
             ACTIVITY.........
            SPECIAL OPERATIONS        1,903         1,903   ............
             COMMAND..........
            DEFENSE FINANCE           1,500         1,500   ............
             AND ACCOUNTING
             SERVICE..........
            DEPARTMENT OF             4,249         4,249   ............
             DEFENSE DEPENDENT
             EDUCATION........
            BALLISTIC MISSILE         2,009         2,009   ............
             DEFENSE
             ORGANIZATION.....
            JOINT CHIEFS OF           6,305         6,305   ............
             STAFF............
            UNDISTRIBUTED.....        3,000         3,000   ............
                               -----------------------------------------
              SUBTOTAL,              24,492        24,492   ............
               UNSPECIFIED
               MINOR
               CONSTRUCTION...
ARMY NATIONAL GUARD:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...       25,794        34,378        +8,584
        UNSPECIFIED MINOR             4,671        22,381       +17,710
         CONSTRUCTION.........
AIR NATIONAL GUARD:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...        3,972         7,342        +3,370
        UNSPECIFIED MINOR             5,000         8,425        +3,425
         CONSTRUCTION.........
ARMY RESERVE:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...        8,024         8,024   ............
        UNSPECIFIED MINOR             2,375         2,375   ............
         CONSTRUCTION.........
NAVY RESERVE:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...        1,176         1,176   ............
        RESCISSION............  ............         -925          -925
AIR FORCE RESERVE:
    UNSPECIFIED WORLDWIDE
     LOCATIONS:
        PLANNING AND DESIGN...        4,336         4,336   ............
        UNSPECIFIED MINOR             4,996         4,996   ............
         CONSTRUCTION.........
                               -----------------------------------------
          TOTAL, WORLDWIDE          510,988       501,865        -9,123
           UNSPECIFIED........

     FAMILY HOUSING, ARMY

ALASKA: FORT WAINWRIGHT (32          12,000        12,000   ............
 UNITS).......................
ARIZONA: FORT HUACHUCA (72           10,800        10,800   ............
 UNITS).......................
KANSAS: FORT LEAVENWORTH (80         10,000        20,000       +10,000
 UNITS).......................
TEXAS:
    FORT BLISS (76 UNITS).....       13,600        13,600   ............
    FORT SAM HOUSTON (80).....  ............       11,200       +11,200
KOREA: CAMP HUMPHREYS (54            12,800        12,800   ............
 UNITS).......................
CONSTRUCTION IMPROVEMENTS.....      220,750       220,750   ............
PLANNING AND DESIGN...........       11,592        11,592   ............
                               -----------------------------------------
      SUBTOTAL, CONSTRUCTION..      291,542       312,742       +21,200
OPERATION AND MAINTENANCE:
    FURNISHING ACCOUNT........       45,546        45,546   ............
    MANAGEMENT ACCOUNT........       82,177        82,177   ............
    MISCELLANEOUS ACCOUNT.....        1,277         1,277   ............
    SERVICES ACCOUNT..........       49,520        49,520   ............
    UTILITIES ACCOUNT.........      258,790       258,790   ............
    LEASING...................      196,956       196,956   ............
    MAINTENANCE OF REAL             446,806       446,806   ............
     PROPERTY.................
    INTEREST PAYMENT..........            1             1   ............
    HOUSING PRIVATIZATION            27,918        27,918   ............
     SUPPORT COST.............
    FOREIGN CURRENCY            ............  ............  ............
     FLUCTUATION ADJUSTMENT...
                               -----------------------------------------
      SUBTOTAL, OPERATION AND     1,108,991     1,108,991   ............
       MAINTENANCE............
                               -----------------------------------------
      TOTAL, FAMILY HOUSING,      1,400,533     1,421,733       +21,200
       ARMY...................

   FAMILY HOUSING, NAVY AND
         MARINE CORPS

ARIZONA: YUMA (51 UNITS)......        9,017         9,017   ............
CALIFORNIA: TWENTYNINE PALMS         16,250        16,250   ............
 (74 UNITS)...................
HAWAII:
    KANEOHE BAY (212 UNITS)...       46,996        55,196        +8,200
    PEARL HARBOR (70 UNITS)...       16,827        16,827   ............
MISSISSIPPI: PASCAGOULA (160         23,354        23,354   ............
 UNITS).......................
ITALY: SIGONELLA (10 UNITS)...        2,403         2,403   ............
CONSTRUCTION IMPROVEMENTS.....      183,054       183,054   ............
PLANNING AND DESIGN...........        6,499         6,499   ............
                               -----------------------------------------
      SUBTOTAL, CONSTRUCTION..      304,400       312,600        +8,200
OPERATION AND MAINTENANCE:
    FURNISHINGS ACCOUNT.......       32,701        32,701   ............
    MANAGEMENT ACCOUNT........       85,535        85,535   ............
    MISCELLANEOUS ACCOUNT.....        1,200         1,200   ............
    SERVICES ACCOUNT..........       65,787        65,787   ............
    UTILITIES ACCOUNT.........      195,172       195,172   ............
    LEASING ACCOUNT...........      123,965       123,965   ............
    MAINTENANCE ACCOUNT.......      409,567       409,567   ............
    SVCM'S MORTGAGE INSURANCE            68   ............
     PREMIUM ACCOUNT..........
    HOUSING PRIVATIZATION             4,100         4,100   ............
     SUPPORT COST.............
    FOREIGN CURRENCY            ............  ............  ............
     FLUCTUATION ADJUSTMENT...
                               -----------------------------------------
      SUBTOTAL, OPERATION AND       918,095       918,095   ............
       MAINTENANCE............
                               -----------------------------------------
      TOTAL, FAMILY HOUSING,      1,222,495     1,230,695        +8,200
       NAVY AND MARINE CORPS..

   FAMILY HOUSING, AIR FORCE

ARIZONA: LUKE AFB (120 UNITS).       15,712        15,712   ............
CALIFORNIA: TRAVIS AFB (118          18,150        18,150   ............
 UNITS).......................
COLORADO: BUCKLEY AFB (55            11,400        11,400   ............
 UNITS).......................
DELAWARE: DOVER AFB (120             18,145        18,145   ............
 UNITS).......................
DISTRICT OF COLUMBIA: BOLLING        16,926        16,926   ............
 AFB (136 UNITS)..............
HAWAII: HICKAM AFB (102 UNITS)       25,037        25,037   ............
IDAHO: MOUNTAIN HOME AFB (56    ............       10,000       +10,000
 UNITS).......................
LOUISIANA: BARKSDALE AFB (56          7,300         7,300   ............
 UNITS).......................
SOUTH DAKOTA: ELLSWORTH AFB          13,700        13,700   ............
 (78 UNITS)...................
VIRGINIA: LANGLEY AFB (4              1,200         1,200   ............
 UNITS).......................
PORTUGAL: LAJES FIELD (64            13,230        13,230   ............
 UNITS).......................
CONSTRUCTION IMPROVEMENTS.....      352,879       375,345       +22,466
PLANNING AND DESIGN...........       24,558        24,558   ............
                               -----------------------------------------
      SUBTOTAL, CONSTRUCTION..      518,237       550,703       +32,466
OPERATION AND MAINTENANCE:
    FURNISHINGS ACCOUNT.......       36,619        36,619   ............
    MANAGEMENT ACCOUNT........       58,224        58,224   ............
    SERVICES ACCOUNT..........       28,356        28,356   ............
    UTILITIES ACCOUNT.........      168,652       168,652   ............
    MISCELLANEOUS.............        2,384         2,384   ............
    LEASING...................      102,919       102,919   ............
    MAINTENANCE...............      436,526       436,526   ............
    MORTGAGE INSURANCE                   35            35   ............
     PREMIUMS.................
HOUSING PRIVATIZATION SUPPORT        35,406        35,406   ............
 COST.........................
    FOREIGN CURRENCY            ............  ............  ............
     FLUCTUATION ADJUSTMENT...
                               -----------------------------------------
      SUBTOTAL, OPERATION AND       869,121       869,121   ............
       MAINTENANCE............
                               -----------------------------------------
      TOTAL, FAMILY HOUSING,      1,387,358     1,419,824       +32,466
       AIR FORCE..............

 FAMILY HOUSING, DEFENSE-WIDE

CONSTRUCTION IMPROVEMENTS.....          250           250   ............
OPERATION AND MAINTENANCE:
    FURNISHINGS ACCOUNT (NSA).          129           129   ............
    FURNISHINGS ACCOUNT (DIA).        3,630         3,630   ............
    FURNISHINGS ACCOUNT (DLA).           30            30   ............
    MANAGEMENT ACCOUNT (NSA)..           15            15   ............
    MANAGEMENT ACCOUNT (DLA)..          292           292   ............
    MISCELLANEOUS ACCOUNT                57            57   ............
     (NSA)....................
    SERVICES ACCOUNT (NSA)....          374           374   ............
    SERVICES ACCOUNT (DLA)....           78            78   ............
    UTILITIES ACCOUNT (NSA)...          414           414   ............
    UTILITIES ACCOUNT (DLA)...          428           428   ............
    LEASING (NSA).............       11,698        11,698   ............
    LEASING (DLA).............       25,600        25,600   ............
    MAINTENANCE OF REAL                 658           658   ............
     PROPERTY (NSA)...........
    MAINTENANCE OF REAL                 359           359   ............
     PROPERTY (DLA)...........
                               -----------------------------------------
      SUBTOTAL, OPERATION AND        43,762        43,762   ............
       MAINTENANCE............
                               -----------------------------------------
      TOTAL, FAMILY HOUSING,         44,012        44,012   ............
       DEFENSE-WIDE...........

 DEPARTMENT OF DEFENSE FAMILY
   HOUSING IMPROVEMENT FUND

DEPARTMENT OF DEFENSE FAMILY          2,000         2,000   ............
 HOUSING IMPROVEMENT FUND.....

  HOMEOWNERS ASSISTANCE FUND,
            DEFENSE

HOMEOWNERS ASSISTANCE FUND,          10,119        10,119   ............
 DEFENSE......................

 BASE REALIGNMENT AND CLOSURE
       ACCOUNT, PART IV

BASE REALIGNMENT AND CLOSURE        532,200       682,200      +150,000
 ACCOUNT, PART IV.............
                               =========================================
      GRAND TOTAL.............    9,971,312    10,500,000      +528,688

        RECAPITULATION

ARMY..........................    1,760,541     1,668,957       -91,584
    RESCISSION................  ............      -26,400       -26,400
NAVY..........................    1,071,408     1,148,633       +77,225
    RESCISSION................  ............      -19,588       -19,588
AIR FORCE.....................    1,068,250     1,148,269       +80,019
    RESCISSION (GENERAL         ............       -4,000        -4,000
     PROVISION 126)...........
DEFENSE AGENCIES..............      694,558       881,058      +186,500
    RESCISSION................  ............      -65,280       -65,280
    RESCISSION (GENERAL         ............       -4,000        -4,000
     PROVISION 126)...........
ARMY NATIONAL GUARD...........      267,389       378,549      +111,160
AIR NATIONAL GUARD............      149,072       222,767       +73,695
ARMY RESERVE..................      111,404       111,404   ............
NAVAL RESERVE.................       33,641        33,641   ............
    RESCISSION................  ............         -925          -925
AIR FORCE RESERVE.............       53,732        53,732   ............
                               -----------------------------------------
      TOTAL MILITARY              5,209,995     5,526,817      +316,822
       CONSTRUCTION...........

NATO INFRASTRUCTURE...........      162,600       162,600   ............
FAMILY HOUSING, ARMY..........    1,400,533     1,421,733       +21,200
    (NEW CONSTRUCTION)........      (59,200)      (80,400)     (+21,200)
    (CONSTRUCTION                  (220,750)     (220,750)  ............
     IMPROVEMENTS)............
    (PLANNING AND DESIGN).....      (11,592)      (11,592)  ............
    (OPERATION AND               (1,108,991)   (1,108,991)  ............
     MAINTENANCE).............
FAMILY HOUSING, NAVY AND          1,222,495     1,230,695        +8,200
 MARINE CORPS.................
    (NEW CONSTRUCTION)........     (114,847)     (123,047)      (+8,200)
    (CONSTRUCTION                  (183,054)     (183,054)  ............
     IMPROVEMENTS)............
    (PLANNING AND DESIGN).....       (6,499)       (6,499)  ............
    (OPERATION AND                 (918,095)     (918,095)  ............
     MAINTENANCE).............
FAMILY HOUSING, AIR FORCE.....    1,387,358     1,419,824       +32,466
    (NEW CONSTRUCTION)........     (140,800)     (150,800)     (+10,000)
    (CONSTRUCTION                  (352,879)     (375,345)     (+22,466)
     IMPROVEMENTS)............
    (PLANNING AND DESIGN).....      (24,558)      (24,558)  ............
    (OPERATION AND                 (869,121)     (869,121)  ............
     MAINTENANCE).............
FAMILY HOUSING, DEFENSE              44,012        44,012   ............
 AGENCIES.....................
    (CONSTRUCTION                      (250)         (250)  ............
     IMPROVEMENTS)............
    (OPERATION AND                  (43,762)      (43,762)  ............
     MAINTENANCE).............
DEPARTMENT OF DEFENSE FAMILY          2,000         2,000   ............
 HOUSING IMPROVEMENT FUND.....
HOMEOWNERS ASSISTANCE FUND....       10,119        10,119   ............
BASE REALIGNMENT AND CLOSURE        532,200       682,200      +150,000
 ACCOUNT......................
                               =========================================
      GRAND TOTAL.............    9,971,312    10,500,000      +528,688
------------------------------------------------------------------------