[Federal Register Volume 61, Number 155 (Friday, August 9, 1996)]
[Notices]
[Pages 41607-41608]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-20380]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5472-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or (202) 564-7153. Weekly receipt of
Environmental Impact Statements Filed July 29, 1996 Through August 02,
1996 Pursuant to 40 CFR 1506.9.
EIS No. 960353, DRAFT EIS, FHW, PA, US 202 Section 700 Corridor,
Improvements from PA 63 in Montgomeryville to the PA-611 Bypass in
Doylestown Township, COE Section 404 Permit and Right-of-Way,
Montgomery and Bucks Counties, PA, Due: September 27, 1996, Contact:
Manuel A. Marks (717) 782-3461.
EIS No. 960354, FINAL EIS, NPS, AZ, CA, Programmatic EIS--Juan Bautista
de Anza National Historic Trail Comprehensive Management Plan,
Implementation, several counties, AZ and CA, Due: September 09, 1996,
Contact: Stanley T. Albright (415) 744-3876.
EIS No. 960355, FINAL EIS, BLM, WY, Grass Creek Resource Management
Plan, Implementation, Big Horn, Washakie, Hot Springs and Park
Counties, WY, Due: September 09, 1996, Contact: Joe Patty (307) 775-
6101.
EIS No. 960356, FINAL EIS, NPS, VA, Richmond National Battlefield Park
General Management Plan and Land Protection Plan, Implementation,
Hanover, Henrico and Chesterfield Counties, VA, Due: September 09,
1996, Contact: Cynthia Macleod (804) 226-1981.
EIS No. 960357, FINAL EIS, AFS, AK, King George Timber Sale Project,
Timber Harvesting and Road Construction, Implementation, Tongass
National Forest, Stikine Area, Etolin Island, AK, Due: September 09,
1996, Contact: Meg Mitchell (907) 874-2323.
EIS No. 960358, FINAL EIS, FHW, OK, Canadian River Bridge Crossing
Construction, OK-37 east of Tuttle northward to OK-152 in or near
Mustang, Funding, COE Section 404 and EPA NPDES Permits Issuance,
Canadian and Grady Cos. OK, Due: September 09, 1996, Contact: Pete
Lombard (817) 334-3646.
EIS No. 960359, DRAFT EIS, BLM, ID, Challis Land and Resource
Management Plan, Implementation, Upper Columbus-Salmon Clearwater
Districts, Salmon River, Lemhi and Custer Counties, ID, Due: November
21, 1996, Contact: Kathe Rhodes (208) 756-5440.
EIS No. 960360, FINAL EIS, AFS, OR, Foss Perkins Analysis Area,
Vegetation Management and Timber Sale, Ochoco National Forest, Snow
Mountain Ranger District, Harney County, OR, Due: September 09, 1996,
Contact: Bill Rice (541) 573-4300.
EIS No. 960361, DRAFT EIS, FHW, WI, US 12 Corridor Project, Improvement
from IH90/94 at Lake Delton south to Ski Hi Road, Funding and COE
Section 404 Permits, Sauk County, WI, Due: September 23, 1996, Contact:
Richard Madrzak (608) 829-7500.
EIS No. 960362, FINAL SUPPLEMENT, COE, MS, Mississippi River and
Tributaries Flood Control Plan, Big Sunflower River Maintenance
Project, Yazoo Basin, Sunflower, Washington, Humphreys, Sharkey and
Yazoo Counties, MS, Due: September 9, 1996, Contact: Marvin Cannon
(601) 631-5437.
EIS No. 960363, DRAFT EIS, CGD, Atlantic Protected Living Marine
Resource Initiative, Implementation, Atlantic Ocean, from Maine to
Florida, Due: September 16, 1996, Contact: Commander Rooth (202) 267-
1456. Under Section 1506.10(d) of the Council on Environmental Quality
Regulations For Implementing The Procedural Provisions of the National
Environmental Policy Act a 7-day Waiver of the Prescribed Period has
been Granted.
EIS No. 960364, DRAFT EIS, AFS, MT, Lewis and Clark National Forest
Plan, Implementation, Oil and Gas Leasing Analysis, Upper Missouri
River Basin, several counties, MT, Due: October 08, 1996, Contact:
Robin Strathy (406) 791-7726.
EIS No. 960365, DRAFT EIS, USN, ID, Naval Surface Warfare Center
(NSWC), Acoustic Research Detachment (ARD), Carderock Division (CD),
Capital Improvements Plan, Implementation, in the Town of Bayview,
Kootenai County, ID, Due: September 23, 1996, Contact: Peter W. Havens
(360) 396-0916.
EIS No. 960366, FINAL EIS, OSM, TN, Fern Lake Petition Area for Surface
Coal Mining Operations, Designation or Nondesignation as Unsuitable for
Coal Mining Operations, Claiborne County, TN, Due: September 09, 1996,
Contact: Sam K. Bae (202) 208-2633.
EIS No. 960367, DRAFT EIS, AFS, CA, Cavanah Multi-Resource Management
Project, Implementation, Enhancing Forest Health and Productivity,
Tahoe National Forest, Foresthill Ranger District, Placer County, CA,
Due: September 23, 1996, Contact: John Bradford (916) 478-6254.
EIS No. 960368, DRAFT EIS, NOA, WA, Programmatic EIS--Commencement Bay
Restoration Plan, Implementation, COE Section 10 and 404 Permits, CZMA
and NPDES Applications, Puget Sound, Pierce County, WA, Due: October
08, 1996, Contact: Judy Lantor (360) 753-6056.
Amended Notices
EIS No. 960217, LEGISLATIVE DRAFT EIS, AFS, CA, Tahoe National Forest
and Portions of Plumas and EL Dorado National Forests, Implementation,
Twenty-Two Westside Rivers for Suitability and inclusion in the
National Wild and Scenic Rivers System, Wild and Scenic River Study,
Placer, Nevada, Sierra, Plumas, EL Dorado and Yuba Counties, CA, Due:
August 09, 1996, Contact: Phil Horning (916) 478-6210. Published FR 05-
02-96--Review Period extended.
EIS No. 960289, DRAFT EIS, GSA, NY, US Brooklyn Court Project,
Demolition of the Emanuel Celler Federal Building, Construction of a
New Courthouse and Renovation/Adaptive Reuse of the General Post Office
at Cadman Plaza East, Kings County, NY, Due: August 27, 1996, Contact:
Peter A. Sneed (GSA) (212) 264-3581. Published FR 06-28-96--Review
Period Extended.
[[Page 41608]]
Dated: August 06, 1996.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 96-20380 Filed 8-08-96; 8:45 am]
BILLING CODE 6560-50-U