[Federal Register Volume 64, Number 15 (Monday, January 25, 1999)]
[Notices]
[Pages 3693-3697]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-1533]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. EG99-57-000, et al.]


Magellan Cogeneration, Inc., et al.; Electric Rate and Corporate 
Regulation Filings

January 15, 1999.
    Take notice that the following filings have been made with the 
Commission:

1. Magellan Cogeneration Inc.

[Docket No. EG99-57-000]

    On January 11, 1999, Magellan Cogeneration Inc. (MCI) filed with 
the Federal Energy Regulatory Commission (Commission) an Application 
for Determination of Exempt Wholesale Generator Status pursuant to Part 
365 of the Commission's regulations.
    MCI will acquire a 63 MW eligible facility located in Rosario, 
Cavite, the Philippines. MCI states that, following the close of the 
acquisition, it will be engaged directly and exclusively in the 
business of owning and/or operating all or part of an eligible facility 
(as defined in Section 32(a)(1) of the Public Utility Holding Company 
Act); selling electricity at wholesale to the National Power 
Corporation of the Philippines and at wholesale Cavite Export 
Processing Zone Authority, a government corporation operating under the 
laws of the Philippines; and, possibly, selling electricity at retail 
to customers none of which will be located within the United States.
    Comment date: February 5, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. San Diego Gas & Electric Company, Cabrillo Power I LLC, and 
Cabrillo Power II LLC

[Docket No. EC99-26-000]

    Take notice that on January 12, 1999, San Diego Gas & Electric 
Company (SDG&E), Cabrillo Power I LLC (Cabrillo I) and Cabrillo Power 
II LLC (Cabrillo II) tendered for filing pursuant to Section 203 of the 
Federal Power Act, an application for Commission approval to effect 
assign two jurisdictional Reliability Must-Run Agreements (the RMR 
Agreements). The RMR Agreements, between SDG&E and the California 
Independent System Operator Corporation relate to the operation of 
SDG&E's Encina Generating Station (the Encina station) and SDG&E, 
Cabrillo I and Cabrillo II have requested that the Commission approve 
the assignments on or before February 28, 1999.
    Comment date: February 11, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

3. California Independent System Operator Corporation

[Docket Nos. EC96-19-047 and ER96-1663-049]

    Take notice that on January 8, 1999, the California Independent 
System Operator Corporation tendered for filing amendments to its 
Bylaws in connection with the Commission's November 24, 1998 order, 85 
FERC para. 61,263 (1998).
    Copies of the filing were served upon all the parties in the above-
captioned proceedings.
    Comment date: February 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

4. Harbor Cogeneration Company

[Docket No. EG99-58-000]

    On January 13, 1999, Harbor Cogeneration Company filed with the 
Federal Energy Regulatory Commission an application for determination 
of exempt wholesale generator status pursuant to Part 365 of the 
Commission's regulations.
    Harbor Cogeneration is a general partnership formed under the laws 
of the State of California for the primary purpose of owning and 
operating a cogeneration facility located in the Wilmington Oil Field 
in Los Angeles County, California, near the city of Long Beach. The 
business offices of Harbor Cogeneration are located at 1075 Noel Road, 
Wheeling, Illinois.
    Comment date: February 5, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

[[Page 3694]]

5. Coastal Power Panama Investor, S.A.

[Docket No. EG99-59-000]

    Take notice that on January 13, 1999, Coastal Power Panama 
Investor, S.A. (Applicant), Dresdner Bank Tower, Ninth Floor, 50th 
Street, Panama City, P.O. Box 8376, Panama 7, Republic of Panama, filed 
with the Federal Energy Regulatory Commission an Application for 
Determination of Exempt Wholesale Generator Status pursuant to Part 365 
of the Commission's regulations.
    Applicant, a Panamanian sociedad anonima, intends to own beneficial 
interests in certain power generating facilities in Panama. These 
facilities will consist of approximately a 300 MW hydroelectric power 
generating facility in Chiriqui province, Panama.
    Comment date: February 5, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

6. Long Beach Generation LLC

[Docket No. ER98-2537-001]

    Take notice that on January 11, 1999, Long Beach Generation LLC 
(Long Beach), tendered for filing a supplement to the compliance refund 
report that it had filed for approval in the above-referenced docket on 
December 30, 1998.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

7. Storm Lake Power Partners II LLC

[Docket No. ER99-1228-000]

    Take notice that on January 11, 1999, Storm Lake Power Partners II 
LLC (Storm Lake II), tendered for filing its initial Rate Schedule FERC 
No. 2, governing sales of electric energy and capacity at market-based 
rates. The filing was made to replace the Application filed on January 
8, 1999 in the above-referenced docket. Storm Lake II is developing a 
wind-powered generation facility in Buena Vista County, Iowa. Following 
construction of the facility, Storm Lake II will make sales of capacity 
and energy at market-based rates to IES Utilities, Inc. (IES) pursuant 
to an Alternative Energy Production Electric Service Agreement (the 
Power Purchase Agreement or PPA).
    The PPA was originally executed by IES and Northern Alternative 
Energy Allendorf L.L.C. (NAEA) on May 14, 1997. NAEA assigned the PPA 
to Storm Lake II pursuant to an agreement dated November 19, 1998.
    Copies of the filing were served upon IES, Storm Lake II's 
jurisdictional customer.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

8. Carolina Power & Light Company

[Docket No. ER99-1230-000]

    Take notice that on January 11, 1999, Carolina Power & Light 
Company (CP&L), tendered for filing executed Service Agreements with 
South Carolina Public Service Authority and GPU Energy under the 
provisions of CP&L's Market-Based Rates Tariff, FERC Electric Tariff 
No. 4. These Service Agreements supersede the unexecuted Agreements 
originally filed in Docket No. ER98-3385-000 and approved effective May 
18, 1998.
    Copies of the filing were served upon the North Carolina Utilities 
Commission and the South Carolina Public Service Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

9. Western Resources, Inc.

[Docket No. ER99-1231-000]

    Take notice that on January 11, 1999, Western Resources, Inc., 
tendered for filing agreements between Western Resources and Aquila 
Power Corporation, ConAgra Energy Services, Inc., and Wisconsin 
Electric Power Company. Western Resources states that the purpose of 
the agreements is to permit the customers to take service under Western 
Resources' market-based power sales tariff on file with the Commission.
    The agreements are proposed to become effective December 17, 1998, 
January 1, 1999, and December 7, 1998.
    Copies of the filing were served upon Aquila Power Corporation, 
ConAgra Energy Services, Inc., Wisconsin Electric Power Company, and 
the Kansas Corporation Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

10. Wisconsin Electric Power Company

[Docket No. ER99-1232-000]

    Take notice that on January 11, 1999, Wisconsin Electric Power 
Company (Wisconsin Electric), tendered for filing an electric service 
agreement under its Market Rate Sales Tariff (FERC Electric Tariff, 
Original Volume No. 8) with New Energy Ventures, Inc.
    Wisconsin Electric respectfully requests an effective date of 
January 8, 1999, to allow for economic transactions.
    Copies of the filing have been served on New Energy Ventures, Inc., 
the Michigan Public Service Commission, and the Public Service 
Commission of Wisconsin.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

11. Allegheny Power Service Corp., on behalf of Monongahela Power 
Co., The Potomac Edison Company, and West Penn Power Company 
(Allegheny Power)

[Docket No. ER99-1233-000]

    Take notice that on January 11, 1999, Allegheny Power Service 
Corporation on behalf of Monongahela Power Company, The Potomac Edison 
Company and West Penn Power Company (Allegheny Power), tendered for 
filing Supplement No. 10-1, to add Allegheny Energy, DTE CoEnergy, DTE 
Edison America, Enserch Energy Services, Inc., Exelon Energy, First 
Energy Services, Green Mountain Energy Resources, L.L.C., New Energy 
Ventures, Nicole Energy Services, Penn Power Energy, Inc., PP&L 
EnergyPlus Company, PSEG Energy Technologies, Strategic Energy Ltd., 
West Penn Power Company, and Worley & Obetz, Inc., to Allegheny Power's 
Open Access Transmission Service Tariff.
    The proposed effective date under the agreements is January 1, 
1999.
    Copies of the filing have been provided to the Public Utilities 
Commission of Ohio, the Pennsylvania Public Utility Commission, the 
Maryland Public Service Commission, the Virginia State Corporation 
Commission, and the West Virginia Public Service Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

12. PECO Energy Company

[Docket No. ER99-1234-000]

    Take notice that on January 11, 1999, PECO Energy Company (PECO), 
tendered for filing under Section 205 of the Federal Power Act, 16 
U.S.C. S 792 et seq., an Agreement dated October 15, 1998 with 
Consolidated Edison Solutions, Inc. (Con Edison Solutions) under PECO's 
FERC Electric Tariff Original Volume No. 1 (Tariff).
    PECO requests an effective date of January 1, 1999, for the 
Agreement.
    PECO states that copies of this filing have been supplied to Con 
Edison Solutions and to the Pennsylvania Public Utility Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

[[Page 3695]]

13. PECO Energy Company

[Docket No. ER99-1235-000]

    Take notice that on January 11, 1999, PECO Energy Company (PECO) 
tendered for filing under Section 205 of the Federal Power Act, 16 
U.S.C. S 792 et seq., an Agreement dated November 20, 1998 with NEV 
East, L.L.C. (NEV East), under PECO's FERC Electric Tariff Original 
Volume No. 1 (Tariff).
    PECO requests an effective date of January 1, 1999, for the 
Agreement.
    PECO states that copies of this filing have been supplied to NEV 
East and to the Pennsylvania Public Utility Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

14. Florida Power Corporation

[Docket No. ER99-1236-000]

    Take notice that on January 11, 1999, Florida Power Corporation 
(Florida Power), tendered for filing a service agreement for Network 
Contract Demand Transmission Service and a Network Operating Agreement 
between itself and Seminole Electric Cooperative, Inc., pursuant to 
Florida Power's open access transmission tariff.
    Florida Power requests that the Commission waive its notice of 
filing requirements and allow the Service Agreement to become effective 
on January 1, 1999.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

15. Louisville Gas And Electric Co./Kentucky Utilities Company

[Docket No. ER99-1237-000]

    Take notice that on January 11, 1999, Louisville Gas and Electric 
Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
Service Agreement for Firm Point-To-Point Transmission Service between 
LG&E/KU and Strategic Energy Ltd., under LG&E/KU's Open Access 
Transmission Tariff.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

16. Louisville Gas And Electric Co. and Kentucky Utilities Company

[Docket No. ER99-1238-000]

    Take notice that on January 11, 1999, Louisville Gas and Electric 
Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
Service Agreement for Non-Firm Point-To-Point Transmission Service 
between LG&E/KU and Strategic Energy Ltd., under LG&E/KU's Open Access 
Transmission Tariff.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

17. Northern States Power Company (Minnesota) and Northern States 
Power Company and (Wisconsin)

[Docket No. ER99-1239-000]

    Take notice that on January 11, 1999, Northern States Power Company 
(Minnesota) and Northern States Power Company (Wisconsin) (jointly 
NSP), tendered for filing six Firm Point-to-Point Transmission Service 
Agreements between NSP and NSP Wholesale Energy Marketing.
    NSP requests that the Commission accept the six agreements 
effective January 1, 1999, and requests waiver of the Commission's 
notice requirements in order for the agreements to be accepted for 
filing on the date requested.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

18. Rochester Gas and Electric Corporation

[Docket No. ER99-1240-000]

    Take notice that on January 11, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
FPL Energy Services, Inc. (Transmission Customer), for service under 
RG&E's open access transmission tariff. Specifically dealing with the 
Retail ``Access Program'' under RG&E's open access transmission tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of January 1, 1999, for the FPL 
Energy Services, Inc., Service Agreement.
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

19. Rochester Gas and Electric Corporation

[Docket No. ER99-1241-000]

    Take notice that on January 11, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
FPL Energy Services, Inc. (Transmission Customer), for service under 
RG&E's open access transmission tariff. Specifically dealing with the 
``Pilot Retail Access Program'' under RG&E's open access transmission 
tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of January 1, 1999, for the FPL 
Energy Services, Inc., Service Agreement.
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

20. NP Energy Inc.

[Docket No. ER99-1242-000]

    Take notice that on January 11, 1999, NP Energy Inc. (NP Energy), a 
broker and marketer of electric power, filed a notice of change in 
status relating to an agreement for the acquisition by Duke Energy 
Trading and Marketing, L.L.C. (DETM), of all of the common stock of NP 
Energy Inc. NP Energy also filed a change in its rate schedule, 
precluding NP Energy from selling power to, or selling power purchased 
from, the franchised electric utility affiliates of DETM.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

21. PECO Energy Company

[Docket No. ER99-1243-000]

    Take notice that on January 12, 1999, PECO Energy Company (PECO), 
tendered for filing under Section 205 of the Federal Power Act, 16 
U.S.C. S 792 et seq., a Transaction Agreement dated November 19, 1998 
with Borough of Ephrata, Pennsylvania (Ephrata) under PECO's FERC 
Electric Tariff Original Volume No. 1 (Tariff).
    PECO requests an effective date of February 1, 1999, for the 
Agreement.
    PECO states that copies of this filing have been supplied to 
Middletown and to the Pennsylvania Public Utility Commission.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

22. PECO Energy Company

[Docket No. ER99-1244-000]

    Take notice that on January 12, 1999, PECO Energy Company (PECO), 
tendered for filing under Section 205 of the Federal Power Act, 16 
U.S.C. S 792 et seq., a Transaction Agreement dated December 22, 1998 
with Borough of Middletown, Pennsylvania (Middletown) under PECO's FERC 
Electric Tariff Original Volume No. 1 (Tariff).
    PECO requests an effective date of January 1, 1999, for the 
Agreement.
    PECO states that copies of this filing have been supplied to 
Middletown and

[[Page 3696]]

to the Pennsylvania Public Utility Commission.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

23. Allegheny Power Service Corp. on behalf of Monongahela Power 
Company, Potomac Edison Company and West Penn Power Company

[Docket No. ER99-1245-000]

    Take notice that on January 12, 1999, Allegheny Power Service 
Corporation (Allegheny Power), tendered for filing notice that the 
Allegheny Power's Pro Forma Open Access Transmission Service Tariff 
shall be amended as of the date of filing to conform to NERC's generic 
tariff amendment included as Attachment B in Docket No. EL99-52-000.
    Copies of the filing have been provided to the Public Utilities 
Commission of Ohio, the Pennsylvania Public Utility Commission, the 
Maryland Public Service Commission, the Virginia State Corporation 
Commission, the West Virginia Public Service Commission, and all 
parties of record.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

24. Ameren Services Company

[Docket No. ER99-1246-000]

    Take notice that on January 12, 1999, Ameren Services Company 
(Ameren), tendered for filing Service Agreements for Market Based Rate 
Power Sales between Ameren and American Municipal Power--Ohio, Inc., 
and El Paso Power Services Company. Ameren asserts that the purpose of 
the Agreements is to permit Ameren to make sales of capacity and energy 
at market based rates to the parties pursuant to Ameren's Market Based 
Rate Power Sales Tariff filed in Docket No. ER98-3285-000.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

25. Arizona Public Service Company

[Docket No. ER99-1247-000]

    Take notice that on January 12, 1999, Arizona Public Service 
Company (APS), tendered for filing Umbrella Service Agreements to 
provide Short-Term Firm Point-to-Point Transmission Service to Aquila 
Power Corporation and Public Service Company of New Mexico, and Short-
Term Firm and Non-Firm Point-to-Point Transmission Service to Merrill 
Lynch Capital Services, Inc., under APS' Open Access Transmission 
Tariff.
    A copy of this filing has been served on Aquila Power Corporation, 
Public Service Company of New Mexico, Merrill Lynch Capital Services, 
Inc., the Arizona Corporation Commission and the New Mexico Public 
Regulation Commission.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

26. Harbor Cogeneration Company

[Docket No. ER99-1248-000]

    Take notice that on January 12, 1999, Harbor Cogeneration Company 
(Harbor Cogeneration), tendered for filing an initial rate schedule to 
sell power and certain ancillary services at market-based rates and for 
certain waivers of the Commission's filing and reporting requirements.
    Harbor Cogeneration requests waiver of the 60-day notice 
requirement to permit the Harbor Cogeneration Rate Schedule to become 
effective as a rate schedule as of January 13, 1999.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

27. NGE Generation, Inc.

[Docket No. ER99-1249-000]

    Take notice that on January 11, 1999, NGE Generation, Inc. (NGE 
Gen), tendered for filing pursuant to Section 35.15 of the Federal 
Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR 
35.15, a notice of cancellation (Cancellation) of Rate Schedule FERC 
No. 35.6 (Rate Schedule) between NGE Gen and El Paso Energy Power 
Services Company (El Paso).
    NGE Gen requests that the Cancellation be deemed effective as of 
January 12, 1999. To the extent required to give effect to the 
Cancellation, NGE Gen requests waiver of the notice requirements 
pursuant to Section 35.15 of the Commission's Regulations, 18 CFR 
35.15.
    NGE Gen served copies of the filing upon the New York State Public 
Service Commission and El Paso.
    Comment date: January 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

28. Storm Lake Power Partners II LLC

[Docket No. ER99-1252-000]

    Take notice that on January 12, 1999, Storm Lake Power Partners II 
LLC (Storm Lake II), tendered for filing proposed changes to its Rate 
Schedule FERC No. 1. Storm Lake II is developing a wind-powered 
generation facility in Buena Vista and Cherokeye Counties, Iowa. 
Following construction of the facility, Storm Lake II will make sales 
of capacity and energy at market-based rates to IES Utilities, Inc. 
(IES), pursuant to an Alternative Energy Production Electric Services 
Agreement (the Power Purchase Agreement or PPA) that the Commission 
accepted for filing as Rate Schedule FERC No. 1 in Iowa Power Partners 
I, L.L.C., 81 FERC para. 61,058 (1997).
    The proposed rate schedule changes amend the PPA to reflect a 
decrease in the maximum quantity under the PPA from to 84.75 MW to 
75.75 MW, contingent upon the Commission's acceptance for filing of 
Storm Lake II's Rate Schedule FERC No. 2, which is pending in Docket 
No. ER99-1228 and to increase the rate under the PPA due to increased 
interconnection costs. Storm Lake II also filed an amendment to its 
interconnection agreement with IES.
    Copies of the filing were served upon IES, Storm Lake II's 
jurisdictional customer.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

29. MidAmerican Energy Company

[Docket No. ER99-1253-000]

    Take notice that on January 12, 1999, MidAmerican Energy Company 
(MidAmerican), 666 Grand Avenue, Des Moines, Iowa 50309, tendered for 
filing with the Commission a Firm Transmission Service Agreement with 
Ameren Services Company, dated December 14, 1998, and a Non-Firm 
Transmission Service Agreement with Ameren, dated December 14, 1998, 
entered into pursuant to MidAmerican's Open Access Transmission Tariff.
    MidAmerican requests an effective date of December 14, 1998, for 
the Agreements with Ameren, and accordingly seeks a waiver of the 
Commission's notice requirement.
    MidAmerican has served a copy of the filing on Ameren, the Iowa 
Utilities Board, the Illinois Commerce Commission and the South Dakota 
Public Utilities Commission.
    Comment date: February 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

30. Nevada Power Company

[Docket No. ER99-1265-000]

    Take notice that on January 8, 1998, Nevada Power Company (NPC), as 
one of the Operating Agents for the Navajo Project Western Transmission 
System, tendered for filing on behalf of the Navajo Project 
Participants the following amendments:

1. Amendment No. 5 to the Navajo Project Co-Tenancy Agreement

[[Page 3697]]

2. Amendment No. 1 to the Navajo Project Western Transmission System 
Operating Agreement

    These Amendments bring the Navajo Project Agreements up-to-date 
regarding the current ownership, cost responsibility and configuration 
of two Navajo Project facilities, namely the McCullough 500 kV 
Switchyard and the McCullough Substation Common Facilities.
    NPC requests an effective date no later than sixty (60) days after 
the date the Amendments are filed.
    A copy of this filing has been served on Arizona Public Service 
Company, the United States Bureau of Reclamation, Salt River Project 
Agricultural Improvement and Power District, the Department of Water 
and Power of the City of Los Angeles, Tucson Electric Power Company, 
the Arizona Corporation Commission, the Public Utilities Commission of 
Nevada, and the Bureau of Consumer Protection Utility Consumer's 
Advocate of Nevada.
    Comment date: January 28, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

Standard Paragraphs

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of these filings are on file with 
the Commission and are available for public inspection.
David P. Boergers,
Secretary.
[FR Doc. 99-1533 Filed 1-22-99; 8:45 am]
BILLING CODE 6717-01-P