[Federal Register Volume 64, Number 81 (Wednesday, April 28, 1999)]
[Notices]
[Pages 22858-22859]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-10589]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
to Intervene and Protests

April 22, 1999.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: P-11705-000.
    c. Date filed: March 15, 1999.
    d. Applicant: Universal Electric Power Corporation.
    e. Name of Project: Rome Dam Hydro Project.
    f. Location: At the existing Rome Dam located on the West Branch of 
Ausable

[[Page 22859]]

River, near the Town of Ausable Forks, Clinton and Essex Counties, New 
York.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Ronald S. Feltenberger, Universal 
Electric Power Corp., 1145 Highbrook Street, Akron, Ohio 44301, (330) 
535-7115.
    i. FERC Contact: Ed Lee (202) 2808 or E-mail address at 
[email protected].
    j. Deadline for filing motions to intervene and protest: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. Description of Project: The proposed run-of-river project would 
consist of the following facilities: (1) a 29-foot-high existing 
concrete dam; (2) a 150 acre-feet reservoir with pool elevation of 657 
feet msl; (3) four 80-foot-long steel penstocks; (4) a new powerhouse 
to be constructed on the downstream side of the dam housing four 
generating units for a total installed capacity of 7.75 megawatts; (5) 
a new 300-foot-long, 14.7-kilovolt transmission line; and (6) 
appurtenant facilities. The proposed average annual generation is 
estimated to be 46 gigawatt hours. The cost of the studies under the 
permit will not exceed $1,500,000.
    m. Available Locations at Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference and Files Maintenance Branch, located at 888 North Capitol 
Street, NE, Room 2-A, Washington, DC 20426, or by calling (202) 219-
1371. A copy is also available for inspection and reproduction at 
Universal Electric Power Corp., Mr. Ronald S. Feltenberger, 1145 
Highbrook Street, Akron, Ohio 44301, (330) 535-7115. A copy of the 
application may also be viewed or printed by accessing the Commission's 
website on the Internet at http://www.ferc.fed.us/online/rims.htm or 
call (202) 208-2222 for assistance.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    Preliminary Permit--Anyone desiring to file a competing application 
for preliminary permit for a proposed project must submit the competing 
application itself, or a notice of intent to file such an application, 
to the Commission on or before the specified comment date for the 
particular application (see 18 CFR 4.36). Submission of a timely notice 
of intent allows an interested person to file the competing preliminary 
permit application no later than 30 days after the specified comment 
date for the particular application. A competing preliminary permit 
application must conform with 18 CFR 4.32(a) and (b)(1).
    Preliminary Permit--Any qualified development applicant desiring to 
file a competing development application must submit to the Commission, 
on or before a specified comment date for the particular application, 
either a competing development application or a notice of intent to 
file such an application (see 18 CFR 4.36). Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.32(a) (b), and (c).
    Notice of Intent--A notice of intent must specify the exact name, 
business address, and telephone number of the prospective applicant, 
and must include an unequivocal statement of intent to submit, if such 
an application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to intervene must be received on or before the 
specified comment date for the particular application.
    Filing and Service of Responsive Documents--Any filings must bear 
in all capital letters the title ``COMMENT'', ``NOTICE OF INTENT TO 
FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'' ``PROTEST'', 
``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number 
of copies provided by the Commission's regulations to: The Secretary 
and an additional copy must be sent to Director, Division of Project 
Review, at the above-mentioned address. A copy of any notice of intent, 
competing application or motion to intervene must also be served upon 
each representative of the Applicant specified in the particular 
application.
    Agency Comments--Federal, state, and local agencies are invited to 
file comments on the described application. A copy of the application 
may be obtained by agencies directly from the Applicant. If an agency 
does not file comments within the time specified for filing comments, 
it will be presumed to have no comments. One copy of an agency's 
comments must also be sent to the Applicant's representatives.
David P. Boergers,
Secretary.
[FR Doc. 99-10589 Filed 4-27-99; 8:45 am]
BILLING CODE 6717-01-M