NUCLEAR REGULATORY COMMISSION
[Docket No. 50-293]
Entergy Nuclear Generation Company, Entergy Nuclear Operations,
Inc.; Notice of Partial Withdrawal of Application for Amendment to
Facility Operating License
The U.S. Nuclear Regulatory Commission (NRC or Commission) has
granted the request of Entergy Nuclear Operations, Inc. (the licensee),
to withdraw a portion of its January 23, 2003, application for
amendment to Facility Operating License No. DPR-35 for the Pilgrim
Nuclear Power Station, located in Plymouth County, Massachusetts. The
licensee's application was supplemented by letters dated February 24
and April 17, 2003.
The Commission had previously issued a Notice of Consideration of
Issuance of Amendment published in the Federal Register on March 18,
2003 (68 FR 12952). However, by letter dated April 17, 2003, the
licensee withdrew a portion of the original amendment request
pertaining to the proposed change to note (1) of Technical
Specification (TS) Table 3.2.B.
The Commission issued License Amendment No. 200 on April 22, 2003,
which revised the TSs pertaining to requirements for the emergency core
cooling system during shutdown conditions. The change modified the core
spray and low pressure injection system's TS requirements to be
applicable during the Run, Startup, and Hot Shutdown Modes. The change
also modified the high drywell pressure instrumentation TSs to require
the instrumentation to be Operable during the Run, Startup and Hot
Shutdown Modes. Unnecessary TS requirements were removed based on the
plant's operating Mode. Other changes were administrative in nature.
For further details with respect to this action, see the
application for amendment dated January 23, 2003, as supplemented
February 24, 2003; and the licensee's April 17, 2003, letter that
withdrew a portion of the application for license amendment. Documents
may be examined, and/or copied for a fee, at the NRC's Public Document
Room (PDR), located at One White Flint North,
[[Page 28301]]
Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. Publicly available records will be accessible electronically
from the Agencywide Documents Access and Management Systems (ADAMS)
Public Electronic Reading Room on the internet at the NRC Web site,
http://www.nrc.gov/reading-rm/adams/html. Persons who do not have
access to ADAMS, or who encounter problems in accessing the documents
located in ADAMS, should contact the NRC PDR reference staff by
telephone at 1-800-397-4209, or 301-415-4737, or by email to
[email protected].
Dated in Rockville, Maryland, this 19th day of May, 2003.
For the Nuclear Regulatory Commission.
Travis L. Tate,
Project Manager, Section 2, Project Directorate I, Division of
Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. 03-12972 Filed 5-22-03; 8:45 am]
BILLING CODE 7590-01-P