[Federal Register Volume 68, Number 112 (Wednesday, June 11, 2003)]
[Notices]
[Pages 35014-35015]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 03-14686]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Solicitation of Public Comments on Draft NMSS Policy and
Procedures Letter 1-82 and Backfit Guidance
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Notice of opportunity for comment.
-----------------------------------------------------------------------
SUMMARY: The NRC's Office of Nuclear Material Safety and Safeguards
(NMSS) has drafted guidance for the NRC staff on applying the backfit
requirements of 10 CFR part 70 to fuel cycle facilities. The draft
guidance is titled, NMSS Policy and Procedures Letter (P&PL) 1-82, ``10
CFR part 70 Backfit Guidance.'' The P&PL is now available for
stakeholder review and comment.
DATES: Written comments must be filed within 30 days of the publication
of this Federal Register notice. Comments received after this date will
be considered, however the Commission will only be able to ensure the
incorporation of comments received on or before this date.
[[Page 35015]]
Availability of Documents
A copy of this draft P&PL is available in the NRC's Agency-Wide
Document Access and Management System (ADAMS). This document can be
viewed by searching for ADAMS accession no. ML030730680. ADAMS is
accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html.
Comments should be clear and reproducible, and include name,
affiliation (as applicable) and address of sender. Comments on this
document must be sent to the Chief, Rules and Directives Branch, ADM,
U.S. NRC, Washington, DC, 20555, or may be hand-delivered to 11555
Rockville Pike, Rockville, Maryland, 20852, between the hours of 7:45
a.m. and 4:15 p.m. on Federal work-days. All comments will be made
available for public inspection in ADAMS and at the NRC headquarters
public document room (PDR). Following evaluation of the comments,
changes will be made to the final version of the P&PL and the guidance
published for NRC staff use. The draft P&PL is available to read and
copy for a fee at the NRC's PDR located at 11555 Rockville Pike,
Rockville, Maryland, 20852.
FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Mechanical Systems
Engineer, Office of Nuclear Materials Safety and Safeguards, U.S. NRC,
Mail Stop T8 A33, Washington, DC, 20555, or by e-mail at [email protected].
SUPPLEMENTARY INFORMATION: The purpose of the draft P&PL 1-82 is to
provide guidance to the NRC staff for implementing the backfit
provisions in 10 CFR 70.76. In this context, 10 CFR 70.76 will become
effective upon issuance of the final NMSS P&PL 1-82 for all Part 70
requirements, except for subpart H, and following NRC approval of a
licensee's ISA Summary, the requirements of 10 CFR 70.76 become
effective for Subpart H requirements.
The availability of this document is the latest step in an NRC
effort to improve the efficiency of the NRC's fuel cycle oversight
program and to enable open communications with stakeholders.
Dated at Rockville, Maryland, this 2nd day of June, 2003.
For the Nuclear Regulatory Commission.
Susan M. Frant,
Chief, Division of Fuel Cycle Safety and Safeguards, Office of Nuclear
Material Safety and Safeguards.
[FR Doc. 03-14686 Filed 6-10-03; 8:45 am]
BILLING CODE 7590-01-P