NUCLEAR REGULATORY COMMISSION
Programmatic Environmental Assessment and Final Finding of No
Significant Impact for Exemptions From the Implementation Deadline for
New Security Requirements
The U.S. Nuclear Regulatory Commission (NRC) has received and
expects to receive exemption requests from several nuclear power
reactor licensees. Each expected exemption request will be from the
implementation date requirement of Title 10 of the Code of Federal
Regulations (10 CFR) 73.55. The NRC is authorized to issue exemptions
pursuant to 10 CFR 73.5. In accordance with 10 CFR 51.21, the NRC has
performed a programmatic environmental assessment of these exemption
requests. The NRC concluded that the proposed action constitutes
administrative (timing) changes that would not impact the environmental
resources near any specified nuclear power plant. Based upon the
results of this programmatic environmental assessment, the NRC is
issuing a finding of no significant impact.
Environmental Assessment
Identification of the Proposed Action
The proposed action may include issuing exemptions to nuclear power
plant licensees for up to 40 nuclear power plant sites, all of which
have already been granted plant-specific exemptions granting additional
time to implement some of the new requirements of 10 CFR 73.55. These
sites are:
Arkansas Nuclear One, Units 1 and 2
Beaver Valley Power Station, Unit Nos. 1 and 2
Browns Ferry Nuclear Plant, Units 1, 2, and 3
Brunswick Steam Electric Station, Units 1 and 2
Columbia Generating Station
Cooper Nuclear Station
Crystal River Unit 3 Nuclear Generating Plant
Davis-Besse Nuclear Power Station, Unit No. 1
Diablo Canyon Power Plant, Unit Nos. 1 and 2
Edwin I. Hatch Nuclear Plant, Units 1 and 2
Fermi 2
Fort Calhoun Station, Unit 1
Grand Gulf Nuclear Station, Unit 1
H. B. Robinson Steam Electric Plant, Unit No. 2
Hope Creek Generating Station, Unit Nos. 1 and 2
Indian Point Nuclear Generating Unit Nos. 1, 2 and 3
James A. Fitzpatrick Nuclear Power Plant
Joseph M. Farley Nuclear Plant, Units 1 and 2
Millstone Power Station, Unit Nos. 1, 2, and 3
Monticello Nuclear Generating Plant
North Anna Power Station, Unit Nos. 1 and 2
Palisades Nuclear Plant
Palo Verde Nuclear Generating Station, Units 1, 2, and 3
Perry Nuclear Power Plant, Unit No. 1
Pilgrim Nuclear Power Station
Point Beach Nuclear Plant, Units 1 and 2
Prairie Island Nuclear Generating Plant, Units 1 and 2
Salem Nuclear Generating Station, Unit Nos. 1 and 2
San Onofre Nuclear Generating Station, Units 2 and 3
Seabrook Station, Unit No. 1
Sequoyah Nuclear Plant, Units 1 and 2
Shearon Harris Nuclear Power Plant, Unit 1
South Texas Project, Units 1 and 2
Surry Power Station, Unit Nos. 1 and 2
Susquehanna Steam Electric Station, Units 1 and 2
Vermont Yankee Nuclear Power Station
Virgil C. Summer Nuclear Station, Unit No. 1
Vogtle Electric Generating Plant, Units 1 and 2
Waterford Steam Electric Station, Unit 3
Watts Bar Nuclear Plant, Units 1 and 2
[[Page 188]]
Wolf Creek Generating Station
Specifically, the licensees for each of these plants may propose an
additional alternate date for full compliance beyond the March 31, 2010
date required by 10 CFR 73.55(a)(1), and if approved by the NRC, would
be granted a plant-specific exemption. The proposed action, an
exemption extending the schedule for completion of actions required by
the revised 10 CFR 73.55, would not involve any physical changes to the
reactor(s), fuel, plant structures, support structures, land, or water
at each nuclear power plant site. If granted, a plant-specific safety
evaluation will be included in the letter to the licensee approving the
exemption from the regulation.
The Need for the Proposed Action
The proposed action is needed to continue to exempt up to 40
nuclear power plant sites from being in full compliance with new
requirements contained in 10 CFR 73.55. The original implementation
date was March 31, 2010 and previous exemptions were granted to several
licensees from meeting that date. Another round of exemptions is needed
to provide these licensees with additional time to comply with the rule
requirements. While licensees completed much of the work required by
the 10 CFR 73.55 rule change at their plants by the March 31, 2010
implementation date, affected licensees require additional time to
complete all newly required modifications.
Environmental Impacts of the Proposed Action
The NRC regulation, 10 CFR 73.55, requires NRC nuclear power plant
licensees to implement various physical protection requirements to
prevent radiological sabotage. The NRC has completed its environmental
assessment of the proposed action, and has concluded that, should NRC
decide to grant a 10 CFR 73.55 compliance date exemption to these
plants, extending the implementation deadline would not significantly
affect plant safety and would not significantly affect the probability
of an accident.
The proposed action would not increase the radiological hazard
beyond what was analyzed in the environmental assessment and finding of
no significant impact made by the Commission in promulgating its
revisions to 10 CFR 73.55 as discussed in the Federal Register notice
dated March 27, 2009 (74 FR 13926). There would be no change to
radioactive effluents and emissions that would increase radiation
exposures to plant workers and members of the public. Therefore, no
radiological impacts are expected as a result of the proposed action.
In addition, there will be no construction or major renovation of
any buildings or structures, nor any ground disturbing activities
associated with an extension of the compliance deadline. Licensees
would not increase or decrease their workforce, nor is traffic to or
around any of the subject power plants expected to increase, as a
result of an extension of the compliance deadline. Therefore, providing
licensees with additional time to comply with the revised requirements
of 10 CFR 73.55 would not alter land use, air quality, and water use
(quality and quantity) conditions or National Pollutant Discharge
Elimination System permits at each of the nuclear power plants that may
be the subject of an exemption request. Aquatic and terrestrial habitat
in the vicinity of each power plant; threatened, endangered, and
protected species under the Endangered Species Act; and essential fish
habitat covered by the Magnuson-Stevens Act would not be affected. In
addition, historic and cultural resources, socioeconomic conditions,
and minority and low-income populations in the vicinity of each power
plant would also not be affected by this action.
As previously noted, in promulgating its amendments to 10 CFR part
73, the Commission prepared an environmental assessment of the rule
change and published a finding of no significant impact (10 CFR parts
50, 52, 72, and 73, Power Reactor Security Requirements, 74 FR 13926
(March 27, 2009)). Thus, through the proposed action, the Commission
would be granting additional time for the licensees to comply with
regulatory requirements for which the Commission has already found no
significant impact.
For the foregoing reasons, the NRC concludes that there would be no
significant radiological or non-radiological environmental impacts
associated with the extension of the implementation date of the new
requirements of 10 CFR 73.55.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the NRC considered denial
of the proposed actions (i.e., the ``no-action'' alternative). Denial
of the exemption requests would result in no change in current
environmental conditions at each of the nuclear power plants.
Denial of the exemption requests would result in the licensees
being in non-compliance with 10 CFR 73.55(a)(1) and thus, subject to
NRC enforcement action. The end result, however, would still be
ultimate licensee compliance with the requirements of 10 CFR 73.55, but
with the added expense to both the NRC and the licensees of any
enforcement actions. The NRC concludes that the environmental impacts
of the proposed exemption and the ``no action'' alternative are
similar.
Alternative Use of Resources
The proposed action does not involve the use of any different
resources than those considered in the final environmental statements
for the granting of the operating licenses for these nuclear power
plants and for those plants that have had their licenses renewed, in
NUREG-1437, ``Generic Environmental Impact Statement for License
Renewal of Nuclear Plants,'' published in May 1996, and its supplements
published from 1999 to the present.
Finding of No Significant Impact
On the basis of the above environmental assessment, which in
accordance with 10 CFR 51.32(a)(4), is incorporated into this finding
of no significant impact by reference, the NRC concludes that the
proposed action constitutes an administrative change (timing) that
would not have a significant effect on the quality of the human
environment. Accordingly, the NRC has determined not to prepare an
environmental impact statement for the proposed action.
Further details with respect to the proposed action will be
available as individual licensees request exemptions. Portions of these
requests may contain proprietary and safeguards information and,
accordingly, will not available to the public. Other parts of these
documents may be examined, and/or copied for a fee, at the NRC's Public
Document Room (PDR), located at One White Flint North, Public File Area
O-1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852.
Publicly available records will be accessible electronically from the
Agencywide Document Access and Management System (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site: http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems
in accessing the documents located in ADAMS should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or send
an e-mail to [email protected].
Dated at Rockville, Maryland, this 20th day of December 2010.
[[Page 189]]
For the Nuclear Regulatory Commission.
Robert J. Pascarelli,
Chief, Plant Licensing Branch III-1, Division of Operating Reactor
Licensing, Office of Nuclear Reactor Regulation.