[Federal Register Volume 76, Number 40 (Tuesday, March 1, 2011)]
[Notices]
[Pages 11291-11297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-4509]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-443; NRC-2011-0044]


NextEra Energy Seabrook, LLC; Seabrook Station Unit No. 1; Notice 
of Consideration of Issuance of Amendment to Facility Operating 
License, Proposed No Significant Hazards Consideration Determination, 
Opportunity for a Hearing, and Order Imposing Procedures for Document 
Access to Sensitive Unclassified Non-Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of license amendment request, opportunity to comment, 
opportunity to request a hearing, and Commission order.

-----------------------------------------------------------------------

DATES: Submit comments by March 31, 2011. A request for a hearing must 
be filed by May 2, 2011. Any potential party as defined in 10 CFR 2.4 
who believes access to Sensitive Unclassified Non-Safeguards 
Information and/or Safeguards Information is necessary to respond to 
this notice must request document access by March 11, 2011.

ADDRESSES: Please include Docket ID NRC-2011-0044 in the subject line 
of your comments. Comments submitted in writing or in electronic form 
will be posted on the NRC Web site and on the Federal rulemaking Web 
site http://www.regulations.gov. Because your comments will not be 
edited to remove any identifying or contact information, the NRC 
cautions you against including any information in your submission that 
you do not want to be publicly disclosed.
    The NRC requests that any party soliciting or aggregating comments 
received from other persons for submission to the NRC inform those 
persons that the NRC will not edit their comments to remove any 
identifying or contact information, and therefore, they should not 
include any information in their comments that they do not want 
publicly disclosed.

[[Page 11292]]

    You may submit comments by any one of the following methods.
    Federal rulemaking Web site: Go to http://www.regulations.gov and 
search for documents filed under Docket ID NRC-2011-0044. Address 
questions about NRC dockets to Carol Gallagher 301-492-3668; e-mail 
[email protected].
    Mail comments to: Chief, Rules, Announcements and Directives Branch 
(RADB), Office of Administration, Mail Stop: TWB-05-B01M, U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001, or by fax to RADB at 
301-492-3446.
    You can access publicly available documents related to this notice 
using the following methods:
    NRC's Public Document Room (PDR): The public may examine, and have 
copied for a fee, publicly available documents at the NRC's PDR, Room 
O1 F21, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland 20852. These documents may also be viewed electronically on 
the public computers located at the NRC's PDR at 11555 Rockville Pike, 
Rockville, Maryland 20852.
    NRC's Agencywide Documents Access and Management System (ADAMS): 
Publicly available documents created or received at the NRC are 
available electronically at the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain 
entry into ADAMS, which provides text and image files of NRC's public 
documents. If you do not have access to ADAMS or if there are problems 
in accessing the documents located in ADAMS, contact the NRC's PDR 
reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to 
[email protected]. The application for amendment, dated January 27, 
2011 is available electronically under ADAMS Accession No. ML110330202, 
however, the application for amendment, refers to and relies upon 
proprietary information previously submitted to the NRC and, 
accordingly, that information is withheld from public disclosure.
    Federal rulemaking Web site: Public comments and supporting 
materials related to this notice can be found at http://www.regulations.gov by searching on Docket ID: NRC-2011-0044.

FOR FURTHER INFORMATION CONTACT: G. Edward Miller, Project Manager, 
Plant Licensing Branch I-2, Division of Operating Reactor Licensing, 
Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555. Telephone: 301-415-2481; fax number: 
301-415-2102; e-mail: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of an amendment to Facility Operating License No. 
NPF-86 issued to NextEra Energy Seabrook, LLC (NextEra or the licensee) 
for operation of the Seabrook Station, Unit No. 1 located in Rockingham 
County, New Hampshire.
    The proposed amendment would revise Technical Specifications (TSs) 
related to the Steam Generators (SGs). Specifically, the proposed 
amendment would modify TS 6.7.6.k, ``Steam Generator,'' and TS 6.8.1.7, 
``Steam Generator Tube Inspection Report,'' to allow implementation of 
alternate repair criteria.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and the Commission's regulations.
    The Commission has made a proposed determination that the amendment 
request involves no significant hazards consideration. Under the 
Commission's regulations in Title 10 of the Code of Federal Regulations 
(10 CFR), 50.92, this means that operation of the facility in 
accordance with the proposed amendment would not (1) Involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. The proposed changes do not involve a significant increase in 
the probability or consequences of an accident previously evaluated.
    Response: No.
    The previously analyzed accidents are initiated by the failure 
of plant structures, systems, or components. The proposed change 
that alters the SG inspection and reporting criteria does not have a 
detrimental impact on the integrity of any plant structure, system, 
or component that initiates an analyzed event. The proposed change 
will not alter the operation of, or otherwise increase the failure 
probability of any plant equipment that initiates an analyzed 
accident.
    Of the applicable accidents previously evaluated, the limiting 
transients with consideration to the proposed change to the SG tube 
inspection and repair criteria are the steam generator tube rupture 
(SGTR) event, the steam line break (SLB), and the feed line break 
(FLB) postulated accidents.
    During the SGRT event, the required structural integrity margins 
of the SG tubes and the tube-to-tubesheet joint over the H* distance 
will be maintained. Tube rupture in tubes with in tubes with cracks 
within the tubesheet is precluded by the constraint provided by the 
presence of the tubesheet and the tube-to-tubesheet joint. Tube 
burst cannot occur within the thickness of the tubesheet. The tube-
to-tubesheet joint constraint results from the hydraulic expansion 
process, thermal expansion mismatch between the tube and tubesheet, 
and from the differential pressure between the primary and secondary 
side, and tubesheet rotation. Based on this design, the structural 
margins against burst, as discussed in Regulatory Guide (RG) 1.121, 
``Bases for Plugging Degraded PWR [Pressurized-Water Reactor] Steam 
Generator Tubes,'' and Technical Specification 6.7.6.k, are 
maintained for both normal and postulated accident conditions.
    The proposed change has no impact on the structural or leakage 
integrity of the portion of the tube outside of the tubesheet. The 
proposed change maintains structural and leakage integrity of the SG 
tubes consistent with the performance criteria of TS 6.7.6.k. 
Therefore, the proposed change results in no significant increase in 
the probability of the occurrence of a SGTR accident.
    At normal operating pressures, leakage from tube degradation 
below the proposed limited inspection depth is limited by the tube-
to-tubesheet crevice. Consequently, negligible normal operating 
leakage is expected from degradation below the inspected depth 
within the tubesheet region. The consequences of an SGTR event are 
not affected by the primary-to-secondary leakage flow during the 
event as primary-to-secondary leakage flow through a postulated tube 
that has been pulled out of the tubesheet is essentially equivalent 
to a severed tube.
    Therefore, the proposed change does not result in a significant 
increase in the consequences of a SGTR.
    The consequences of a SLB are also not significantly affected by 
the proposed changes. During a SLB accident, the reduction in 
pressure above the tubesheet on the shell side of the steam 
generator creates an axially uniformly distributed load on the 
tubesheet due to the reactor coolant system pressure on the 
underside of the tubesheet. The resulting bending action constrains 
the tubes in the tubesheet thereby restricting primary-to-secondary 
leakage below the midplane.
    Primary-to-secondary leakage from tube degradation in the 
tubesheet area during the limiting accident (i.e., a SLB) is limited 
by flow restrictions. These restrictions result from the crack and 
tube-to-tubesheet contact pressures that provide a restricted 
leakage path above the indications and also limit the degree of 
potential crack face opening as compared to free span indications.
    The leakage factor of 2.50 for Seabrook Station, for a 
postulated SLB/FLB, has been calculated as shown in Table 9-7 of 
Reference 10 [Proprietary Version, ADAMS Accession No. ML092650371, 
Non-

[[Page 11293]]

Proprietary Version, ADAMS Accession No. ML092650370]. For the 
condition monitoring assessment, the component of leakage from the 
prior cycle from below the H* distance will be multiplied by a 
factor of 2.50 and added to the total leakage from any other source 
and compared to the allowable accident induced leakage limit. For 
the operational assessment, the difference in the leakage between 
the allowable leakage and the accident induced leakage from sources 
other than the tubesheet expansion region will be divided by 2.50 
and compared to the observed operational leakage.
    The probability of a SLB is unaffected by the potential failure 
of a steam generator tube as the failure of the tube is not an 
initiator for a SLB event. SLB leakage is limited by leakage flow 
restrictions resulting from the leakage path above potential cracks 
through the tube-to-tubesheet crevice. The leak rate during 
postulated accident conditions (including locked rotor) has been 
shown to remain within the accident analysis assumptions for all 
axial and or circumferentially oriented cracks occurring 15.2 inches 
below the top of the tubesheet. The assumed accident induced leak 
rate for Seabrook Station is 500 gallons per day (gpd) during a 
postulated steam line break in the faulted loop. Using the limiting 
leak rate factor of 2.50, this corresponds to an acceptable level of 
operational leakage of 200 gpd. Therefore, the TS leak rate limit of 
150 gpd provides significant added margin against the 500 gpd 
accident analysis leak rate assumption.
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequence of an accident previously 
evaluated.
    2. The proposed changes do not create the possibility of a new 
or different kind of accident from any previously evaluated.
    Response: No.
    The proposed change that alters the SG inspection and reporting 
criteria does not introduce any new equipment, create new failure 
modes for existing equipment, or create any new limiting single 
failures. Plant operation will not be altered, and all safety 
functions will continue to perform as previously assumed in accident 
analyses.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any previously 
evaluated.
    3. The proposed changes do not involve a significant reduction 
in the margin of safety.
    Response: No.
    The proposed change that alters the SG inspection and reporting 
criteria maintains the required structural margins of the SG tubes 
for both normal and accident conditions. Nuclear Energy Institute 
97-06, Rev. 2 ``Steam Generator Program Guidelines,'' and NRC 
Regulatory Guide (RG) 1.121, ``Bases for Plugging Degraded PWR Steam 
Generator Tubes,'' are used as the bases in the development of the 
limited hot leg tubesheet inspection depth methodology for 
determining that SG tube integrity considerations are maintained 
within acceptable limits. RG 1.121 describes a method acceptable to 
the NRC for meeting General Design Criterion (GDC) 14, ``Reactor 
Coolant Pressure Boundary,'' GDC 15, ``Reactor Coolant System 
Design,'' GDC 31, ``Fracture Prevention of Reactor Coolant Pressure 
Boundary,'' and GDC 32, ``Inspection of Reactor Coolant Pressure 
Boundary,'' by reducing the probability and consequences of a SGTR. 
RG 1.121 concludes that by determining the limiting safe conditions 
for tube wall degradation, the probability and consequences of a 
SGTR are reduced. This RG uses safety factors on loads for tube 
burst that are consistent with the requirements of Section III of 
the American Society of Mechanical Engineers (ASME) Code.
    For axially oriented cracking located within the tubesheet, tube 
burst is precluded due to the presence of the tubesheet. For 
circumferentially oriented cracking, Westinghouse WCAP-17071-P 
defines a length of degradation-free expanded tubing that provides 
the necessary resistance to tube pullout due to the pressure induced 
forces, with applicable safety factors applied. Application of the 
limited hot and cold leg tubesheet inspection criteria will preclude 
unacceptable primary-to-secondary leakage during all plant 
conditions. The methodology for determining leakage as described in 
WCAP-17071-P provides significant margin between the accident-
induced leakage assumption and the technical specification leakage 
limit during normal operating conditions when the proposed limited 
tubesheet inspection depth criteria is implemented.
    Therefore, the proposed change does not involve a significant 
reduction in any margin of safety.

    The NRC staff has reviewed the licensee's analysis, as modified 
above. Based on this review, it appears that the three standards of 10 
CFR 50.92(c) are satisfied. Therefore, the NRC staff proposes to 
determine that the amendment request involves no significant hazards 
consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received by March 31, 2011 will be 
considered in making any final determination. You may submit comments 
using any of the methods discussed under the ADDRESSES caption.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example, in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.

II. Opportunity To Request a Hearing

    Requirements for hearing requests and petitions for leave to 
intervene are found in 10 CFR 2.309, ``Hearing requests, petitions to 
intervene, requirements for standing, and contentions.'' Interested 
persons should consult 10 CFR part 2, section 2.309, which is available 
at the NRC's Public Document Room (PDR), located at O1 F21, One White 
Flint North, 11555 Rockville Pike, Rockville, MD 20852 (or call the PDR 
at 800-397-4209 or 301-415-4737). NRC regulations are also accessible 
electronically from the NRC's Electronic Reading Room on the NRC Web 
site at http://www.nrc.gov.

III. Petitions for Leave To Intervene

    Any person whose interest may be affected by this proceeding and 
who wishes to participate as a party in the proceeding must file a 
written petition for leave to intervene. As required by 10 CFR 2.309, a 
petition for leave to intervene shall set forth with particularity the 
interest of the requestor/petitioner in the proceeding and how that 
interest may be affected by the results of the proceeding. The petition 
must provide the name, address, and telephone number of the requestor 
or petitioner and specifically explain the reasons why the intervention 
should be permitted with particular reference to the following factors: 
(1) The nature of the requestor's/petitioner's right under the Act to 
be made a party to the proceeding; (2) the nature and extent of the 
requestor's/petitioner's property, financial, or other interest in the 
proceeding; and (3) the possible effect of any decision or order which 
may be entered in the proceeding on the requestor's/petitioner's 
interest. The petition must also identify the specific contentions 
which the requestor/petitioner seeks to have litigated at the 
proceeding.
    A petition for leave to intervene must also include a specification 
of the contentions that the petitioner seeks to have litigated in the 
hearing. For each contention, the requestor/petitioner must provide a 
specific statement of the issue of law or fact to be raised or 
controverted, as well as a brief explanation of the basis for the

[[Page 11294]]

contention. Additionally, the requestor/petitioner must demonstrate 
that the issue raised by each contention is within the scope of the 
proceeding and is material to the findings the NRC must make to support 
the granting of a license amendment in response to the application. The 
petition must include a concise statement of the alleged facts or 
expert opinions which support the position of the requestor/petitioner 
and on which the requestor/petitioner intends to rely at hearing, 
together with references to the specific sources and documents on which 
the requestor/petitioner intends to rely. Finally, the petition must 
provide sufficient information to show that a genuine dispute exists 
with the applicant on a material issue of law or fact, including 
references to specific portions of the application for amendment that 
the requestor/petitioner disputes and the supporting reasons for each 
dispute, or, if the requestor/petitioner believes that the application 
for amendment fails to contain information on a relevant matter as 
required by law, the identification of each failure and the supporting 
reasons for the requestor's/petitioner's belief. Each contention must 
be one which, if proven, would entitle the requestor/petitioner to 
relief.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions, including the opportunity to present evidence and to 
submit a cross-examination plan for cross-examination of witnesses, 
consistent with NRC regulations, policies, and procedures. The 
Licensing Board will set the time and place for any prehearing 
conferences and evidentiary hearings, and the appropriate notices will 
be provided.
    Non-timely petitions for leave to intervene and contentions, 
amended petitions, and supplemental petitions will not be entertained 
absent a determination by the Commission, the Licensing Board or a 
Presiding Officer that the petition should be granted and/or the 
contentions should be admitted based upon a balancing of the factors 
specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A State, county, municipality, Federally-recognized Indian Tribe, 
or agencies thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(d)(2). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission by May 
2, 2011. The petition must be filed in accordance with the filing 
instructions in section IV of this document, and should meet the 
requirements for petitions for leave to intervene set forth in this 
section, except that State and Federally-recognized Indian tribes do 
not need to address the standing requirements in 10 CFR 2.309(d)(1) if 
the facility is located within its boundaries. The entities listed 
above could also seek to participate in a hearing as a nonparty 
pursuant to 10 CFR 2.315(c).
    Any person who does not wish, or is not qualified, to become a 
party to this proceeding may request permission to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
position on the issues, but may not otherwise participate in the 
proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to such limits and 
conditions as may be imposed by the Licensing Board. Persons desiring 
to make a limited appearance are requested to inform the Secretary of 
the Commission by May 2, 2011.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, any hearing held 
would take place before the issuance of any amendment.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the Internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by e-mail at 
[email protected], or by telephone at 301-415-1677, to request (1) 
a digital ID certificate, which allows the participant (or its counsel 
or representative) to digitally sign documents and access the E-
Submittal server for any proceeding in which it is participating; and 
(2) advise the Secretary that the participant will be submitting a 
request or petition for hearing (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in NRC's ``Guidance for Electronic 
Submission,'' which is available on the agency's public Web site at 
http://www.nrc.gov/site-help/e-submittals.html. Participants may 
attempt to use other software not listed on the Web site, but should 
note that the NRC's E-Filing system does not support unlisted software, 
and the NRC Meta System Help Desk will not be able to offer assistance 
in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through EIE, users will be required to install a Web 
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser 
plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance

[[Page 11295]]

available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
E-Filing system also distributes an e-mail notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at 
[email protected], or by a toll-free call at 866-672-7640. The NRC 
Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern 
Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) first-class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/EHD, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from March 1, 2011. Non-timely filings will not be entertained 
absent a determination by the presiding officer that the petition or 
request should be granted or the contentions should be admitted, based 
on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-
(viii).
    Attorney for licensee: M.S. Ross, Florida Power & Light Company, 
P.O. Box 14000, Juno Beach, FL 33408-0420.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation.

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication will not be considered 
absent a showing of good cause for the late filing, addressing why the 
request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail 
address for the Office of the Secretary and the Office of the General 
Counsel are [email protected] and [email protected], 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1);
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention;
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may

[[Page 11296]]

include, but are not limited to, the signing of a Non-Disclosure 
Agreement or Affidavit, or Protective Order \2\ setting forth terms and 
conditions to prevent the unauthorized or inadvertent disclosure of 
SUNSI by each individual who will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
either after a determination on standing and need for access, or after 
a determination on trustworthiness and reliability, the NRC staff shall 
immediately notify the requestor in writing, briefly stating the reason 
or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 23rd day of February 2011.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

   ATTACHMENT 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in this Proceeding
------------------------------------------------------------------------
             Day                             Event/Activity
------------------------------------------------------------------------
0............................  Publication of Federal Register notice of
                                hearing and opportunity to petition for
                                leave to intervene, including order with
                                instructions for access requests.
10...........................  Deadline for submitting requests for
                                access to Sensitive Unclassified Non-
                                Safeguards Information (SUNSI) with
                                information: Supporting the standing of
                                a potential party identified by name and
                                address; describing the need for the
                                information in order for the potential
                                party to participate meaningfully in an
                                adjudicatory proceeding.
60...........................  Deadline for submitting petition for
                                intervention containing: (i)
                                Demonstration of standing; (ii) all
                                contentions whose formulation does not
                                require access to SUNSI (+25 Answers to
                                petition for intervention; +7 requestor/
                                petitioner reply).
20...........................  Nuclear Regulatory Commission (NRC) staff
                                informs the requestor of the staff's
                                determination whether the request for
                                access provides a reasonable basis to
                                believe standing can be established and
                                shows need for SUNSI. (NRC staff also
                                informs any party to the proceeding
                                whose interest independent of the
                                proceeding would be harmed by the
                                release of the information.) If NRC
                                staff makes the finding of need for
                                SUNSI and likelihood of standing, NRC
                                staff begins document processing
                                (preparation of redactions or review of
                                redacted documents).
25...........................  If NRC staff finds no ``need'' or no
                                likelihood of standing, the deadline for
                                requestor/petitioner to file a motion
                                seeking a ruling to reverse the NRC
                                staff's denial of access; NRC staff
                                files copy of access determination with
                                the presiding officer (or Chief
                                Administrative Judge or other designated
                                officer, as appropriate). If NRC staff
                                finds ``need'' for SUNSI, the deadline
                                for any party to the proceeding whose
                                interest independent of the proceeding
                                would be harmed by the release of the
                                information to file a motion seeking a
                                ruling to reverse the NRC staff's grant
                                of access.
30...........................  Deadline for NRC staff reply to motions
                                to reverse NRC staff determination(s).
40...........................  (Receipt +30) If NRC staff finds standing
                                and need for SUNSI, deadline for NRC
                                staff to complete information processing
                                and file motion for Protective Order and
                                draft Non-Disclosure Affidavit. Deadline
                                for applicant/licensee to file Non-
                                Disclosure Agreement for SUNSI.
A............................  If access granted: Issuance of presiding
                                officer or other designated officer
                                decision on motion for protective order
                                for access to sensitive information
                                (including schedule for providing access
                                and submission of contentions) or
                                decision reversing a final adverse
                                determination by the NRC staff.
A + 3........................  Deadline for filing executed Non-
                                Disclosure Affidavits. Access provided
                                to SUNSI consistent with decision
                                issuing the protective order.

[[Page 11297]]

 
A + 28.......................  Deadline for submission of contentions
                                whose development depends upon access to
                                SUNSI. However, if more than 25 days
                                remain between the petitioner's receipt
                                of (or access to) the information and
                                the deadline for filing all other
                                contentions (as established in the
                                notice of hearing or opportunity for
                                hearing), the petitioner may file its
                                SUNSI contentions by that later
                                deadline.
A + 53.......................  (Contention receipt +25) Answers to
                                contentions whose development depends
                                upon access to SUNSI.
A + 60.......................  (Answer receipt +7) Petitioner/Intervenor
                                reply to answers.
>A + 60......................  Decision on contention admission.
------------------------------------------------------------------------

[FR Doc. 2011-4509 Filed 2-28-11; 8:45 am]