NUCLEAR REGULATORY COMMISSION

[NRC-2011-0138]


Applications and Amendments to Facility Operating Licenses 
Involving Proposed No Significant Hazards Considerations and Containing 
Sensitive Unclassified Non-Safeguards Information and Order Imposing 
Procedures for Access to Sensitive Unclassified Non-Safeguards 
Information

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of license amendment request, opportunity to comment, 
opportunity to request a hearing.

-----------------------------------------------------------------------

DATES: Comments must be filed by August 4, 2011. A request for a 
hearing must be filed by September 6, 2011. Any potential party as 
defined in Title 10 of the Code of Federal Regulations (10 CFR), 2.4 
who believes access to Sensitive Unclassified Non-Safeguards 
Information (SUNSI) is necessary to respond to this notice must request 
document access by July 15, 2011.

ADDRESSES: Please include Docket ID NRC-2011-0138 in the subject line 
of your comments. Comments submitted in writing or in electronic form 
will be posted on the NRC Web site and on the Federal rulemaking Web 
site, http://www.regulations.gov. Because your comments will not be 
edited to remove any identifying or contact information, the NRC 
cautions you against including any information in your submission that 
you do not want to be publicly disclosed.
    The NRC requests that any party soliciting or aggregating comments 
received from other persons for submission to the NRC inform those 
persons that the NRC will not edit their comments to remove any 
identifying or contact information, and therefore, they should not 
include any information in their comments that they do not want 
publicly disclosed.
    You may submit comments by any one of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0138. Address questions about NRC dockets to Carol Gallagher, 
telephone: 301-492-3668; e-mail: [email protected].
     Mail comments to: Cindy Bladey, Chief, Rules, 
Announcements, and Directives Branch (RADB), Office of Administration, 
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
     Fax comments to: RADB at 301-492-3446.
    You can access publicly available documents related to this notice 
using the following methods:
     NRC's Public Document Room (PDR): The public may examine 
and have copied, for a fee, publicly available documents at the NRC's 
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, 
Rockville, Maryland 20852.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): Publicly available documents created or received at the NRC 
are available online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, 
which provides text and image files of the NRC's public documents. If 
you do not have access to ADAMS or if there are problems in accessing 
the documents located in ADAMS, contact the NRC's PDR reference staff 
at 1-800-397-4209, 301-415-4737, or by e-mail to [email protected].
     Federal Rulemaking Web site: Public comments and 
supporting materials related to this notice can be found at http://www.regulations.gov by

[[Page 39137]]

searching on Docket ID NRC-2011-0138.

Background

    Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the U.S. Nuclear Regulatory Commission (the 
Commission, NRC, or NRC staff) is publishing this notice. The Act 
requires the Commission to publish notice of any amendments issued, or 
proposed to be issued and grants the Commission the authority to issue 
and make immediately effective any amendment to an operating license 
upon a determination by the Commission that such amendment involves no 
significant hazards consideration, notwithstanding the pendency before 
the Commission of a request for a hearing from any person.
    This notice includes notices of amendments containing SUNSI.

Notice of Consideration of Issuance of Amendments to Facility Operating 
Licenses, Proposed No Significant Hazards Consideration Determination, 
and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment requests involve no significant hazards consideration. Under 
the Commission's regulations in 10 CFR 50.92, this means that operation 
of the facility in accordance with the proposed amendment would not (1) 
Involve a significant increase in the probability or consequences of an 
accident previously evaluated; (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. The basis 
for this proposed determination for each amendment request is shown 
below.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.
    Within 60 days after the date of publication of this notice, any 
person(s) whose interest may be affected by this action may file a 
request for a hearing and a petition to intervene with respect to 
issuance of the amendment to the subject facility operating license. 
Requests for a hearing and a petition for leave to intervene shall be 
filed in accordance with the Commission's ``Rules of Practice for 
Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s) 
should consult a current copy of 10 CFR 2.309, which is available at 
the NRC's PDR, located at One White Flint North, Room O1-F21, 11555 
Rockville Pike (first floor), Rockville, Maryland 20852. The NRC 
regulations are accessible electronically from the NRC Library on the 
NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/. If 
a request for a hearing or petition for leave to intervene is filed 
within 60 days, the Commission or a presiding officer designated by the 
Commission or by the Chief Administrative Judge of the Atomic Safety 
and Licensing Board Panel, will rule on the request and/or petition; 
and the Secretary or the Chief Administrative Judge of the Atomic 
Safety and Licensing Board will issue a notice of a hearing or an 
appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address, and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the requestor's/petitioner's interest. The petition must 
also set forth the specific contentions which the requestor/petitioner 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
requestor/petitioner shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing. 
The requestor/petitioner must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
requestor/petitioner intends to rely to establish those facts or expert 
opinion. The petition must include sufficient information to show that 
a genuine dispute exists with the applicant on a material issue of law 
or fact. Contentions shall be limited to matters within the scope of 
the amendment under consideration. The contention must be one which, if 
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to decide when the hearing is held. If the final determination is that 
the amendment request involves no significant hazards consideration, 
the Commission may issue the amendment and make it immediately 
effective, notwithstanding the request for a hearing. Any hearing held 
would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, then any hearing held would take place before 
the issuance of any amendment.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested

[[Page 39138]]

governmental entities participating under 10 CFR 2.315(c), must be 
filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 
2007). The E-Filing process requires participants to submit and serve 
all adjudicatory documents over the internet, or in some cases to mail 
copies on electronic storage media. Participants may not submit paper 
copies of their filings unless they seek an exemption in accordance 
with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by e-mail at [email protected], or by 
telephone at 301-415-1677, to request (1) A digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the agency's public Web 
site at http://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through Electronic Information Exchange System, users 
will be required to install a Web browser plug-in from the NRC Web 
site. Further information on the Web-based submission form, including 
the installation of the Web browser plug-in, is available on the NRC's 
public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with the NRC guidance 
available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
E-Filing system also distributes an e-mail notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by e-mail at 
[email protected], or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
http://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Non-timely filings 
will not be entertained absent a determination by the presiding officer 
that the petition or request should be granted or the contentions 
should be admitted, based on a balancing of the factors specified in 10 
CFR 2.309(c)(1)(i)-(viii).
    For further details with respect to this amendment action, see the 
application for amendment which is available for public inspection at 
the NRC's PDR, located at One White Flint North, Room O1-F21, 11555 
Rockville Pike (first floor), Rockville, Maryland 20852. Publicly 
available documents created or received at the NRC are accessible 
electronically through ADAMS in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there 
are problems in accessing the documents located in ADAMS, contact the 
PDR Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to 
[email protected].

[[Page 39139]]

Dominion Nuclear Connecticut Inc., et al., Docket No. 50-423, Millstone 
Power Station, Unit 3, New London County, Connecticut

    Date of amendment request: January 20, 2011.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The 
amendment would revise the Millstone Power Station, Unit No. 3 (MPS3) 
Technical Specification (TS) 6.8.4.g, ``Steam Generator (SG) Program,'' 
to exclude a portion of the tubes below the top of the steam generator 
tubesheet from periodic steam generator tube inspections during 
Refueling Outage 14 and the subsequent operating cycle. The amendment 
request would also revise the reporting criteria in MPS3 TS 6.9.1.7, 
``Steam Generator Tube Inspection Report,'' to remove reference to 
previous one-time alternate repair criteria and add reporting 
requirements specific to temporary alternate repair criteria.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below, along with NRC edits noted in 
square brackets:

    (1) Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The previously analyzed accidents are initiated by the failure 
of plant structures, systems, or components. The proposed change 
that alters the steam generator inspection criteria and the steam 
generator inspection reporting criteria does not have a detrimental 
impact on the integrity of any plant structure, system, or component 
that initiates an analyzed event. The proposed change will not alter 
the operation of, or otherwise increase the failure probability of 
any plant equipment that initiates an analyzed accident.
    Of the applicable accidents previously evaluated, the limiting 
transients with consideration to the proposed change to the steam 
generator tube inspection and repair criteria are the steam 
generator tube rupture (SGTR) event and the feedline break (FLB) 
postulated accidents.
    During the SGTR event, the required structural integrity margins 
of the steam generator tubes and the tube-to-tubesheet joint over 
the H* distance will be maintained. Tube rupture in tubes with 
cracks within the tubesheet is precluded by the constraint provided 
by the tube-to-tubesheet joint. This constraint results from the 
hydraulic expansion process, thermal expansion mismatch between the 
tube and tubesheet, and from the differential pressure between the 
primary and secondary side. Based on this design, the structural 
margins against burst, as discussed in Regulatory Guide (RG) 1.121, 
``Bases for Plugging Degraded PWR Steam Generator Tubes,'' 
(Reference 25 [in the January 20, 2011, letter]) are maintained for 
both normal and postulated accident conditions.
    The proposed change has no impact on the structural or leakage 
integrity of the portion of the tube outside of the tubesheet. The 
proposed change maintains structural integrity of the steam 
generator tubes and does not affect other systems, structures, 
components, or operational features. Therefore, the proposed change 
results in no significant increase in the probability of the 
occurrence of a SGTR accident.
    At normal operating pressures, leakage from primary water stress 
corrosion cracking below the proposed limited inspection depth is 
limited by both the tube-to-tubesheet crevice and the limited crack 
opening permitted by the tubesheet constraint. Consequently, 
negligible normal operating leakage is expected from cracks within 
the tubesheet region. The consequences of an SGTR event are affected 
by the primary-to-secondary leakage flow during the event. However, 
primary-to-secondary leakage flow through a postulated broken tube 
is not affected by the proposed changes since the tubesheet enhances 
the tube integrity in the region of the hydraulic expansion by 
precluding tube deformation beyond its initial hydraulically 
expanded outside diameter.
    Therefore, the proposed changes do not result in a significant 
increase in the consequences of a SGTR.
    The consequences of a steam line break (SLB) are also not 
significantly affected by the proposed changes. During a SLB 
accident, the reduction in pressure above the tubesheet on the shell 
side of the steam generator creates an axially uniformly distributed 
load on the tubesheet due to the reactor coolant system pressure on 
the underside of the tubesheet. The resulting bending action 
constrains the tubes in the tubesheet thereby restricting primary-
to-secondary leakage below the mid-plane.
    Primary-to-secondary leakage from tube degradation in the 
tubesheet area during the limiting accident (i.e., a SLB) is limited 
by flow restrictions. These restrictions result from the crack and 
tube-to-tubesheet contact pressures that provide a restricted 
leakage path above the indications and also limit the degree of 
potential crack face opening as compared to free span indications.
    The leakage factor of 2.49 for Millstone Power Station Unit 3 
(MPS3), for a postulated SLB/FLB, has been calculated as shown in 
Table RA124-2 (Revised Table 9-7) of Reference 19 [in the January 
20, 2011, letter]. Specifically, for the condition monitoring (CM) 
assessment, the component of leakage from the prior cycle from below 
the H* distance will be multiplied by a factor of 2.49 and added to 
the total leakage from any other source and compared to the 
allowable accident induced leakage limit. For the operational 
assessment (OA), the difference in the leakage between the allowable 
leakage and the accident induced leakage from sources other than the 
tubesheet expansion region will be divided by 2.49 and compared to 
the observed operational leakage.
    The probability of a SLB is unaffected by the potential failure 
of a steam generator tube as the failure of the tube is not an 
initiator for a SLB event. SLB leakage is limited by leakage flow 
restrictions resulting from the leakage path above potential cracks 
through the tube-to-tubesheet crevice. The leak rate during 
postulated accident conditions (including locked rotor) has been 
shown to remain within the accident analysis assumptions for all 
axial and or circumferentially orientated cracks occurring 15.2 
inches below the top of the tubesheet. The accident induced leak 
rate limit is 1.0 gpm [gallon per minute]. The TS operational leak 
rate is 150 gpd [gallon per day] (0.1 gpm) through any one steam 
generator. Consequently, there is significant margin between 
accident leakage and allowable operational leakage. The SLB/FLB leak 
rate ratio is only 2.49 resulting in significant margin between the 
conservatively estimated accident leakage and the allowable accident 
leakage (1.0 gpm).
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    (2) Does the change create the possibility of a new or different 
kind of accident from any accident previously evaluated?
    Response: No
    The proposed change that alters the steam generator inspection 
criteria and the steam generator inspection reporting criteria does 
not introduce any new equipment, create new failure modes for 
existing equipment, or create any new limiting single failures. 
Plant operation will not be altered, and all safety functions will 
continue to perform as previously assumed in accident analyses.
    Therefore, the proposed change does not create the possibility 
of a new or different kind of accident from any accident previously 
evaluated.
    (3) Does the change involve a significant reduction in a margin 
of safety?
    Response: No.
    The proposed change that alters the steam generator inspection 
criteria and the steam generator inspection reporting criteria 
maintains the required structural margins of the steam generator 
tubes for both normal and accident conditions. NEI 97-06, Revision 
2, ``Steam Generator Program Guidelines'' (Reference 1 [in the 
January 20, 2011, letter]) and RG 1.121, ``Bases for Plugging 
Degraded PWR Steam Generator Tubes'' (Reference 25 [in the January 
20, 2011, letter]), are used as the bases in the development of the 
limited tubesheet [in the January 20, 2011, letter] inspection depth 
methodology for determining that steam generator tube integrity 
considerations are maintained within acceptable limits. RG 1.121 
describes a method acceptable to the Nuclear Regulatory Commission 
for meeting GDC 14, ``Reactor Coolant Pressure Boundary,'' GDC 15, 
``Reactor Coolant System Design,'' GDC 31, ``Fracture Prevention of 
Reactor Coolant Pressure Boundary,'' and GDC 32, ``Inspection of 
Reactor Coolant Pressure Boundary,'' by reducing the probability and 
consequences of a SGTR. This RG uses safety factors on loads for 
tube burst that are consistent with the requirements of Section

[[Page 39140]]

III of the American Society of Mechanical Engineers (ASME) Code.
    For axially oriented cracking located within the tubesheet, tube 
burst is precluded due to the presence of the tubesheet. For 
circumferentially oriented cracking, the H* analysis, documented in 
Section 4 of this license amendment request, defines the length of 
degradation-free, expanded tubing that provides the necessary 
resistance to tube pullout due to the pressure induced forces, with 
applicable safety factors applied. Application of the limited hot 
and cold leg tubesheet inspection criteria will preclude 
unacceptable primary-to-secondary leakage during all plant 
conditions. The methodology for determining leakage provides for 
large margins between calculated and actual leakage values in the 
proposed limited tubesheet inspection depth criteria.
    Therefore, the proposed change does not involve a significant 
reduction in any margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    Attorney for licensee: Lillian M. Cuoco, Senior Counsel, Dominion 
Resource Services, Inc., 120 Tredegar Street, RS-2, Richmond, VA 23219.
    NRC Branch Chief: Harold K. Chernoff.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

Dominion Nuclear Connecticut Inc., et al., Docket No. 50-423, Millstone 
Power Station, Unit 3, New London County, Connecticut

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication will not be considered 
absent a showing of good cause for the late filing, addressing why the 
request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail 
address for the Office of the Secretary and the Office of the General 
Counsel are [email protected] and [email protected], 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1);
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention;
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
either after a determination on standing and need for access, or after 
a determination on trustworthiness and reliability, the NRC staff shall 
immediately notify the requestor in writing, briefly stating the reason 
or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether

[[Page 39141]]

granting or denying access) is governed by 10 CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 23rd day of June, 2011.

    For the Nuclear Regulatory Commission.
Andrew L. Bates,
Acting Secretary of the Commission.

Attachment 1--General Target Schedule for Processing and Resolving 
Requests for Access to Sensitive Unclassified Non-Safeguards 
Information in This Proceeding

------------------------------------------------------------------------
             Day                             Event/Activity
------------------------------------------------------------------------
0............................  Publication of Federal Register notice of
                                hearing and opportunity to petition for
                                leave to intervene, including order with
                                instructions for access requests.
10...........................  Deadline for submitting requests for
                                access to Sensitive Unclassified Non-
                                Safeguards Information (SUNSI) with
                                information: supporting the standing of
                                a potential party identified by name and
                                address; describing the need for the
                                information in order for the potential
                                party to participate meaningfully in an
                                adjudicatory proceeding.
60...........................  Deadline for submitting petition for
                                intervention containing: (i)
                                Demonstration of standing; (ii) all
                                contentions whose formulation does not
                                require access to SUNSI (+25 Answers to
                                petition for intervention; +7 requestor/
                                petitioner reply).
20...........................  Nuclear Regulatory Commission (NRC) staff
                                informs the requestor of the staff's
                                determination whether the request for
                                access provides a reasonable basis to
                                believe standing can be established and
                                shows need for SUNSI. (NRC staff also
                                informs any party to the proceeding
                                whose interest independent of the
                                proceeding would be harmed by the
                                release of the information.) If NRC
                                staff makes the finding of need for
                                SUNSI and likelihood of standing, NRC
                                staff begins document processing
                                (preparation of redactions or review of
                                redacted documents).
25...........................  If NRC staff finds no ``need'' or no
                                likelihood of standing, the deadline for
                                requestor/petitioner to file a motion
                                seeking a ruling to reverse the NRC
                                staff's denial of access; NRC staff
                                files copy of access determination with
                                the presiding officer (or Chief
                                Administrative Judge or other designated
                                officer, as appropriate). If NRC staff
                                finds ``need'' for SUNSI, the deadline
                                for any party to the proceeding whose
                                interest independent of the proceeding
                                would be harmed by the release of the
                                information to file a motion seeking a
                                ruling to reverse the NRC staff's grant
                                of access.
30...........................  Deadline for NRC staff reply to motions
                                to reverse NRC staff determination(s).
40...........................  (Receipt +30) If NRC staff finds standing
                                and need for SUNSI, deadline for NRC
                                staff to complete information processing
                                and file motion for Protective Order and
                                draft Non-Disclosure Affidavit. Deadline
                                for applicant/licensee to file Non-
                                Disclosure Agreement for SUNSI.
A............................  If access granted: Issuance of presiding
                                officer or other designated officer
                                decision on motion for protective order
                                for access to sensitive information
                                (including schedule for providing access
                                and submission of contentions) or
                                decision reversing a final adverse
                                determination by the NRC staff.
A + 3........................  Deadline for filing executed Non-
                                Disclosure Affidavits. Access provided
                                to SUNSI consistent with decision
                                issuing the protective order.
A + 28.......................  Deadline for submission of contentions
                                whose development depends upon access to
                                SUNSI. However, if more than 25 days
                                remain between the petitioner's receipt
                                of (or access to) the information and
                                the deadline for filing all other
                                contentions (as established in the
                                notice of hearing or opportunity for
                                hearing), the petitioner may file its
                                SUNSI contentions by that later
                                deadline.
A + 53.......................  (Contention receipt +25) Answers to
                                contentions whose development depends
                                upon access to SUNSI.
A + 60.......................  (Answer receipt +7) Petitioner/Intervenor
                                reply to answers.
>A + 60......................  Decision on contention admission.
------------------------------------------------------------------------