[Federal Register Volume 80, Number 108 (Friday, June 5, 2015)]
[Notices]
[Pages 32184-32185]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-13810]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 70-3103; NRC-2010-0264]
Louisiana Energy Services, URENCO USA Facility
AGENCY: Nuclear Regulatory Commission.
ACTION: Inspection reports; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
conducted inspections of the Louisiana Energy Services, LLC, URENCO USA
(UUSA) Facility in Eunice, New Mexico, and has authorized the Uranium
Byproduct Cylinder Storage Pad Crane for use with non-enriched uranic
material; the introduction of uranium hexafluoride (UF6)
into cascades 5.1, 5.2, 5.3, 5.4, 5.5, 5.6, and 5.7; and the
commencement of UF6 re-feed operations in cascades 5.1
through 5.7 in Separation Building Module-1005.
DATES: June 5, 2015.
ADDRESSES: Please refer to Docket ID NRC-2010-0264 when contacting the
NRC about the availability of information regarding this document. You
may access publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2010-0264. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. For
the convenience of the reader, the ADAMS accession numbers are provided
in a table in the ``Availability of Documents'' section of this
document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Tilda Liu, Office of Nuclear Material
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001; telephone: 404-997-4730; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Further Information
The NRC staff has prepared inspection reports documenting its
findings in accordance with the requirements of the NRC's Inspection
Manual, and these reports are available for review as specified in
Section II of this notice. The publication of this notice satisfies the
requirements of Section 70.32(k) of Title 10 of the Code of Federal
Regulations (10 CFR), and Section 193(c) of the Atomic Energy Act of
1954, as amended.
The introduction of UF6 into any separation building
module (SBM) at the UUSA uranium enrichment facility is not permitted
until the NRC
[[Page 32185]]
completes an operational readiness and management measures verification
review, to verify that management measures that ensure compliance with
the performance requirements of 10 CFR 70.61 have been implemented, and
confirms that the SBM has been constructed in accordance with the
license and will be operated safely. Subsequent operational readiness
and management measures verification reviews will continue throughout
the planned future phases of construction and, upon completion of these
subsequent phases, additional notices of the operation approval letters
will be published in the Federal Register in accordance with 10 CFR
70.32(k).
II. Availability of Documents
The authorization letters and inspection reports identified in the
following table are available to interested persons.
NRC Authorization Letters
------------------------------------------------------------------------
Authorization letters Date ADAMS accession No.
------------------------------------------------------------------------
Cascade 5.1.................... February 6, 2015. ML15037A054
Uranium Byproduct Cylinder February 19, 2015 ML15050A282
Storage Pad Crane.
Cascade 5.2.................... February 20, 2015 ML15051A028
Cascade 5.3.................... March 2, 2015.... ML15063A003
Cascade 5.4.................... March 12, 2015... ML15071A364
Cascade 5.5.................... April 7, 2015.... ML15097A278
Re-Feed Operations in Cascades April 9, 2015.... ML15099A487
5.1 through 5.5.
Cascade 5.6.................... April 29, 2015... ML15119A189
Cascade 5.7 and Re-Feed May 26, 2015..... ML15146A123
Operations.
------------------------------------------------------------------------
NRC Inspection Reports
------------------------------------------------------------------------
Inspection Report No. Date ADAMS accession No.
------------------------------------------------------------------------
2014-005....................... January 29, 2015. ML15029A031
2015-002....................... April 21, 2015... ML15111A280
2015-006....................... February 27, 2015 ML15058A712
------------------------------------------------------------------------
Dated at Rockville, Maryland, this 26th day of May, 2015.
For the Nuclear Regulatory Commission.
Thomas A. Grice,
Acting Chief, Enrichment and Conversion Branch, Division of Fuel Cycle
Safety, Safeguards, and Environmental Review, Office of Nuclear
Material Safety, and Safeguards.
[FR Doc. 2015-13810 Filed 6-4-15; 8:45 am]
BILLING CODE 7590-01-P