NUCLEAR REGULATORY COMMISSION

[NRC-2014-0184]


Chilled Water System

AGENCY: Nuclear Regulatory Commission.

ACTION: Standard review plan-final section; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
final revision to Section 9.2.7, ``Chilled Water System,'' of NUREG-
0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis 
Reports for Nuclear Power Plants: LWR Edition.''

DATES: The effective date of this Standard Review Plan update is 
October 26, 2015.

ADDRESSES: Please refer to Docket ID NRC-2014-0184 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2014-0184. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it available in 
ADAMS) is provided the first time that a document is referenced. The 
final revision for the SRP, Section 9.2.7, ``Chilled Water System,'' is 
available in ADAMS under Accession No. ML15103A559. A redline strikeout 
comparing the proposed and final revision of the document can be found 
in ADAMS under Accession No. ML14328A622.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     The NRC posts its issued staff guidance on the NRC's 
external Web page (http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/).

FOR FURTHER INFORMATION CONTACT: Mark Notich, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, 
telephone: 301-415-6256, email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Background

    On August 5, 2014 (79 FR 45498), the NRC published for public 
comment the proposed SRP Section 9.2.7, ``Chilled Water,'' in Chapter 
9, ``Auxiliary Systems,'' of NUREG-0800. The NRC staff received 
comments on the draft section. After consideration of comments received 
on the proposed revision, the NRC staff reformatted guidance for the 
review of nonsafety-related structures, systems, and components (SSCs) 
into a tabular format, and separated it from the core review guidance 
used for review of safety-related SSCs. A summary of comments received 
and the staff's disposition of the comments are available in a separate 
document, ``Response to Public Comments on Draft Standard Review Plan, 
Section 9.2.7, ``Chilled Water System,'' (ADAMS Accession No. 
ML14328A663).

II. Backfitting and Issue Finality

    The SRP Section 9.2.7, provides guidance to the staff for reviewing 
applications for a construction permit and an operating license under 
part 50 of Title 10 of the Code of Federal Regulations (10 CFR), with 
respect to systems associated with chilled water. The SRP Section 9.2.7 
also provides guidance for reviewing an application for a standard 
design approval, a standard design certification, a combined license, 
and a manufacturing license under 10 CFR part 52 with respect to the 
same subject matters.
    Issuance of this SRP section revision does not constitute 
backfitting as defined in 10 CFR 50.109 (the Backfit Rule) nor is it 
inconsistent with the issue finality provisions in 10 CFR part 52. The 
NRC's position is based upon the following considerations:
    1. The SRP positions would not constitute backfitting, inasmuch as 
the SRP is internal guidance to NRC staff.
    The SRP provides internal guidance to the NRC staff on how to 
review an application for NRC regulatory approval in the form of 
licensing. Changes in internal staff guidance are not matters for which 
either nuclear power plant applicants or licensees are protected under 
either the Backfit Rule or the issue finality provisions of 10 CFR part 
52.
    2. The NRC staff has no intention to impose the SRP positions on 
existing licensees either now or in the future.
    The NRC staff does not intend to impose or apply the positions 
described in the SRP to existing licenses and regulatory approvals. 
Hence, the issuance of this SRP--even if considered guidance within the 
purview of the issue finality provisions in 10 CFR part 52--does not 
need to be evaluated as if it were a backfit or as being inconsistent 
with issue finality provisions. If, in the future, the NRC staff seeks 
to impose a position in the SRP on holders of already issued licenses 
in a manner that does not provide issue finality as described in the 
applicable issue finality provision, then the staff must make the 
showing as set forth in the Backfit Rule or address the criteria for 
avoiding issue finality as described in the applicable issue finality 
provision.
    3. Backfitting and issue finality do not--with limited exceptions 
not applicable here--protect current or future applicants.
    Applicants and potential applicants are not, with certain 
exceptions, protected by either the Backfit Rule or any issue finality 
provisions under 10 CFR part 52. Neither the Backfit Rule nor the issue 
finality provisions under 10 CFR part 52--with certain exclusions--were 
intended to apply to every NRC action that substantially changes the 
expectations of current and future applicants.
    The exceptions to the general principle are applicable whenever an 
applicant references a 10 CFR part 52 license (e.g., an early site 
permit) or NRC regulatory approval (e.g., a design certification rule) 
with specified issue finality provisions. The NRC staff does not, at 
this time, intend to impose the positions represented in the SRP in a 
manner that is inconsistent with any issue finality provisions. If, in 
the future, the staff seeks to impose a position in the SRP section in 
a manner that does not provide issue finality as described in the 
applicable issue finality

[[Page 57884]]

provision, then the staff must address the criteria for avoiding issue 
finality as described in the applicable issue finality provision.

III. Congressional Review Act

    This action is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

    Dated at Rockville, Maryland, this 10th day of September, 2015.

For the Nuclear Regulatory Commission.
Kimyata Morgan Butler,
Acting Chief, New Reactor Rulemaking and Guidance Branch, Division of 
Advanced Reactors and Rulemaking, Office of New Reactors.
[FR Doc. 2015-24306 Filed 9-24-15; 8:45 am]
BILLING CODE 7590-01-P