[Federal Register Volume 87, Number 35 (Tuesday, February 22, 2022)]
[Notices]
[Pages 9647-9658]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-03593]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2022-0043]


Monthly Notice; Applications and Amendments to Facility Operating 
Licenses and Combined Licenses Involving No Significant Hazards 
Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Monthly notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to section 189.a.(2) of the Atomic Energy Act of 
1954, as amended (the Act), the U.S. Nuclear Regulatory Commission 
(NRC) is publishing this regular monthly notice. The Act requires the 
Commission to publish notice of any amendments issued, or proposed to 
be issued, and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license or combined 
license, as applicable, upon a determination by the Commission that 
such amendment involves no significant hazards consideration (NSHC), 
notwithstanding the pendency before the Commission of a request for a 
hearing from any person. This monthly notice includes all amendments 
issued, or proposed to be issued, from January 7, 2022, to February 3, 
2022. The last monthly notice was published on January 25, 2022.

DATES: Comments must be filed by March 24, 2022. A request for a 
hearing or petitions for leave to intervene must be filed by April 25, 
2022.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website:
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0043. Address 
questions about Docket IDs in Regulations.gov to Stacy Schumann; 
telephone: 301-415-0624; email: [email protected]. For technical 
questions, contact the individual listed in the For Further Information 
Contact section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, telephone: 301-415-1506, email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2022-0043, facility name, unit 
number(s), docket number(s), application date, and subject when 
contacting the NRC about the availability of information for this 
action. You may obtain publicly available information related to this 
action by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0043.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. For the convenience of the reader, 
instructions about obtaining materials referenced in this document are 
provided in the ``Availability of Documents'' section.
     NRC's PDR: You may examine and purchase copies of public 
documents, by appointment, at the NRC's PDR, Room P1 B35, One White 
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make 
an appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 
8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal 
holidays.

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2022-0043, facility name, unit number(s), docket 
number(s), application date, and subject, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at 
https://www.regulations.gov as well as enter the comment submissions 
into ADAMS. The NRC does not routinely edit comment submissions to 
remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facility 
Operating Licenses and Combined Licenses and Proposed No Significant 
Hazards Consideration Determination

    For the facility-specific amendment requests shown in this notice, 
the Commission finds that the licensees' analyses provided, consistent 
with section 50.91 of title 10 of the Code of Federal Regulations (10 
CFR), are sufficient to support the proposed determinations that these 
amendment requests involve NSHC. Under the Commission's regulations in 
10 CFR 50.92, operation of the facilities in accordance with the 
proposed

[[Page 9648]]

amendments would not (1) involve a significant increase in the 
probability or consequences of an accident previously evaluated; or (2) 
create the possibility of a new or different kind of accident from any 
accident previously evaluated; or (3) involve a significant reduction 
in a margin of safety.
    The Commission is seeking public comments on these proposed 
determinations. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determinations.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue any of these license amendments before expiration 
of the 60-day period provided that its final determination is that the 
amendment involves NSHC. In addition, the Commission may issue any of 
these amendments prior to the expiration of the 30-day comment period 
if circumstances change during the 30-day comment period such that 
failure to act in a timely way would result, for example in derating or 
shutdown of the facility. If the Commission takes action on any of 
these amendments prior to the expiration of either the comment period 
or the notice period, it will publish in the Federal Register a notice 
of issuance. If the Commission makes a final NSHC determination for any 
of these amendments, any hearing will take place after issuance. The 
Commission expects that the need to take action on any amendment before 
60 days have elapsed will occur very infrequently.

A. Opportunity To Request a Hearing and Petition for Leave To Intervene

    Within 60 days after the date of publication of this notice, any 
persons (petitioner) whose interest may be affected by any of these 
actions may file a request for a hearing and petition for leave to 
intervene (petition) with respect to that action. Petitions shall be 
filed in accordance with the Commission's ``Agency Rules of Practice 
and Procedure'' in 10 CFR part 2. Interested persons should consult a 
current copy of 10 CFR 2.309. The NRC's regulations are accessible 
electronically from the NRC Library on the NRC's website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, 
the Commission or a presiding officer will rule on the petition and, if 
appropriate, a notice of a hearing will be issued.
    As required by 10 CFR 2.309(d) the petition should specifically 
explain the reasons why intervention should be permitted with 
particular reference to the following general requirements for 
standing: (1) The name, address, and telephone number of the 
petitioner; (2) the nature of the petitioner's right to be made a party 
to the proceeding; (3) the nature and extent of the petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the petitioner's interest.
    In accordance with 10 CFR 2.309(f), the petition must also set 
forth the specific contentions that the petitioner seeks to have 
litigated in the proceeding. Each contention must consist of a specific 
statement of the issue of law or fact to be raised or controverted. In 
addition, the petitioner must provide a brief explanation of the bases 
for the contention and a concise statement of the alleged facts or 
expert opinion that support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner must also provide references to the specific sources and 
documents on which the petitioner intends to rely to support its 
position on the issue. The petition must include sufficient information 
to show that a genuine dispute exists with the applicant or licensee on 
a material issue of law or fact. Contentions must be limited to matters 
within the scope of the proceeding. The contention must be one that, if 
proven, would entitle the petitioner to relief. A petitioner who fails 
to satisfy the requirements at 10 CFR 2.309(f) with respect to at least 
one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene. 
Parties have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that party's admitted 
contentions, including the opportunity to present evidence, consistent 
with the NRC's regulations, policies, and procedures.
    Petitions must be filed no later than 60 days from the date of 
publication of this notice. Petitions and motions for leave to file new 
or amended contentions that are filed after the deadline will not be 
entertained absent a determination by the presiding officer that the 
filing demonstrates good cause by satisfying the three factors in 10 
CFR 2.309(c)(1)(i) through (iii). The petition must be filed in 
accordance with the filing instructions in the ``Electronic Submissions 
(E-Filing)'' section of this document.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of NSHC, the Commission will make a final 
determination on the issue of NSHC. The final determination will serve 
to establish when the hearing is held. If the final determination is 
that the amendment request involves NSHC, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing would take place after issuance of 
the amendment. If the final determination is that the amendment request 
involves a significant hazards consideration, then any hearing held 
would take place before the issuance of the amendment unless the 
Commission finds an imminent danger to the health or safety of the 
public, in which case it will issue an appropriate order or rule under 
10 CFR part 2.
    A State, local governmental body, Federally recognized Indian 
Tribe, or agency thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(h)(1). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission no later 
than 60 days from the date of publication of this notice. The petition 
must be filed in accordance with the filing instructions in the 
``Electronic Submissions (E-Filing)'' section of this document, and 
should meet the requirements for petitions set forth in this section, 
except that under 10 CFR 2.309(h)(2) a State, local governmental body, 
or Federally recognized Indian Tribe, or agency thereof does not need 
to address the standing requirements in 10 CFR 2.309(d) if the facility 
is located within its boundaries. Alternatively, a State, local 
governmental body, Federally recognized Indian Tribe, or agency thereof 
may participate as a non-party under 10 CFR 2.315(c).
    If a petition is submitted, any person who is not a party to the 
proceeding and is not affiliated with or represented by a party may, at 
the discretion of the presiding officer, be permitted to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
his or her position on the issues but may not otherwise participate in 
the proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to the limits and 
conditions as may be imposed by the presiding officer. Details 
regarding the opportunity to make a limited appearance will be provided 
by the presiding officer if such sessions are scheduled.

[[Page 9649]]

B. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings including 
documents filed by an interested State, local governmental body, 
Federally recognized Indian Tribe, or designated agency thereof that 
requests to participate under 10 CFR 2.315(c), must be filed in 
accordance with 10 CFR 2.302. The E-Filing process requires 
participants to submit and serve all adjudicatory documents over the 
internet, or in some cases, to mail copies on electronic storage media, 
unless an exemption permitting an alternative filing method, as 
discussed in this notice, is granted. Detailed guidance on electronic 
submissions is located in the Guidance for Electronic Submissions to 
the NRC (ADAMS Accession No. ML13031A056) and on the NRC website at 
https://www.nrc.gov/site-help/e-submittals.html.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at [email protected], or by 
telephone at 301-415-1677, to (1) request a digital identification (ID) 
certificate, which allows the participant (or its counsel or 
representative) to digitally sign submissions and access the E-Filing 
system for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a petition or 
other adjudicatory document (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. After a digital ID certificate is 
obtained and a docket created, the participant must submit adjudicatory 
documents in Portable Document Format. Guidance on submissions is 
available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system timestamps the document and sends 
the submitter an email confirming receipt of the document. The E-Filing 
system also distributes an email that provides access to the document 
to the NRC's Office of the General Counsel and any others who have 
advised the Office of the Secretary that they wish to participate in 
the proceeding, so that the filer need not serve the document on those 
participants separately. Therefore, applicants and other participants 
(or their counsel or representative) must apply for and receive a 
digital ID certificate before adjudicatory documents are filed to 
obtain access to the documents via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
public website at https://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted in accordance with 10 CFR 
2.302(b)-(d). Participants filing adjudicatory documents in this manner 
are responsible for serving their documents on all other participants. 
Participants granted an exemption under 10 CFR 2.302(g)(2) must still 
meet the electronic formatting requirement in 10 CFR 2.302(g)(1), 
unless the participant also seeks and is granted an exemption from 10 
CFR 2.302(g)(1).
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the 
presiding officer. If you do not have an NRC-issued digital ID 
certificate as previously described, click ``cancel'' when the link 
requests certificates and you will be automatically directed to the 
NRC's electronic hearing dockets where you will be able to access any 
publicly available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information 
such as social security numbers, home addresses, or personal phone 
numbers in their filings unless an NRC regulation or other law requires 
submission of such information. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants 
should not include copyrighted materials in their submission.
    The following table provides the plant name, docket number, date of 
application, ADAMS accession number, and location in the application of 
the licensees' proposed NSHC determinations. For further details with 
respect to these license amendment applications, see the applications 
for amendment, which are available for public inspection in ADAMS. For 
additional direction on accessing information related to this document, 
see the ``Obtaining Information and Submitting Comments'' section of 
this document.

                      License Amendment Request(s)
------------------------------------------------------------------------
 
------------------------------------------------------------------------
Constellation Energy Generation, LLC; Limerick Generating Station, Units
                     1 and 2; Montgomery County, PA
------------------------------------------------------------------------
Docket No(s).................  50-352, 50-353.
Application date.............  March 11, 2021, as supplemented by
                                letter(s) dated May 5, 2021, and
                                December 15, 2021.
ADAMS Accession No...........  ML21070A412, ML21125A215, and
                                ML21349B364.
Location in Application of     Pages 18-20 of Attachment 1 to Letter
 NSHC.                          dated December 15, 2021.
Brief Description of           The license amendment request was
 Amendment(s).                  originally noticed in the Federal
                                Register on August 10, 2021 (86 FR
                                43690). The notice is being reissued in
                                its entirety to include the revised
                                scope, description of the amendment
                                request, and proposed no significant
                                hazards consideration determination. The
                                proposed amendments would modify the
                                licensing basis by revising the license
                                condition in Appendix C to allow the use
                                of an alternate defense-in-depth
                                categorization process, an alternate
                                pressure boundary categorization
                                process, and an alternate seismic Tier 1
                                categorization process to allow the
                                implementation of risk-informed
                                categorization and treatment of
                                structures, systems and components in
                                accordance with 10 CFR 50.69.
Proposed Determination.......  NSHC.

[[Page 9650]]

 
Name of Attorney for           Tamra Domeyer, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                4300 Winfield Road, Warrenville, IL
                                60555.
NRC Project Manager,           V. Sreenivas, 301-415-2597.
 Telephone Number.
------------------------------------------------------------------------
Constellation Energy Generation, LLC; Limerick Generating Station, Units
                     1 and 2; Montgomery County, PA
------------------------------------------------------------------------
Docket No(s).................  50-352, 50-353.
Application date.............  December 15, 2021.
ADAMS Accession No...........  ML21349B378.
Location in Application of     Pages 27-29 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendments would revise
 Amendment(s).                  technical specification (TS)
                                surveillance requirements for emergency
                                diesel generator (EDG) frequency and
                                voltage tolerances and for emergency
                                core cooling system pump flows.
                                Specifically, the amendments would
                                revise certain frequency and voltage
                                acceptance criteria for steady-state EDG
                                surveillance requirements under TS 3/
                                4.8.1, ``A.C. Sources--Operating.'' The
                                proposed changes are consistent with
                                WCAP-17308-NP-A .Rev 0, ``Treatment of
                                Diesel Generator (DG) Technical
                                Specification Frequency and Voltage
                                Tolerances,'' dated July 2017. The
                                proposed amendments would also revise
                                the flow acceptance criteria of the
                                emergency core cooling system (ECCS)
                                pump surveillance requirements under TS3/
                                4.5.1, ``ECCS-Operating.''
Proposed Determination.......  NSHC.
Name of Attorney for           Tamra Domeyer, Associate General Counsel,
 Licensee, Mailing Address.     Constellation Energy Generation, LLC,
                                4300 Winfield Road, Warrenville, IL
                                60555.
NRC Project Manager,           V. Sreenivas, 301-415-2597.
 Telephone Number.
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1
    and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee
   Nuclear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy
 Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick
   County, NC; Duke Energy Progress, LLC; H.B. Robinson Steam Electric
  Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC;
 Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties,
 NC; Duke Energy Carolinas, LLC; William States Lee III Nuclear Station,
                   Units 1 and 2; Cherokee County, SC.
------------------------------------------------------------------------
Docket No(s).................  50-325, 50-324, 50-413, 50-414, 50-400,
                                50-369, 50-370, 50-269, 50-270, 50-287,
                                50-261, 52-018, 52-019.
Application date.............  December 14, 2021.
ADAMS Accession No...........  ML21348A003.
Location in Application of     Pages 16-18 of Enclosure 1.
 NSHC.
Brief Description of           The proposed amendments would relocate
 Amendment(s).                  the Duke Energy Common Emergency
                                Operations Facility (EOF) from 526 South
                                Church Street, Charlotte, NC, to 9700
                                David Taylor Drive, Charlotte, NC. The
                                new location is approximately nine air
                                miles from the current location. Since
                                the proposed change to the EOF's
                                location results in the EOF being
                                greater than 25 miles from any of the
                                Duke Energy nuclear sites, NRC approval
                                is required per 10 CFR part 50 appendix
                                E, IV.E.8.b.
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 550
                                South Tryon Street, Mail Code DEC45A,
                                Charlotte, NC 28202.
NRC Project Manager,           Andrew Hon, 301-415-8480.
 Telephone Number.
------------------------------------------------------------------------
Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York
County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1
    and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee
   Nuclear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy
 Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick
   County, NC; Duke Energy Progress, LLC; H.B. Robinson Steam Electric
  Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC;
 Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties,
                                   NC
------------------------------------------------------------------------
Docket No(s).................  50-325, 50-324, 50-413, 50-414, 50-400,
                                50-369, 50-370, 50-269, 50-270, 50-287,
                                50-261.
Application date.............  January 18, 2022.
ADAMS Accession No...........  ML22018A236.
Location in Application of     Pages 9-11 of Enclosure 1.
 NSHC.
Brief Description of           The proposed amendments would modify
 Amendment(s).                  certain technical specification (TS)
                                surveillance requirements (SRs) by
                                adding exceptions to consider the SR met
                                when automatic valves or dampers are
                                locked, sealed, or otherwise secured in
                                the actuated position, in order to
                                consider the SR met based on TS Task
                                Force (TSTF) Traveler TSTF-541, Revision
                                2, ``Add Exceptions to Surveillance
                                Requirements for Valves and Dampers
                                Locked in the Actuated Position'' (ADAMS
                                Accession No. ML19240A315), and the
                                associated NRC safety evaluation for
                                TSTF-541, Revision 2 (ADAMS Accession
                                No. ML19323E926).
Proposed Determination.......  NSHC.
Name of Attorney for           Kathryn B. Nolan, Deputy General Counsel,
 Licensee, Mailing Address.     Duke Energy Corporation, 550 South Tryon
                                Street (DEC45A), Charlotte, NC 28202.
NRC Project Manager,           Luke Haeg, 301-415-0272.
 Telephone Number.
------------------------------------------------------------------------
   Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2;
                         Mecklenburg County, NC
------------------------------------------------------------------------
Docket No(s).................  50-369, 50-370.
Application date.............  December 20, 2021.
ADAMS Accession No...........  ML21355A362.
Location in Application of     Pages 9 and 10 of Enclosure.
 NSHC.
Brief Description of           The proposed amendments would revise
 Amendment(s).                  McGuire's Unit 1 and 2 Technical
                                Specification 3.4.3, ``RCS Pressure and
                                Temperature (P/T) Limits,'' to reflect
                                that Unit 1's P/T limit curves are
                                applicable up to 54 effective full power
                                years (EFPY) and that Unit 2's P/T limit
                                curves are applicable up to 38.6 EFPY.
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 550
                                South Tryon Street, Mail Code DEC45A,
                                Charlotte, NC 28202.
NRC Project Manager,           John Klos, 301-415-5136.
 Telephone Number.
------------------------------------------------------------------------
 Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No.
                        2; Darlington County, SC
------------------------------------------------------------------------
Docket No(s).................  50-261.
Application date.............  December 9, 2021, as supplemented by
                                letter dated January 6, 2022.
ADAMS Accession No...........  ML21343A047, ML22006A240.
Location in Application of     Pages 2-3 of the Enclosure.
 NSHC.

[[Page 9651]]

 
Brief Description of           The proposed amendment would adopt
 Amendment(s).                  Technical Specifications Task Force
                                (TSTF) Traveler TSTF-577, Revision 1,
                                ``Revised Frequencies for Steam
                                Generator Tube Inspections.''
                                Additionally, Duke Energy proposed a
                                steam generator tube inspection period
                                of 72 effective full power months for
                                the Robinson inspection period that
                                began December 8, 2020. This is a
                                variation from the TS changes described
                                in TSTF-577 because the enhanced probe
                                inspection method has not previously
                                been used for steam generator tube
                                inspections at Robinson. For all future
                                steam generator tube inspections, the
                                enhanced probe inspection method will be
                                utilized.
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 550
                                South Tryon Street, Mail Code DEC45A,
                                Charlotte, NC 28202.
NRC Project Manager,           Tanya Hood, 301-415-1387.
 Telephone Number.
------------------------------------------------------------------------
 Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No.
                        2; Darlington County, SC
------------------------------------------------------------------------
Docket No(s).................  50-261.
Application date.............  December 9, 2021.
ADAMS Accession No...........  ML21343A087.
Location in Application of     Pages 5-6 of the Enclosure 1.
 NSHC.
Brief Description of           The proposed amendment would revise
 Amendment(s).                  Technical Specification (TS) 3.4.3,
                                ``RCS [Reactor Coolant System] Pressure
                                and Temperature (P/T) Limits.''
                                Specifically, a portion of TS Figure
                                3.4.3-2 (P/T limit cooldown curves) is
                                being corrected because it does not
                                reflect the data approved in Amendment
                                No. 248.
Proposed Determination.......  NSHC.
Name of Attorney for           Tracey Mitchell LeRoy, Deputy General
 Licensee, Mailing Address.     Counsel, Duke Energy Corporation, 550
                                South Tryon Street, Mail Code DEC45A,
                                Charlotte, NC 28202.
NRC Project Manager,           Tanya Hood, 301-415-1387.
 Telephone Number.
------------------------------------------------------------------------
  Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC;
      Beaver Valley Power Station, Units 1 and 2; Beaver County, PA
------------------------------------------------------------------------
Docket No(s).................  50-334, 50-412.
Application date.............  September 15, 2021.
ADAMS Accession No...........  ML21258A319.
Location in Application of     Pages 3-5 of Enclosure.
 NSHC.
Brief Description of           Energy Harbor Nuclear Corp. requests
 Amendment(s).                  adoption of Technical Specifications
                                Task Force (TSTF) Traveler, TSTF-577-A,
                                Revision 1, ``Revised Frequencies for
                                Steam Generator Tube Inspections.'' The
                                technical specifications related to
                                steam generator tube inspections and
                                reporting would be revised based on
                                operating history.
Proposed Determination.......  NSHC.
Name of Attorney for           Rick Giannantonio, General Counsel,
 Licensee, Mailing Address.     Energy Harbor Nuclear Corp., Mail Stop A-
                                GO-15, 76 South Main Street, Akron, OH
                                44308.
NRC Project Manager,           Sujata Goetz, 301-415-8004.
 Telephone Number.
------------------------------------------------------------------------
    Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No(s).................  50-397.
Application date.............  November 9, 2021.
ADAMS Accession No...........  ML21314A224.
Location in Application of     Pages 24-25 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendment would modify the
 Amendment(s).                  Columbia Generating Station licensing
                                basis by the addition of a license
                                condition to allow for the
                                implementation of the provisions of 10
                                CFR 50.69, ``Risk-informed
                                categorization and treatment of
                                structures, systems and components for
                                nuclear power reactors.''
Proposed Determination.......  NSHC.
Name of Attorney for           Kathleen Galioto, Assistant General
 Licensee, Mailing Address.     Counsel, Energy Northwest, MD 1020, P.O.
                                Box 968, Richland, WA 99352.
NRC Project Manager,           Mahesh Chawla, 301-415-8371.
 Telephone Number.
------------------------------------------------------------------------
 Entergy Operations, Inc.; Arkansas Nuclear One, Unit 1; Pope County, AR
------------------------------------------------------------------------
Docket No(s).................  50-313.
Application date.............  September 30, 2021, as supplemented by
                                letter dated December 2, 2021.
ADAMS Accession No...........  ML21274A874, ML21337A245.
Location in Application of     Pages 28--29 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendment would revise the
 Amendment(s).                  Dose Equivalent I-131 and the reactor
                                coolant system (RCS) primary activity
                                limits required by Technical
                                Specification (TS) 3.4.12, ``RCS
                                Specific Activity,'' for Arkansas
                                Nuclear One, Unit 1. In addition, the
                                primary-to-secondary leak rate limit
                                provided in TS 3.4.13, ``RCS Operational
                                Leakage,'' would be revised. These
                                proposed changes are proposed to address
                                non-conservative inputs used in the
                                steam generator tube rupture accident,
                                the main steam line break accident, and
                                the control rod ejection accident dose
                                consequence calculations.
Proposed Determination.......  NSHC.
Name of Attorney for           Anna Vinson Jones, Assistant General
 Licensee, Mailing Address.     Counsel, Entergy Services, Inc.,101
                                Constitution Avenue NW, Suite 200 East,
                                Washington, DC 20001.
NRC Project Manager,           Thomas Wengert, 301-415-4037.
 Telephone Number.
------------------------------------------------------------------------
  Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Units 1
                        and 2; Berrien County, MI
------------------------------------------------------------------------
Docket No(s).................  50-315, 50-316.
Application date.............  November 8, 2021.
ADAMS Accession No...........  ML21312A518.
Location in Application of     Pages 2-3 of Enclosure 2.
 NSHC.
Brief Description of           The proposed amendments would revise the
 Amendment(s).                  technical specifications to adopt
                                Technical Specifications Task Force
                                (TSTF) Traveler, TSTF-577, Revision 1,
                                ``Revised Frequencies for Steam
                                Generator Tube Inspections.''
Proposed Determination.......  NSHC.
Name of Attorney for           Robert B. Haemer, Senior Nuclear Counsel,
 Licensee, Mailing Address.     Indiana Michigan Power Company, One Cook
                                Place, Bridgman, MI 49106.

[[Page 9652]]

 
NRC Project Manager,           Scott Wall, 301-415-2855.
 Telephone Number.
------------------------------------------------------------------------
 National Institute of Standards and Technology (NIST), National Bureau
         of Standards test reactor, Montgomery County, Maryland
------------------------------------------------------------------------
Docket No(s).................  50-184.
Application date.............  December 23, 2021, as supplemented by
                                NSHC Supplement Rev.1 letter dated
                                January 11, 2022.
ADAMS Accession No...........  ML21361A246 (Package), ML22012A090.
Location in Application of     Pages 2-4 of supplement.
 NSHC.
Brief Description of           The proposed amendment would revise
 Amendment(s).                  Technical Specification (TS) 3.9.2.1,
                                removing permission to use height checks
                                to verify latching of fuel elements and
                                requiring that both a rotational check
                                and visual verification be performed to
                                verify latching of fuel elements. The
                                proposed TS revisions would provide
                                additional confidence that a fuel
                                element is properly latched and will
                                remain in position during reactor
                                operation. Proper latching of the fuel
                                element during operation ensures
                                adequate cooling flow to the fuel
                                element preventing overheating of the
                                element during normal reactor
                                operations. Specifically, the proposed
                                amendment would revise TS 3.9.2.1 by
                                changing the specification statement
                                from ``shall be accomplished by one of
                                the following methods,'' to ``shall be
                                accomplished by both of the following
                                methods.'' Additionally, TS 3.9.2.1.1
                                ``Elevation check of the fuel element
                                with main pump flow,'' is deleted
                                entirely.
Proposed Determination.......  NSHC.
Name of Attorney for           Henry N. Wixon, Chief of Counsel,
 Licensee, Mailing Address.     National Institute of Standards and
                                Technology, 100 Bureau Drive, Stop 1052,
                                Room A534, Gaithersburg, MD 20899-1052.
NRC Project Manager,           Patrick G. Boyle, 301-415-3936.
 Telephone Number.
------------------------------------------------------------------------
   Northern States Power Company; Monticello Nuclear Generating Plant;
                            Wright County, MN
------------------------------------------------------------------------
Docket No(s).................  50-263.
Application date.............  December 13, 2021.
ADAMS Accession No...........  ML21348A718.
Location in Application of     Pages 19 and 20 of Enclosure.
 NSHC.
Brief Description of           The proposed amendment would revise the
 Amendment(s).                  Monticello Nuclear Generating Plant
                                Technical Specifications (TSs).
                                Specifically, the amendment would revise
                                TS 3.8.3, ``Diesel Fuel Oil, Lube Oil,
                                and Starting Air,'' and TS 3.8.2 ``AC
                                Sources--Shutdown,'' to allow the common
                                fuel oil storage tank to be out of
                                service for up to 14 days to perform
                                inspection required by license renewal.
Proposed Determination.......  NSHC.
Name of Attorney for           Peter M. Glass, Assistant General
 Licensee, Mailing Address.     Counsel, Xcel Energy, 414 Nicollet Mall--
                                401-8, Minneapolis, MN 55401.
NRC Project Manager,           Robert Kuntz, 301-415-3733.
 Telephone Number.
------------------------------------------------------------------------
   Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear
                Plant, Units 1 and 2; Houston County, AL
------------------------------------------------------------------------
Docket No(s).................  50-348, 50-364.
Application date.............  December 13, 2021.
ADAMS Accession No...........  ML21348A733.
Location in Application of     Pages E-14 and E-15 of Enclosure.
 NSHC.
Brief Description of           The proposed amendment would revise the
 Amendment(s).                  peak calculated containment internal
                                pressure for the design basis loss-of-
                                coolant accident (LOCA) described in the
                                Joseph M. Farley Nuclear Plant, Units 1
                                and 2, Technical Specifications 5.5.17,
                                ``Containment Leakage Rate Testing
                                Program.''
Proposed Determination.......  NSHC.
Name of Attorney for           Millicent Ronnlund, Vice President and
 Licensee, Mailing Address.     General Counsel, Southern Nuclear
                                Operating Co., Inc., P.O. Box 1295,
                                Birmingham, AL 35201-1295.
NRC Project Manager,           Stephanie Devlin-Gill, 301-415-5301.
 Telephone Number.
------------------------------------------------------------------------
   Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear
  Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating
  Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke
                               County, GA
------------------------------------------------------------------------
Docket No(s).................  50-348, 50-364, 50-424, 50-425.
Application date.............  December 21, 2021.
ADAMS Accession No...........  ML21356B499.
Location in Application of     Pages E-2 and E-3 of Enclosure.
 NSHC.
Brief Description of           The proposed amendment would adopt the
 Amendment(s).                  NRC-approved Technical Specification
                                Task Force (TSTF) Traveler 269-A,
                                Revision 2, ``Allow Administrative Means
                                of Position Verification for Locked or
                                Sealed Valves.'' The proposed amendment
                                would modify Technical Specification
                                3.6.3, ``Containment Isolation Valves.''
                                Consistent with TSTF-269-A, Notes would
                                be added to allow isolation devices that
                                are locked, sealed or otherwise secured
                                be verified by use of administrative
                                means.
Proposed Determination.......  NSHC.
Name of Attorney for           Millicent Ronnlund, Vice President and
 Licensee, Mailing Address.     General Counsel, Southern Nuclear
                                Operating Co., Inc., P.O. Box 1295,
                                Birmingham, AL 35201-1295.
NRC Project Manager,           John Lamb, 301-415-3100.
 Telephone Number.
------------------------------------------------------------------------
   Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear
  Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating
  Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke
                               County, GA
------------------------------------------------------------------------
Docket No(s).................  50-348, 50-364, 50-424, 50-425.
Application date.............  December 22, 2021.
ADAMS Accession No...........  ML21356B484.
Location in Application of     Pages E-8 and E-9 of Enclosure.
 NSHC.
Brief Description of           The proposed amendment would revise the
 Amendment(s).                  Farley Technical Specifications (TS) by
                                relocating some detailed information
                                from TS 5.5.16, ``Main Steamline
                                Inspection Program,'' to the Farley
                                Updated Final Safety Analysis Report
                                (UFSAR). The proposed amendment would
                                also revise the Vogtle TS by relocating
                                some detailed information from TS
                                5.5.16, ``MS [Main Steam] and FW
                                [Feedwater] Piping Inspection Program,''
                                to the Vogtle UFSAR.
Proposed Determination.......  NSHC.
Name of Attorney for           Millicent Ronnlund, Vice President and
 Licensee, Mailing Address.     General Counsel, Southern Nuclear
                                Operating Co., Inc., P.O. Box 1295,
                                Birmingham, AL 35201-1295.
NRC Project Manager,           John Lamb, 301-415-3100.
 Telephone Number.
------------------------------------------------------------------------

[[Page 9653]]

 
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 1 and 2; Burke County, GA
------------------------------------------------------------------------
Docket No(s).................  50-424, 50-425.
Application date.............  December 22, 2021.
ADAMS Accession No...........  ML21356B485.
Location in Application of     Pages E-6 and E-8 of Enclosure.
 NSHC.
Brief Description of           The proposed amendment would adopt the
 Amendment(s).                  NRC-approved Technical Specification
                                Task Force (TSTF)-283-A, Revision 3,
                                ``Modify Section 3.8 Mode Restriction
                                Notes.'' The proposed amendment would
                                modify Technical Specifications (TS)
                                3.8.1, ``AC Sources--Operating``, and TS
                                3.8.4, ``DC Sources--Operating.''
                                Consistent with TSTF-283-A, Notes would
                                be added to allow greater flexibility in
                                performing Surveillance Requirements in
                                Modes 1, 2, 3, or 4.
Proposed Determination.......  NSHC.
Name of Attorney for           Millicent Ronnlund, Vice President and
 Licensee, Mailing Address.     General Counsel, Southern Nuclear
                                Operating Co., Inc., P.O. Box 1295,
                                Birmingham, AL 35201-1295.
NRC Project Manager,           John Lamb, 301-415-3100.
 Telephone Number.
------------------------------------------------------------------------
   Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
  Susquehanna Steam Electric Station, Units 1 and 2; Luzerne County, PA
------------------------------------------------------------------------
Docket No(s).................  50-387, 50-388.
Application date.............  October 5, 2021, as supplemented by
                                letter dated December 16, 2021.
ADAMS Accession No...........  ML21279A026, ML21350A265.
Location in Application of     Pages 9-11 of Enclosure 1 of October 5,
 NSHC.                          2021 submittal, and Page 2 of supplement
                                dated December 16, 2021.
Brief Description of           The proposed amendments would revise the
 Amendment(s).                  instrumentation allowable values for the
                                core spray and the low pressure cooling
                                injection systems' reactor steam dome
                                pressure low initiation and injection
                                permissive instrumentation functions in
                                Table 3.3.5.1-1 in Technical
                                Specification 3.3.5.1, ``Emergency Core
                                Cooling System (ECCS) Instrumentation.''
                                The proposed amendments would also
                                modify the associated analytical limits
                                and setpoint values for these functions.
Proposed Determination.......  NSHC.
Name of Attorney for           Damon D. Obie, Esq, 835 Hamilton St.,
 Licensee, Mailing Address.     Suite 150, Allentown, PA 18101.
NRC Project Manager,           Audrey Klett, 301-415-0489.
 Telephone Number.
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
                         3; Limestone County, AL
------------------------------------------------------------------------
Docket No(s).................  50-259, 50-260, 50-296.
Application date.............  November 5, 2021.
ADAMS Accession No...........  ML21309A038.
Location in Application of     Pages E-9--E-12 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would allow the
 Amendment(s).                  use of a manually operated chilled water
                                cross-tie line between the Browns Ferry
                                Nuclear Plant (Browns Ferry), Unit 3,
                                control bay chilled water system and the
                                Browns Ferry, Unit 1/2 control bay
                                chilled water system to be used in the
                                event of an abnormal condition when both
                                trains of the Unit 1/2 chilled water
                                system are inoperable. The proposed
                                amendments also would revise Browns
                                Ferry, Units 1, 2, and 3, Technical
                                Specification 3.8.7, ``Distribution
                                Systems--Operating,'' to provide a one-
                                time use exception to the Required
                                Actions during the installation and
                                testing of the cross-tie.
Proposed Determination.......  NSHC.
Name of Attorney for           David Fountain, Executive VP and General
 Licensee, Mailing Address.     Counsel, Tennessee Valley Authority, 400
                                West Summit Hill Drive, WT 6A,
                                Knoxville, TN 37902.
NRC Project Manager,           Kimberly Green, 301-415-1627.
 Telephone Number.
------------------------------------------------------------------------
 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and
                         3; Limestone County, AL
------------------------------------------------------------------------
Docket No(s).................  50-259, 50-260, 50-296.
Application date.............  December 3, 2021.
ADAMS Accession No...........  ML21337A227.
Location in Application of     Pages E-4 and E-5 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would revise a
 Amendment(s).                  few of the instrument testing and
                                calibration definitions in the Browns
                                Ferry Nuclear Plant (Browns Ferry),
                                Units 1, 2, and 3 technical
                                specifications (TSs), as well as
                                incorporate the surveillance frequency
                                control program in a couple of the same
                                definitions. The proposed amendments are
                                based on Technical Specification Task
                                Force (TSTF) Traveler TSTF-205-A,
                                Revision 3, ``Revision of Channel
                                Calibration, Channel Functional Test,
                                and Related Definitions,'' and TSTF-563-
                                A, ``Revise Instrument Testing
                                Definitions to Incorporate the
                                Surveillance Frequency Control
                                Program.'' Additionally, the proposed
                                amendments would rescind the
                                consolidation of several previously
                                approved surveillance requirements
                                approved in Amendment Nos. 315, 338, and
                                298 for Browns Ferry, Units 1, 2, and 3,
                                respectively, and restore the
                                surveillance requirements to their prior
                                status with the frequencies as ``In
                                accordance with the Surveillance
                                Frequency Control Program.''
Proposed Determination.......  NSHC.
Name of Attorney for           David Fountain, Executive VP and General
 Licensee, Mailing Address.     Counsel, Tennessee Valley Authority, 400
                                West Summit Hill Drive, WT 6A,
                                Knoxville, TN 37902.
NRC Project Manager,           Kimberly Green, 301-415-1627.
 Telephone Number.
------------------------------------------------------------------------
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea
                               County, TN
------------------------------------------------------------------------
Docket No(s).................  50-390, 50-391.
Application date.............  December 9, 2021.
ADAMS Accession No...........  ML21344A027.
Location in Application of     Pages E-3 and E-4 of the Enclosure.
 NSHC.
Brief Description of           The proposed amendments would revise
 Amendment(s).                  several instrumentation testing and
                                calibration definitions in the Watts Bar
                                Nuclear Plant, Units 1 and 2, technical
                                specifications, as well as incorporate
                                the surveillance frequency control
                                program in a few of the same
                                definitions. The proposed amendments are
                                based on Technical Specification Task
                                Force (TSTF) Traveler TSTF-205-A,
                                Revision 3, ``Revision of Channel
                                Calibration, Channel Functional Test,
                                and Related Definitions,'' and TSTF-563-
                                A, ``Revise Instrument Testing
                                Definitions to Incorporate the
                                Surveillance Frequency Control
                                Program.''
Proposed Determination.......  NSHC.

[[Page 9654]]

 
Name of Attorney for           David Fountain, Executive VP and General
 Licensee, Mailing Address.     Counsel, Tennessee Valley Authority, 400
                                West Summit Hill Drive, WT 6A,
                                Knoxville, TN 37902.
NRC Project Manager,           Kimberly Green, 301-415-1627.
 Telephone Number.
------------------------------------------------------------------------
 Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
------------------------------------------------------------------------
Docket No(s).................  50-483
Application date.............  September 28, 2021, as supplemented by
                                letter dated December 1, 2021.
ADAMS Accession No...........  ML21272A167 (Package), ML21335A451
                                (Package).
Location in Application of     Pages 158-160 of Enclosure 1 of the
 NSHC.                          Supplement.
Brief Description of           The proposed amendments would revise the
 Amendment(s).                  technical specifications and authorize
                                changes to the final safety analysis
                                report to support a full-scope
                                application of the regulations in 10 CFR
                                50.67, ``Alternative Source Term,'' and
                                described in NRC Regulatory Guide 1.183,
                                Revision 0, ``Alternative Radiological
                                Source Terms for Evaluating Design Basis
                                Accidents at Nuclear Power Reactors.''
                                Specifically, the amendments would
                                revise technical specification (TS)
                                3.7.10, ``Control Room Emergency
                                Ventilation System (CREVS), TS 5.5.11,
                                Ventilation Filter Testing Program,''
                                and TS 5.5.17, ``Control Room Envelope
                                Habitability Program.''
Proposed Determination.......  NSHC.
Name of Attorney for           Jay E. Silberg, Pillsbury Winthrop Shaw
 Licensee, Mailing Address.     Pittman LLP, 1200 17th St., NW,
                                Washington, DC 20036.
NRC Project Manager,           Mahesh Chawla, 301-415-8371.
 Telephone Number.
------------------------------------------------------------------------
 Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO
------------------------------------------------------------------------
Docket No(s).................  50-483.
Application date.............  October 21, 2021, as supplemented by
                                letter dated November 24, 2021.
ADAMS Accession No...........  ML21294A393 (Package), ML21328A182
                                (Package).
Location in Application of     Pages 6-8 of Attachment 1.
 NSHC.
Brief Description of           The proposed amendment would adopt
 Amendment(s).                  Technical Specifications Task Force
                                (TSTF) Traveler TSTF-505, Revision 2,
                                ``Provide Risk-Informed Extended
                                Completion Times--RITSTF [Risk-Informed
                                TSTF] Initiative 4b,'' and TSTF-439,
                                Revision 2, ``Eliminate Second
                                Completion Times Limiting Time from
                                Discovery of Failure to Meet an LCO
                                [Limiting Condition for Operation]'' and
                                would time completion times contained in
                                the applicable technical specifications
                                (TSs). The amendment would modify the TS
                                requirements to add a new TS 5.5.19,
                                ``Risk Informed Completion Time
                                Program,'' to 5.0, ``Administrative
                                Controls.''
Proposed Determination.......  NSHC.
Name of Attorney for           Jay E. Silberg, Pillsbury Winthrop Shaw
 Licensee, Mailing Address.     Pittman LLP, 1200 17th St., NW,
                                Washington, DC 20036.
NRC Project Manager,           Mahesh Chawla, 301-415-8371.
 Telephone Number.
------------------------------------------------------------------------
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station,
                        Unit 1; Coffey County, KS
------------------------------------------------------------------------
Docket No(s).................  50-482.
Application date.............  January 12, 2022.
ADAMS Accession No...........  ML22012A217.
Location in Application of     Pages 3-4 of Attachment I.
 NSHC.
Brief Description of           The proposed amendment would remove the
 Amendment(s).                  Table of Contents from the Wolf Creek
                                Generating Station, Unit 1, Technical
                                Specifications and place it under the
                                licensee control.
Proposed Determination.......  NSHC.
Name of Attorney for           Thomas C. Poindexter, Morgan, Lewis and
 Licensee, Mailing Address.     Bockius LLP, 1111 Pennsylvania Avenue
                                NW, Washington, DC 20004-2541.
NRC Project Manager,           Samson Lee, 301-415-3168.
 Telephone Number.
------------------------------------------------------------------------

III. Notice of Issuance of Amendments to Facility Operating Licenses 
and Combined Licenses

    During the period since publication of the last monthly notice, the 
Commission has issued the following amendments. The Commission has 
determined for each of these amendments that the application complies 
with the standards and requirements of the Atomic Energy Act of 1954, 
as amended (the Act), and the Commission's rules and regulations. The 
Commission has made appropriate findings as required by the Act and the 
Commission's rules and regulations in 10 CFR chapter I, which are set 
forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or combined license, as applicable, proposed NSHC 
determination, and opportunity for a hearing in connection with these 
actions, was published in the Federal Register as indicated in the 
safety evaluation for each amendment.
    Unless otherwise indicated, the Commission has determined that 
these amendments satisfy the criteria for categorical exclusion in 
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
no environmental impact statement or environmental assessment need be 
prepared for these amendments. If the Commission has prepared an 
environmental assessment under the special circumstances provision in 
10 CFR 51.22(b) and has made a determination based on that assessment, 
it is so indicated in the safety evaluation for the amendment.
    For further details with respect to each action, see the amendment 
and associated documents such as the Commission's letter and safety 
evaluation, which may be obtained using the ADAMS accession numbers 
indicated in the following table. The safety evaluation will provide 
the ADAMS accession numbers for the application for amendment and the 
Federal Register citation for any environmental assessment. All of 
these items can be accessed as described in the ``Obtaining Information 
and Submitting Comments'' section of this document.

[[Page 9655]]



                      License Amendment Issuance(s)
------------------------------------------------------------------------
 
------------------------------------------------------------------------
 Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2,
   Will County, IL; Byron Station, Unit Nos. 1 and 2, Ogle County, IL;
   Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power
 Plant, Units 1 and 2, and Independent Spent Fuel Storage Installation;
 Calvert County, MD; Constellation Energy Generation, LLC; Clinton Power
Station, Unit No. 1; DeWitt County, IL; Constellation Energy Generation,
     LLC; LaSalle County Station, Units 1 and 2; LaSalle County, IL;
Constellation Energy Generation, LLC; Limerick Generating Station, Units
  1 and 2; Montgomery County, PA; Constellation Energy Generation, LLC;
 Peach Bottom Atomic Power Station, Units 1, 2, and 3; York County, PA;
Constellation Energy Generation, LLC; Quad Cities Nuclear Power Station,
 Units 1 and 2; Rock Island County, IL; Constellation Energy Generation,
   LLC; Three Mile Island Nuclear Station, Unit 1; Dauphin County, PA;
Constellation Energy Generation, LLC: Dresden Nuclear Power Plant, Units
   1, 2, and 3; Grundy County, IL; Constellation FitzPatrick, LLC and
 Constellation Energy Generation, LLC; James A FitzPatrick Nuclear Power
   Plant; Oswego County, NY; Nine Mile Point Nuclear Station, LLC and
 Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station,
    Units 1 and 2; Oswego County, NY; PSEG Nuclear LLC; Salem Nuclear
  Generating Station, Unit Nos. 1 and 2; Salem County, NJ; R. E. Ginna
Nuclear Power Plant, LLC and Constellation Energy Generation, LLC; R. E.
               Ginna Nuclear Power Plant; Wayne County, NY
------------------------------------------------------------------------
Docket No(s).................  50-456, 50-457, 50-454, 50-455, 50-317,
                                50-318, 72-008, 50-461, 50-010, 50-237,
                                50-249, 50-333, 50-373, 50-374, 50-352,
                                50-353, 50-220, 50-410, 50-171, 50-277,
                                50-278, 50-254, 50-265, 50-244, 50-272,
                                50-311, 50-289.
Amendment Date...............  February 1, 2022.
ADAMS Accession No...........  ML22021B662 (Package).
Amendment No(s)..............  Braidwood 224 (U-1), 224 (U-2); Byron 226
                                (U-1), 226 (U-2); Calvert Cliffs 343 (U-
                                1), 321 (U-2), 12 (ISFSI); Clinton 243;
                                Dresden 50 (U-1), 277 (U-2), 270 (U-3);
                                FitzPatrick 347; Lasalle 254 (U-1), 240
                                (U-2); Limerick 255 (U-1), 217 (U-2);
                                Nine Mile Point 247 (U-1), 189 (U-2);
                                Peach Bottom 17 (U-1), 340 (U-2), 343 (U-
                                3); Quad Cities 289 (U-1), 285 (U-2);
                                Ginna 147; Salem 341 (U-1), 322, (U-2);
                                TMI 302 (U-1).
Brief Description of           By order dated November 16, 2021 (ADAMS
 Amendment(s).                  Accession No. ML21277A192), the NRC
                                staff approved the license transfer
                                application dated February 25, 2021
                                (ADAMS Accession No. ML21057A273), as
                                supplemented, that was submitted by
                                Exelon Generation Company, LLC, on
                                behalf of itself and Exelon Corporation;
                                Exelon FitzPatrick, LLC; Nine Mile Point
                                Nuclear Station, LLC; R. E. Ginna
                                Nuclear Power Plant, LLC; and Calvert
                                Cliffs Nuclear Power Plant, LLC. A copy
                                of the NRC staff safety evaluation
                                (ADAMS Accession No. ML21277A248)
                                related to the license transfer
                                application was provided with the order.
                                The license amendments reflect the
                                transfer transaction that closed on
                                February 1, 2022.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit
                      No. 3; New London County, CT
------------------------------------------------------------------------
Docket No(s).................  50-423.
Amendment Date...............  January 7, 2022.
ADAMS Accession No...........  ML21326A099.
Amendment No(s)..............  281 (Unit 3).
Brief Description of           The amendment modified the technical
 Amendment(s).                  specifications by revising the Reactor
                                Core Safety Limit 2.1.1.2 peak fuel
                                centerline temperature to reflect the
                                fuel centerline temperature specified in
                                Topical Report WCAP-17642-P-A, Revision
                                1, ``Westinghouse Performance Analysis
                                and Design Model (PAD5)''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
Duke Energy Florida, LLC; Crystal River Unit 3 Nuclear Generating Plant;
                            Citrus County, FL
------------------------------------------------------------------------
Docket No(s).................  50-302.
Amendment Date...............  November 24, 2021.
ADAMS Accession No...........  ML21322A270.
Amendment No(s)..............  260 (Unit 3).
Brief Description of           The amendment revised the Crystal River
 Amendment(s).                  Nuclear Plant, Unit 3 (CR3), Independent
                                Spent Fuel Storage Installation (ISFSI)
                                Security Plan, Training and
                                Qualification Plan, and Safeguards
                                Contingency Plan, as well as updated (1)
                                the existing physical security license
                                condition in the facility operating
                                license and (2) the order responses
                                related to additional security measures
                                and fingerprinting for unescorted access
                                at the CR3 ISFSI.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1;
                      Wake and Chatham Counties, NC
------------------------------------------------------------------------
Docket No(s).................  50-400.
Amendment Date...............  January 19, 2022.
ADAMS Accession No...........  ML21316A248.
Amendment No(s)..............  188.
Brief Description of           The amendment revised the facility
 Amendment(s).                  operating license condition associated
                                with the adoption of 10 CFR 50.69,
                                ``Risk-informed Categorization and
                                Treatment of Structures, Systems and
                                Components for Nuclear Power Reactors''
                                to reflect an alternative approach to
                                the one provided in Nuclear Energy
                                Institute's (NEI) 00-04, ``10 CFR 50.69
                                SSC Categorization Guideline,'' Revision
                                0 (ADAMS Accession No. ML052910035), for
                                evaluating the impact of the seismic
                                hazard in the 10 CFR 50.69
                                categorization process, and to also
                                delete the license condition that
                                required the completion of certain
                                implementation items prior to the
                                implementation of 10 CFR 50.69.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1;
                      Wake and Chatham Counties, NC
------------------------------------------------------------------------
Docket No(s).................  50-400.
Amendment Date...............  January 20, 2022.
ADAMS Accession No...........  ML21320A001.
Amendment No(s)..............  189.
Brief Description of           The amendment revises the Technical
 Amendment(s).                  Specifications to reflect the transition
                                of the licensee-controlled plant
                                procedure PLP-106, ``Technical
                                Specification Equipment List Program,''
                                to a licensee-controlled Technical
                                Requirements Manual.

[[Page 9656]]

 
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
  Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC;
           Perry Nuclear Power Plant, Unit 1; Lake County, OH
------------------------------------------------------------------------
Docket No(s).................  50-440.
Amendment Date...............  January 10, 2022.
ADAMS Accession No...........  ML21322A260.
Amendment No(s)..............  197.
Brief Description of           The amendment revises Technical
 Amendment(s).                  Specifications (TS) 3.4.9, ``Residual
                                Heat Removal (RHR) Shutdown Cooling
                                System--Hot Shutdown,'' and TS 3.4.10,
                                ``Residual Heat Removal (RHR) Shutdown
                                Cooling System--Cold Shutdown,'' in
                                accordance with Technical Specifications
                                Task Force (TSTF) Traveler, TSTF-566,
                                Revision 0, ``Revise Actions for
                                Inoperable RHR Shutdown Cooling
                                Subsystem,'' and TSTF-580, Revision 1,
                                ``Provide Exception from Entering Mode 4
                                With No Operable RHR Shutdown Cooling.''
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
    Energy Northwest; Columbia Generating Station; Benton County, WA
------------------------------------------------------------------------
Docket No(s).................  50-397.
Amendment Date...............  January 13, 2022.
ADAMS Accession No...........  ML21293A164.
Amendment No(s)..............  266.
Brief Description of           The amendment removed License Condition
 Amendment(s).                  (LC) 2.C.(34) and revised LC 2.C.(35).
                                The LC 2.C.(34) is no longer applicable
                                because the Columbia Generating Station
                                (Columbia) Final Safety Analysis Report
                                has been updated to include the license
                                renewal commitments. The revision to LC
                                2.C.(35) clarified that future changes
                                to the license renewal commitments, as
                                dictated by operating experience, are
                                made under the provisions of 10 CFR
                                50.59, ``Changes, tests, and
                                experiments.'' The changes do not result
                                in changes to the technical
                                specifications or operating requirements
                                for Columbia.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will
 County, IL; Exelon Generation Company, LLC; Braidwood Station, Units 1
 and 2; Will County, IL; Exelon Generation Company, LLC; Byron Station,
   Unit Nos. 1 and 2, Ogle County, IL; Exelon Generation Company, LLC;
 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2; Calvert County,
 MD; Exelon Generation Company, LLC, Clinton Power Station, Unit No. 1,
DeWitt County, IL; Exelon Generation Company, LLC; Dresden Nuclear Power
  Station, Units 2 and 3; Grundy County, IL; Exelon Generation Company,
   LLC and Exelon FitzPatrick, LLC; James A. FitzPatrick Nuclear Power
Plant; Oswego County, NY; Exelon Generation Company, LLC, LaSalle County
 Station, Units 1 and 2; LaSalle County, IL; Exelon Generation Company,
 LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA;
Exelon Generation Company, LLC; Nine Mile Point Nuclear Station, Units 1
    and 2; Oswego County, NY; Exelon Generation Company, LLC and PSEG
 Nuclear LLC; Peach Bottom Atomic Power Station, Units 2 and 3; York and
   Lancaster Counties, PA; Exelon Generation Company, LLC; Quad Cities
  Nuclear Power Station, Units 1 and 2; Rock Island County, IL; Exelon
 Generation Company, LLC; R. E. Ginna Nuclear Power Plant; Wayne County,
NY; Exelon Generation Company, LLC; Limerick Generating Station, Units 1
                      and 2; Montgomery County, PA
------------------------------------------------------------------------
Docket No(s).................  50-456, 50-457, 50-454, 50-455, 50-317,
                                50-318, 50-461, 50-237, 50-249, 50-333,
                                50-373, 50-374, 50-352, 50-353, 50-410,
                                50-277, 50-278, 50-254, 50-265, 50-244.
Amendment Date...............  January 13, 2022.
ADAMS Accession No...........  ML21347A038.
Amendment No(s)..............  Braidwood 223 (U-1) 223 (U-2); Byron 225
                                (U-1) 225 (U-2); Calvert Cliffs 341 (U-
                                1) 319 (U-2); Clinton 242; Dresden 276
                                (U-2) 269 (U-3); FitzPatrick 346;
                                LaSalle 253 (U-1) 239 (U-2); Limerick
                                254 (U-1) 216 (U-2); Nine Mile Point 188
                                (U-2); Peach Bottom 339 (U-2) 342 (U-3);
                                Quad Cities 288 (U-1) 284 (U-2); Ginna
                                146.
Brief Description of           The amendments revised the reactor
 Amendment(s).                  coolant leakage requirements in the
                                technical specifications for each
                                facility based on Technical
                                Specifications Task Force (TSTF)
                                Traveler TSTF 554, Revision 1, ``Revise
                                Reactor Coolant Leakage Requirements,''
                                (ADAMS Accession No. ML20016A233).
Public Comments Received as    Yes.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
   Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant,
                    Units 1 and 2; Calvert County, MD
------------------------------------------------------------------------
Docket No(s).................  50-317, 50-318.
Amendment Date...............  January 13, 2022.
ADAMS Accession No...........  ML21347A864.
Amendment No(s)..............  342 (Unit 1) and 320 (Unit 2).
Brief Description of           The amendments incorporated changes to
 Amendment(s).                  the Updated Final Safety Analysis Report
                                and the Technical Requirements Manual to
                                allow for a full core offload without
                                the availability of being supplemented
                                with one loop of the shutdown cooling
                                system during certain refueling outages.
                                The amendments also incorporated a
                                change in calculational methodology used
                                in the Calvert Cliffs spent fuel pool
                                heat-up analysis.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Florida Power & Light Company, et al.; St. Lucie Plant, Unit Nos. 1 and
                         2; St. Lucie County, FL
------------------------------------------------------------------------
Docket No(s).................  50-335, 50-389.
Amendment Date...............  January 14, 2022.
ADAMS Accession No...........  ML21342A209.
Amendment No(s)..............  252 (Unit 1) and 207 (Unit 2).

[[Page 9657]]

 
Brief Description of           The amendments extended technical
 Amendment(s).                  specification (TS) requirements to
                                permit the use of Risk Informed
                                Completion Times (RICTs) to the 120-Volt
                                alternating current (AC) Instrument Bus
                                TS, in accordance with TSTF-505,
                                Revision 2, ``Provide Risk-Informed
                                Completion Times RITSTF Initiative 4b,''
                                and Nuclear Energy Institute (NEI) 06-
                                09, ``Risk-Informed Technical
                                Specifications Initiative 4b, Risk
                                Managed Technical Specifications (RMTS)
                                Guidelines.'' Accordingly, these
                                amendments revised License Condition J
                                of the St. Lucie 1 Renewed Facility
                                Operating License (RFOL) and License
                                Condition O of the St. Lucie 2 RFOL,
                                respectively, each of which adds the
                                amendment numbers resulting from this
                                amendment request and deletes the first
                                listed condition specifying activities
                                to be completed prior to implementing
                                the RICT Program. The amendments also
                                modified Unit 1 TS 3.8.2.1 Action b and
                                Unit 2 TS 3.8.3.1 Action b to permit the
                                use of a RICT for the 120 VAC instrument
                                buses.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
   NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Linn
                               County, IA
------------------------------------------------------------------------
Docket No(s).................  50-331.
Amendment Date...............  January 21, 2022.
ADAMS Accession No...........  ML21172A217.
Amendment No(s)..............  315.
Brief Description of           The U.S. Nuclear Regulatory Commission
 Amendment(s).                  (NRC, Commission) has issued Amendment
                                No. 315 to Renewed Facility Operating
                                License No. DPR 49, for the Duane Arnold
                                Energy Center (DAEC), operated by
                                NextEra Energy Duane Arnold, LLC. The
                                amendment consists of revisions to the
                                Renewed Facility Operating License and
                                the technical specifications (TS) in
                                response to DAEC's application dated
                                February 19, 2021 (ADAMS Accession No.
                                ML21050A189), as supplemented on January
                                3, 2022 (ADAMS Package Accession No.
                                ML22004A010). These revisions reflect
                                the removal of all spent nuclear fuel
                                from the DAEC spent fuel pool and its
                                transfer to dry cask storage within an
                                onsite Independent Spent Fuel Storage
                                Installation (ISFSI). These changes more
                                fully reflect the permanently shutdown
                                status of the decommissioning facility,
                                as well as the reduced scope of
                                structures, systems, and components
                                necessary to ensure plant safety once
                                all spent fuel has been permanently
                                moved to the DAEC ISFSI, an activity
                                which is currently scheduled for
                                completion in mid-2022. The changes also
                                include the relocation of administrative
                                controls from the TS to the DAEC Quality
                                Assurance Topical Report, as well as
                                deletion of the remaining TS Bases,
                                except for certain environmental
                                reporting requirements which are
                                required to remain in the TS in
                                accordance with 10 CFR 50.36a(a)(2). The
                                changes shall be implemented within 60
                                days following submittal of written
                                notification to the NRC that all spent
                                nuclear fuel assemblies have been
                                transferred out of the DAEC SFP and
                                placed in dry storage within the ISFSI.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
   Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear
  Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating
  Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke
                               County, GA
------------------------------------------------------------------------
Docket No(s).................  50-348, 50-364, 50-424, 50-425.
Amendment Date...............  January 26, 2022.
ADAMS Accession No...........  ML21344A003.
Amendment No(s)..............  Farley--239 (Unit 1) and 236 (Unit 2),
                                Vogtle--212 (Unit 1), and 195 (Unit 2).
Brief Description of           The amendments revised TS 3.1.7, ``Rod
 Amendment(s).                  Position Indication,'' TS 3.2.1, ``Heat
                                Flux Hot Channel Factor (FQ(Z)),'' and
                                TS 3.3.1, ``Reactor Trip System (RTS)
                                Instrumentation,'' to allow the use of
                                an alternate means of determining power
                                distribution information. The amendments
                                allow the use of a dedicated on-line
                                core power distribution monitoring
                                system (PDMS) to perform surveillance of
                                core thermal limits. The PDMS to be used
                                at Farley, Units 1 and 2; and Vogtle,
                                Units 1 and 2, is the Westinghouse
                                proprietary core analysis system called
                                ``Best Estimate Analyzer for Core
                                Operations--Nuclear'' (BEACONTM).
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
 Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant,
 Units 1 and 2; Appling County, GA; Southern Nuclear Operating Company,
Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL;
  Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating
                 Plant, Units 1 and 2; Burke County, GA
------------------------------------------------------------------------
Docket No(s).................  50-321, 50-364, 50-366, 50-348, 50-424,
                                50-425.
Amendment Date...............  February 2, 2022.
ADAMS Accession No...........  ML21349A518.
Amendment No(s)..............  Farley--240 (Unit 1) and 237 (Unit 2),
                                Hatch--314 (Unit 1) and 259 (Unit 2),
                                Vogtle--213 (Unit 1), and 196 (Unit 2).
Brief Description of           In its application dated September 29,
 Amendment(s).                  2021, the licensee requested that the
                                U.S. Nuclear Regulatory Commission (NRC,
                                the Commission) process the proposed
                                license amendment request under the
                                Consolidated Line Item Improvement
                                Process. The amendments revised the
                                technical specifications related to
                                reactor coolant system operational
                                leakage and the definition of the term
                                ``LEAKAGE'' based on Technical
                                Specifications Task Force (TSTF)
                                Traveler TSTF-554, Revision 1, ``Revise
                                Reactor Coolant Leakage Requirements,''
                                (TSTF-554) (ADAMS Accession No.
                                ML20016A233), and the associated NRC
                                staff safety evaluation of TSTF-554
                                (ADAMS Accession No. ML20322A024).
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
    Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1; Rhea
                               County, TN
------------------------------------------------------------------------
Docket No(s).................  50-390.
Amendment Date...............  January 18, 2022.
ADAMS Accession No...........  ML21334A295.
Amendment No(s)..............  151 (Unit 1).
Brief Description of           The amendment revised the existing Note
 Amendment(s).                  in the Limiting Condition for Operation
                                for Watts Bar Nuclear Plant, Unit 1,
                                Technical Specification 3.7.12,
                                ``Auxiliary Building Gas Treatment
                                System (ABGTS),'' to allow the auxiliary
                                building secondary containment enclosure
                                boundary to be opened, at specific
                                controlled access points, on a
                                continuous basis, during the Watts Bar
                                Nuclear Plant, Unit 2, Cycle 4 refueling
                                outage, when the replacement steam
                                generators will be installed.

[[Page 9658]]

 
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
    Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rhea
                               County, TN
------------------------------------------------------------------------
Docket No(s).................  50-391.
Amendment Date...............  January 12, 2022.
ADAMS Accession No...........  ML21334A389.
Amendment No(s)..............  59 (Unit 2).
Brief Description of           The amendment revised the steam generator
 Amendment(s).                  (SG) tube rupture analysis to utilize
                                the new primary and secondary side mass
                                releases and new reactor coolant system
                                and SG masses associated with the Unit 2
                                replacement SGs.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------
    Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rhea
                               County, TN
------------------------------------------------------------------------
Docket No(s).................  50-391.
Amendment Date...............  January 25, 2022.
ADAMS Accession No...........  ML21306A287.
Amendment No(s)..............  60 (Unit 2).
Brief Description of           The amendment revised the Watts Bar
 Amendment(s).                  Nuclear Plant, Unit 2, technical
                                specifications (TSs) to delete several
                                requirements for steam generator (SG)
                                tube inspection and repair methodologies
                                that will no longer apply following
                                installation of the replacement SGs. The
                                amendment also revised TS 5.7.2.12.d.2
                                to reflect the SG inspection interval
                                criteria for Alloy 690 thermally treated
                                tubing. Additionally, the amendment
                                revised Watts Bar, Unit 2's license
                                condition 2.C.(4) to delete the
                                reference to PAD4TCD, which will no
                                longer apply following the installation
                                of the replacement SGs.
Public Comments Received as    No.
 to Proposed NSHC (Yes/No).
------------------------------------------------------------------------


    Dated: February 15, 2022.

    For the Nuclear Regulatory Commission.
Caroline L. Carusone,
Deputy Director, Division of Operating Reactor Licensing, Office of 
Nuclear Reactor Regulation.
[FR Doc. 2022-03593 Filed 2-18-22; 8:45 am]