[Federal Register Volume 88, Number 42 (Friday, March 3, 2023)] [Notices] [Pages 13474-13476] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2023-04443] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 50-263; NRC-2023-0031] Northern States Power Company--Minnesota; Xcel Energy; Monticello Nuclear Generating Plant, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION: Subsequent license renewal application; opportunity to request a hearing and to petition for leave to intervene. ----------------------------------------------------------------------- SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering an application for the subsequent license renewal of Renewed Facility Operating License No. DPR-22, which authorizes Northern States Power Company, a Minnesota corporation (NSPM or the applicant), doing business as Xcel Energy, to operate Monticello Nuclear Generating Plant (MNGP), Unit 1. The subsequent renewed license would authorize the applicant to operate MNGP for an additional 20 years beyond the period specified in the current license. The current operating license for MNGP expires September 8, 2030. DATES: A request for a hearing or petition for leave to intervene must be filed by May 2, 2023. ADDRESSES: Please refer to Docket ID NRC-2021-0031 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0031. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-287-0624; email: [email protected]. For technical questions, contact the individual listed in the For Further Information Contact section of this document. NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to [email protected]. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. Public Library: A copy of the subsequent license renewal application for MNGP can be accessed at the following public library: Monticello Great River Regional Library, 200 West 6th St., Monticello, MN 55362. NRC's PDR: You may examine and purchase copies of public documents, by appointment, at the NRC's PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to [email protected] or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Jessica Hammock, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-0740; email: [email protected]. SUPPLEMENTARY INFORMATION: I. Introduction The NRC received a subsequent license renewal application (SLRA) from NSPM, dated January 9, 2023 (ADAMS Accession No. ML23009A354), filed pursuant to section 103 of the Atomic Energy Act of 1954, as amended (the Act), and part 54 of title 10 of the Code of Federal Regulations (10 CFR), to renew the operating license for MNGP at 2,004 megawatts thermal. The MNGP unit is a boiling-water reactor designed by General Electric and is located in Monticello, Minnesota. A notice of receipt of the SLRA was published in the Federal Register on January 31, 2023 (88 FR 6327). The NRC staff has determined that NSPM has submitted sufficient information in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23, 51.45, and 51.53(c), to enable the staff to undertake a review of the application, and that the application is, therefore, acceptable for docketing. The current docket no. 50-263 for Renewed Facility Operating License No. DPR-22, will be retained. The determination to accept the SLRA for docketing does not constitute a determination that a subsequent renewed license should be issued and does not preclude the NRC staff from requesting additional information as the review proceeds. Before issuance of the requested subsequent renewed licenses, the NRC will have made the findings required by the Act and the Commission's rules and regulations. In accordance with 10 CFR 54.29, the NRC may issue a subsequent renewed license on the basis of its review if it finds that actions have been [[Page 13475]] identified and have been or will be taken with respect to: (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified as requiring aging management review; and (2) time-limited aging analyses that have been identified as requiring review, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis and that any changes made to the plant's current licensing basis will comply with the Act and the Commission's regulations. Additionally, in accordance with 10 CFR 51.95(c), the NRC staff will prepare an environmental impact statement as a supplement to the Commission's NUREG-1437, ``Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants,'' dated June 2013 (ADAMS Accession No. ML13106A241). In considering the SLRA, the Commission must find that the applicable requirements of subpart A of 10 CFR part 51 have been satisfied, and that any matters raised under 10 CFR 2.335 have been addressed. Pursuant to 10 CFR 51.26, and as part of the environmental scoping process, the staff intends to hold public scoping meetings. Detailed information regarding the environmental scoping meetings will be the subject of a separate Federal Register notice. II. Opportunity To Request a Hearing and Petition for Leave To Intervene Within 60 days after the date of publication of this notice, any person (petitioner) whose interest may be affected by this action may file a request for a hearing and petition for leave to intervene (petition) with respect to the action. Petitions shall be filed in accordance with the Commission's ``Agency Rules of Practice and Procedure'' in 10 CFR part 2. Interested persons should consult 10 CFR 2.309. If a petition is filed, the presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued. Petitions must be filed no later than 60 days from the date of publication of this notice in accordance with the filing instructions in the ``Electronic Submissions (E-Filing)'' section of this document. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). A State, local governmental body, Federally recognized Indian Tribe, or designated agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h) no later than 60 days from the date of publication of this notice. Alternatively, a State, local governmental body, Federally recognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c). For information about filing a petition and about participation by a person not a party under 10 CFR 2.315, see the information provided at ADAMS Accession No. ML20340A053 (https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053) and on the NRC's public website at https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate. III. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings including documents filed by an interested State, local governmental body, Federally recognized Indian Tribe, or designated agency thereof that requests to participate under 10 CFR 2.315(c), must be filed in accordance with 10 CFR 2.302. The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases, to mail copies on electronic storage media, unless an exemption permitting an alternative filing method, as further discussed, is granted. Detailed guidance on electronic submissions is located in the ``Guidance for Electronic Submissions to the NRC'' (ADAMS Accession No. ML13031A056) and on the NRC's public website at https://www.nrc.gov/site-help/e-submittals.html. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at [email protected], or by telephone at 301-415-1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or its counsel or representative, already holds an NRC- issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. After a digital ID certificate is obtained and a docket created, the participant must submit adjudicatory documents in Portable Document Format. Guidance on submissions is available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the document is submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E--Filing system no later than 11:59 p.m. ET on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an email confirming receipt of the document. The E-Filing system also distributes an email that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed to obtain access to the documents via the E-Filing system. A person filing electronically using the NRC's adjudicatory E- Filing system may seek assistance by contacting the NRC's Electronic Filing Help Desk through the ``Contact Us'' link located on the NRC's public website at https://www.nrc.gov/site-help/e-submittals.html, by email to [email protected], or by a toll-free call at 1-866-672- 7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m., ET, Monday through Friday, except Federal holidays. [[Page 13476]] Participants who believe that they have good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted in accordance with 10 CFR 2.302(b)-(d). Participants filing adjudicatory documents in this manner are responsible for serving their documents on all other participants. Participants granted an exemption under 10 CFR 2.302(g)(2) must still meet the electronic formatting requirement in 10 CFR 2.302(g)(1), unless the participant also seeks and is granted an exemption from 10 CFR 2.302(g)(1). Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the presiding officer. If you do not have an NRC-issued digital ID certificate as previously described, click ``cancel'' when the link requests certificates and you will be automatically directed to the NRC's electronic hearing dockets where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include personal privacy information such as social security numbers, home addresses, or personal phone numbers in their filings unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants should not include copyrighted materials in their submission. Detailed information about the license renewal process can be found under the Nuclear Reactors icon at https://www.nrc.gov/reactors/operating/licensing/renewal.html on the NRC's public website. Copies of the application to renew the operating license for MNGP are available for public inspection at the NRC's PDR, and on the NRC's public website at https://www.nrc.gov/reactors/operating/licensing/renewal/applications.html. The application may be accessed in ADAMS through the NRC Library on the internet at https://www.nrc.gov/reading-rm/adams.html under ADAMS Accession No. ML23009A354. As previously stated, persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS may contact the NRC's PDR reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by email to [email protected]. Dated: February 28, 2023. For the Nuclear Regulatory Commission. Lauren K. Gibson, Chief, License Renewal Project Branch, Division of New and Renewed Licenses, Office of Nuclear Reactor Regulation. [FR Doc. 2023-04443 Filed 3-2-23; 8:45 am] BILLING CODE 7590-01-P