Nightfall Renewables Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 26, 2024, Nightfall Renewables Inc., filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Maxwell Pumped Storage Project to be located in Kern County, California
near Rosamond, California. The proposed 3,600-megawatt closed-loop
project would occupy federal land managed by the Bureau of Land
Management. The sole purpose of a preliminary permit is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of: (1) four new roller-
compacted concrete or rockfill dams upper dams and reservoirs, and 36
lower reservoirs, excavated from rock consisting of 16 ``rooms'', each
50 feet wide, 70 feet high, and 200 feet-long; (2) four 3,000-feet-
long/deep, 24-foot-diameter concrete lined, vertical headrace shafts;
(3) nine 20-foot-wide, 20-foot-high headrace tunnels averaging 5,150
feet long; (4) thirty six 12-foot-diameter, 160-foot-long steel
penstock pipes at the powerhouse turbine level; (5) twelve 300-foot-
long, 100-foot-wide, 230-foot-high powerhouses excavated from rock
approximately 5,000 feet below surface; (6) a transformer room 36 feet
wide, 25 feet high, and 190 feet long located approximately 260 feet
above each powerhouse; (7) thirty six sets of 18-foot-wide, 16-foot-
high, 435-foot-long unlined turbine tailraces; foot-wide, 16-foot-high,
410-foot-long on average unlined pump intake tailraces; and 12-foot-
diameter, 200-foot-long steel pipe pump discharge tailraces; (8) two
access ramps and 35 access tunnels, all approximately 18 feet wide and
16 feet high, totaling approximately 105,000 feet in length; (9) an
approximately 5,560-foot-long, 1,780-foot-wide, 160-acre rock pad; (10)
a new 9.5-mile-long, 8-inch-diameter pipe connecting the project to an
existing untreated water pipe; and (11) two new 500-foot-long, 100-
foot-wide pre-fabricated steel buildings.
Upper reservoir dam 1 would be approximately 1,740 feet long and 40
feet wide at the crest, creating upper reservoir 1, with a surface area
of approximately 29.1 acres, a storage capacity of approximately 2,420
acre-feet, and a surface elevation of 5,120 feet above mean sea level
(msl). Upper reservoir dam 2 would be approximately 1,300 feet long and
40 feet wide at the crest, creating upper reservoir 2, with a surface
area of approximately 27.1 acres, a storage capacity of approximately
2,760 acre-feet, and a surface elevation of 4,920 feet msl. Upper
reservoir dam 3 will be approximately 1,280 feet long and 60 feet wide
at the crest, creating upper reservoir 3, with a surface area of
approximately 26.6 acres, a storage capacity of approximately 2,435
acre-feet, and a surface elevation of 4,880 feet msl. Upper reservoir
dam 4 will be approximately 1,120 feet long and 60 feet wide at the
crest, creating upper reservoir 4, with a surface area of approximately
24.3 acres, a storage capacity of approximately 2,385 acre-feet, and a
surface elevation of 4,720 feet MSL.
A new substation (Maxwell Substation) would be constructed,
bifurcating two existing Southern California Edison (SCE) 500-kilovolt
(kV) single-circuit transmission lines. A second transmission line
would be constructed from the Maxwell Substation to the SCE Whirlwind
Substation. A new 3.5-mile-long 500-kV double-circuit transmission line
would
[[Page 51331]]
be constructed from the Maxwell Substation to connect to the
powerhouses. A sub-surface line would connect to the underground
powerhouse transformers. The estimated annual energy production of the
proposed project would be approximately 14,000,000 megawatt-hours.
Applicant Contacts: Mr. Benjamin Wayne Mossman, Chief Executive
Director, Nightfall Renewable Resources 30001 Lava Ridge Court, Suite
120, Roseville, CA 95661; email: [email protected];
phone (530) 557-9524.
FERC Contact: Benjamin Mann; email; [email protected]; phone
(202) 502-8127.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members, and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with filings such as interventions,
comments, or requests for rehearing, the public is encouraged to
contact OPP at (202) 502-6595 or [email protected]. Comments, motions to
intervene, competing applications (without notices of intent), or
notices of intent to file competing applications should be submitted
within 60 days from the issuance of this notice. Competing applications
and notices of intent must meet the requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters without prior registration using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. For
assistance, please get in touch with FERC Online Support at
[email protected], (866) 208-3676 (toll-free), or (202) 502-
8659 (TTY). Instead of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15345-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P-15345) in the docket number field to access
the document. For assistance, do not hesitate to get in touch with FERC
Online Support.
Dated: June 11, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-13285 Filed 6-14-24; 8:45 am]