[118th Congress Public Law 183]
[From the U.S. Government Publishing Office]



[[Page 138 STAT. 2625]]

Public Law 118-183
118th Congress

                                 An Act


 
To amend the Colorado River Basin Salinity Control Act to modify certain 
    requirements applicable to salinity control units, and for other 
            purposes. <<NOTE: Dec. 23, 2024 -  [H.R. 7872]>> 

    Be it enacted by the Senate and House of Representatives of the 
United States of America in Congress assembled, <<NOTE: Colorado River 
Salinity Control Fix Act.>> 
SECTION <<NOTE: 43 USC 1571 note.>> 1. SHORT TITLE.

    This Act may be cited as the ``Colorado River Salinity Control Fix 
Act''.
SEC. 2. SALINITY CONTROL UNITS.

    Section 205 of the Colorado River Basin Salinity Control Act (43 
U.S.C. 1595) is amended--
            (1) by striking the section designation and all that follows 
        through ``(a) The Secretary'' and inserting the following:
``SEC. 205. SALINITY CONTROL UNITS; AUTHORITY AND FUNCTIONS OF THE 
                        SECRETARY OF THE INTERIOR.

    ``(a) Allocation of Costs.--The Secretary'';
            (2) by striking paragraph (1) and inserting the following:
            ``(1) Nonreimbursable costs; reimbursable costs.--
                    ``(A) Nonreimbursable costs.--
                          ``(i) In general.--In recognition of Federal 
                      responsibility for the Colorado River as an 
                      interstate stream and for international comity 
                      with Mexico, Federal ownership of the land of the 
                      Colorado River Basin from which most of the 
                      dissolved salts originate, and the policy 
                      established in the Federal Water Pollution Control 
                      Act (33 U.S.C. 1251 et seq.) and except as 
                      provided in clause (ii), the following shall be 
                      nonreimbursable:
                                    ``(I) 75 percent of the total costs 
                                of construction and replacement of each 
                                unit or separable feature of a unit 
                                authorized by section 202(a)(1), 
                                including 90 percent of--
                                            ``(aa) the costs of 
                                        operation and maintenance of 
                                        each unit or separable feature 
                                        of a unit authorized by that 
                                        section; and
                                            ``(bb) the total costs of 
                                        construction, operation, and 
                                        maintenance of the associated 
                                        measures to replace incidental 
                                        fish and wildlife values 
                                        foregone.
                                    ``(II) 75 percent of the total costs 
                                of construction and replacement of each 
                                unit or separable

[[Page 138 STAT. 2626]]

                                feature of a unit authorized by section 
                                202(a)(2), including 100 percent of--
                                            ``(aa) the costs of 
                                        operation and maintenance of 
                                        each unit or separable feature 
                                        of a unit authorized by that 
                                        section; and
                                            ``(bb) the total costs of 
                                        construction, operation, and 
                                        maintenance of the associated 
                                        measures to replace incidental 
                                        fish and wildlife values 
                                        foregone.
                                    ``(III) 75 percent of the total 
                                costs of construction, operation, 
                                maintenance, and replacement of each 
                                unit or separable feature of a unit 
                                authorized by section 202(a)(3), 
                                including 75 percent of the total costs 
                                of construction, operation, and 
                                maintenance of the associated measures 
                                to replace incidental fish and wildlife 
                                values foregone.
                                    ``(IV) 70 percent of the total costs 
                                of construction, operation, maintenance, 
                                and replacement of each unit or 
                                separable feature of a unit authorized 
                                by paragraphs (4) and (6) of section 
                                202(a), including 70 percent of the 
                                total costs of construction, operation, 
                                and maintenance of the associated 
                                measures to replace incidental fish and 
                                wildlife values foregone.
                                    ``(V) 70 percent of the total costs 
                                of construction and replacement of each 
                                unit or separable feature of a unit 
                                authorized by section 202(a)(5), 
                                including 100 percent of--
                                            ``(aa) the costs of 
                                        operation and maintenance of 
                                        each unit or separable feature 
                                        of a unit authorized by that 
                                        section; and
                                            ``(bb) the total costs of 
                                        construction, operation, and 
                                        maintenance of the associated 
                                        measures to replace incidental 
                                        fish and wildlife values 
                                        foregone.
                                    ``(VI) 85 percent of the total costs 
                                of implementation of the on-farm 
                                measures authorized by section 202(c), 
                                including 85 percent of the total costs 
                                of the associated measures to replace 
                                incidental fish and wildlife values 
                                foregone.
                          ``(ii) Special rule for nonreimbursable costs 
                      for fiscal years 2024 and 2025.--Notwithstanding 
                      clause (i), for each of fiscal years 2024 and 
                      2025, the following shall be nonreimbursable:
                                    ``(I) 75 percent of all costs 
                                described in clause (i)(I).
                                    ``(II) 75 percent of all costs 
                                described in clause (i)(II).
                                    ``(III) 70 percent of all costs 
                                described in clause (i)(V).
                                    ``(IV) The percentages of all costs 
                                described in subclauses (III), (IV), and 
                                (VI) of clause (i).
                    ``(B) Reimbursable costs.--The total costs remaining 
                after the allocations under clauses (i) and (ii) of 
                subparagraph (A) shall be reimbursable as provided for 
                in paragraphs (2), (3), (4), and (5).'';

[[Page 138 STAT. 2627]]

            (3) in subsection (b), by striking the subsection 
        designation and all that follows through ``Costs of 
        construction'' in paragraph (1) and inserting the following:

    ``(b) Costs Payable From Lower Colorado River Basin Development 
Fund.--
            ``(1) In general.--Costs of construction'';
            (4) in subsection (c), by striking ``(c) Costs of 
        construction'' and inserting the following:

    ``(c) Costs Payable From Upper Colorado River Basin Fund.--Costs of 
construction''; and
            (5) in subsection (e), by striking ``(e) The Secretary is'' 
        and inserting the following:

    ``(e) Upward Adjustment of Rates for Electrical Energy.--The 
Secretary is''.

    Approved December 23, 2024.

LEGISLATIVE HISTORY--H.R. 7872 (S. 2514):
---------------------------------------------------------------------------

HOUSE REPORTS: No. 118-709 (Comm. on Natural Resources).
CONGRESSIONAL RECORD, Vol. 170 (2024):
            Dec. 3, considered and passed House.
            Dec. 10, considered and passed Senate.

                                  <all>